2010, 09-13 Permit App: 10002870 Reanchor Deck RoofP,oject Number: 10002870. Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/13/2010 Page 1 of 2
Project Information:
Permit Use: REATTACH ROOF OVER DECK (JACK UP &
REANCHOR)
Setbacks: Front
Site Infonnation:
Plat Key:
Left: Right: Rear:
Contact: CAPSTONE CONSTRUCTION CO
Address: 2917 E FRANCIS AVE
C - S - Z: SPOKANE, WA 99208
Phone: (509) 468-4981
Group Name:
Project Name:
Name: Range
District: Soul
Parcel Number: 35231.1159
SiteAddress: 501 S HOWE RD
Block: Lot:
Owner: Name: CALLESTO, RICHARD & ANNETT
Address: 501 S HOWE ST
Location:: CSV SPOKANE VALLEY, WA 99212
Zoning: MF -2 MF HDR District
Water District: 100 SPO CO WATER DIST#3A Hold: ❑
Area: 11,100 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 9/13/2010 By: TMELBOU
Permits •
Building Permit
Contractor: CAPSTONE CONSTRUCTION Firm: CAPSTONE CONSTRUCTION
Address: 2917 E FRANCIS Phone: (509) 468-4981
SPOKANE WA 99208
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB PLAN 0 $17,400.00 0 $17,400.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $17,400.00 0 $17,400.00
Units Unit Desc Fee Amount
1 SELECT $293.25
1 SELECT $4.50
1 SELECT $117.30
Operator: jmm Printed By: jmm
Permit Total Fees: $415.05
Print Date: 9/13/2010
Project Number: 10002870 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/13/2010 Page 2 of 2
Notes:
Payment Summary: , -
Permit Type
Building Permit
Fee Amount Invoice Amount
$415.05 $415.05
Amount Paid
$117.30
Amount Owing
$297.75
$415.05 $415.05 $117.30 $297.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not he construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 9/13/2010
Permit Center
Scmor 11703-E-Spra Ave, Suite B-3
p®kane rSpokanelkalley/WA'99206Tc
Valle® I(509)688-0036ppAX:'(SO9)688-0037
Y wwwksnokanevallev.orp Qn
men[ sEI' Uin
Community Develop
Residential Construction;
Permit Application:ne
SubmiUai #
PERMIT NUMBER:
PERMIT FEE:
New Construction ❑ Accessory Bldg
Addition/Remodel Deck
n Other:
SITE ADDRESS: Sol S. t\OWL RAI •
3poka-0. 1 st,i1z5 , wkr-
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building' Owner: -
Contractor: •
Name: P,; e
k C,4\„ it,
MAIN FLOOR TOl SQ.
N
FTG: IV/
Name: Cgm) 5fo . Coos
Address: ,actii �Nc
City: S ij,(✓�It� ar State:
Phone: Li bcti_y_i_tQ1 B 1 Fax:
I ]]
Trt.GTt
,1 5'
uY
LI6%
A.a
6r
CtJG
Zip:41oti)Og
' Sc' $ `
Address: so C 0.0,...,4_VCA •
4_ tea.
City: S�
4ali_ L, E5 State:�Zip:se1 a,a
Phone: 953 _ 3 goy Fax:
M
# OF BEDROOM
Contractor Lic No: C9p54cc Ip',5xp Date:
.Contact Person
SEWER OR SEPTIC?
City Business Lic. No:
Name:
Phone:
Describe the scope of work in detail:
Cost of Project: $ nlypp. o (L
C tf AS C..IC C 0-1001( tk ‘‘ WH.0610 r-)
Proposed Use:
**************The followine MUST be comalete: (write N/A if not annlicable)**********************
Rt wH'bcl'1 Qca7P
HEIGHT TO PEAK:IB
N
DIMENSI NS'
311 X t
# OF STORIES:
TOTAL HABITABLE SPACE:
Gla.
MAIN FLOOR TOl SQ.
N
FTG: IV/
2"u FLOOR SQ. FTG:
n)�
UNFIN B SEMENT SQ. FTG:
Iva
IMPERVIOUS SURFACE
AREA: y
FINISHED BAS MENT
SQ. FTG: ✓b
GARAGE SQ. FTG:
V✓0-
DECK/CO--V11 PATIO SQ. FTG:
'V
30% SLOPES ON
PROPERTY: ton,
M
# OF BEDROOM
CONSTRUCTLON TYPE:
A
HEAT SOURCE:N o-
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
0 Cash
Bankcard #:
Authorized Signa
REVISED 2115/07
0 Check
DATE:
0 Mastercard ❑ VISA
Expires: VIN#:
$CITY OF7 C
po ane
\TaJfry 6
11703 E Sprague Ave Suite B-3 1' Spokane Valley WA 99206
.509.688.0036 • Fax: 509,688.00374 permitcenter®spokanevalley.org
For City Use Only
PLUS Project Number / 0 e0-870
Project Address '660/ S.. ALE giP/
As part of our on=going' commitment to 'customer service, during the' review process'of your project:
application, weare providing you with a TARGET DATE -for the initial. technical application review. If for
any reason we cannot meetthis date, we will contact you with a revised target, date': I '
Your application review TARGET DATE is
The TARGET DATE is the date 'we 'estimate, your project application :will have' had it's, initial technical
review. Itis notthe date for approval or permit issuance.
1/71/0
Tips for a Smoother Project Application Review``
Subniit complete, accurate plans and documents. , - - -
h:rno tinre.mai he requirecl for, re-subminals as project application revien-ers ,irh a
orn niti/tiple applications.;and i/ '
may be several clairs hc/ai c they can' look al roue new or /erased inlarntatinn.' ' -
Designate a specific contact' person to communicate with the City.
11'hi/e the person designated as -the applicant's contact person a 11h 1he,Cilt "can, he' changed,, one indiyichicil. with dee'
ca-perlise /or dealing with re richer comments lroald he the best choice:fin- n- /he.entir c'reyicn process. . • ,
Call staff regarding the status of your project only after the target date shown at the top ol•the,page., ".
Although inti .should be'contacted on.ar hr the target date, please feel. free'to contact us i/eon haven:'1 hemidJi-ant urs
by your largel date: Staff may contact ion he/in-e. the target date if the, initial1cvietr'is complete: By,folloiring this.
• procedure, rou will 'save time and allot- the reviewers to complete the work tunic e.tpeditioush'.,' -'
Steps in the Permit Process
•
1. Counter Complete. Your application has' been accepted as counter. complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted [or have been ,approved: for deferred.
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.:
2, QualityCheck, Thenext; step in:the process is a quality check
to make sure that, the applicationis reviewable' and free
from substantive flaws that would prevent technical staff froni'completing the technical rcvtew:once it started'. ;When .
this step is complete, your
comes up for review. '
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance •
review. Depending on the type of Project, 'technical staff may'include multiple reviewers. You should be contacted by
phone, lax, email, or mail by your TARGET DATE once the initial technical compliance' review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any -subsequent re -
submittals, each reviewer will approve their Section of the application and route if fo the Permit Center. When all sections
of the application are received. d Permit Specialist will process the application:and contact the` person.specifiedon your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will beprovided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE '
REV 9/07