2010, 08-13 Permit: 10002494 Mechanical Fixtures.�; Sane
e�
j Valley°
PERMIT CENTER
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
1
Site Information
Project Information
Site Address: 204 N HUTCHINSON RD
Parcel Number: 45184 0919
Subdivision:
Block:
Lot:
Zoning: R-4 SF Res Urban District
Owner: RIEKEN, AMARA E
Address: 204 N HUTCHINSON RD
SPOKANE VALLEY WA 99212
Building Inspector: NORTH
Water Dist: HUTCHINSON
Project Number: 10002494 Inv: 1 Issue Date: 08/13/2010
Permit Use: 1 FUEL BURNING APPLIANCE, 1 FUEL BURNING
WATER HEATER
Applicant: HURLIMAN HEATING
515 S DISHMAN RD
SPOKANE WA 99206
Contact: HURLIMAN HEATING
515 S DISHMAN RD
SPOKANE WA 99206
Phone: (509)891-5110
Phone: (509)891-5110
Setbacks - Front: Left: Right: Rear:
Group Name:
Project Name:
1 Permits 1
Mechanical Permit Contractor: HURLIMAN HEATING & A/C INC
License #: HURLLHA051 D4
GAS WATER HEATER
PROCESSING FEE
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
$11 00 GAS APPLIANCE<=100,00013T 1 $13 00
$37.00
Total Permit Fee:
561.00
Payment Summary
Total Fees AmountPaid AmountOwing
$61.00 $61.00 $0.00
Tran Date Receipt # Payment Amt
08/13/2010 23856 $61.00
Processed By: Main. Jodi L
Printed By: MORRIS, HEATHER I'age 1 of I
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and pnor to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the venfication or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final Inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants. fire department access,
on-site drainage (208 swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover
RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or matenal which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permts and Inspections fa electrical winng, State Department of Labor Permits and inspedions for Sewer Connection. Spokane County UWities DiNsica
And Indusines 324-2640 477-3604
Permits and Inspections for on-site septic systems. Spokane Regional Fne spnnkier and alarm systems and pnvaie access road inspections. Spokane Valley
Health Distnet 324-1560 Fire Department 892-4122
Slate law RCW 19.122 requires that pnor to any excavation the "CALCBEFORE YOU DIG'centermust be notified Gall before you dig at least 2 working days in advance. 456-8000
PERMIT'EXRIRATIO — ND REFUNDS
All permits shall expire by limitation and be declared void if a) work,is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of'a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent Date
Staff Approval Date
Receipt Number: 23856
Projects
Miscellaneous Items
City of Spokane Valley
Building Dept
Receipt
Customer Number
Full
Project Nbr Inv Nbr Fee Amt Inv Amt Owing PAID Pint
10002494 1 , .$61.00 .'. __ $61.00_i I_._ $61.00 i $61.00
Totak L. _$61.00. _$61.00] r
$61.00
Total PAID: $61.00
Tender
'Type Check Acct Balance CC Nbr Exp Date TENDERED
.VISA
xxxxxxxxxxxx4144 i 05/2013 61.00
jPayer:
Total TENDERED: 61.00
Over / (Short) $0.00
Change $0.00
Notes:
Tran Date /Time: 08/13/2010 4:08:41 PM
By: HMORRIS
Logon User: BldgCounter
Station: CX SV00014A
Override By:
Printed: 08/13/2010 4:08:44 PM Page 1 of 1