Loading...
2007, 08-01 Permit: 07002821 ResidenceSpokane fl Valley® BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 11710 E JACKSON LN Parcel Number: 45091.3026 Subdivision: Block: Lot: Zoning: UR -2 Urban Residential -22 Owner: SVG VIEW RANCH, LLC Address: 2910 E 13TH AVE SPOKANE, WA 99202 - Building Inspector: DOUG POWELL Water Dist: IRVIN Project Number: 07002821 Inv: 1 Issue Date: Permit Use: SINGLE FAMILY RESIDENCE -SEWER 1 08/01/2007 Applicant: RICHARDSON HOMES P.O. BOX 28941 SPOKANE, WA 99228 Phone: (509) 994-2832 Contact: RICHARDSON HOMES P.O. BOX 28941 SPOKANE, WA 99228 Phone: (509) 994-2832 Setbacks - Front: 20 Left: 7 Right: 8 Rear: 21 Croup Name: Project Name: 1 Permits Building Permit Contractor: RICHARDSON HOMES INC Building Height 27 License f/: RICHAI11099BW I &2 FAMILY 2ND FLOOR BASEMENT U DECK OPEN GARAGE Total Value: FOR BUILDING INSPECTIONS CALL (509) 688-0054. R-3 VB 626 R-3 VB 956 R-3 VB 626 R-3 VB 61 U-1 VB 424 $146,946.44 RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ Ff Total Permit Fee: $1,256 95 $4 50 $502.78 $1,764.23 • Mechanical Permit Contractor: RICHARDSON HOMES INC License#: RICHAH1099BW GAS WATER HEATER AIR CONDITIONER:4-15 TONS GAS LOG OR GAS INSERT FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. $10.00 GAS APPLIANCE<-100,000BT I $12.00 $20.00 VENTILATING FANS 5 $50.00 $10.00 Total Permit Fee: $102.00 Plumbing Permit Contractor: RICHARDSON HOMES INC TOILETS/BIDETS SHOWERS GARBAGE DISPOSAL FLOOR DRAINS FOR PLUMBING INSPECTIONS CALL (509) 688-0054. License it RICHAI-11099BW 3 $18.00 2 $12.00 1 $600 1 $6.00 SINKS DISH WASHERS CLOTHES WASHER MISCELLANEOUS FIXTURES Total Permit Fee: 6 $36 00 1 $600 1 $600 3 $18.00 $108 00 Processed By: Main, Jodi L Printed By: TURBAK, MIKE Page 1 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily Indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, braang and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants. fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy: completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — pnor to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes Interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Pemvts and inspections for eiecmcal vnnng, State Department of Labor Permts and inspections for Sewer Connection. Spokane County Uiilwes Division And lndustnes 324-2640 477.3604 Permits and Inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections. Spokane Valley Health Drstnct 324-1560 Fire Department 892-4122 State law RCW 19122 requires that pnor to any excavation the -CALL BEFORE YOU DIG -center must be notified. Call before you dig at least 2 working days in advance. 45643000 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authonzed when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date *Wane� Valley BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 11710 E JACKSON LN SPOKANE VALLEY, WA 99206 Parcel Number: 45091.3026 Project Number: 07002821 Inv: I Issue Date: 08/01/2007 Permit Use: SINGLE FAMILY RESIDENCE -SEWER Permits Payment Summary Total Fees AmountPaid AmountOwing $1,974.23 $1.974.23 $0.00 Tran Date Receipt # Payment Amt 08/01/2007 10667 $1,974.23 Processed By: Main, Jodi L Printed By: TURBAK, MIKE Page 2 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes NOTE: This inspection includes review of the structure's setback from property lines Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the Installation of fire hydrants, fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc installed, and prior to occupancy: completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permts and inspections for eiectncal winng, State Department of Labor Perdu is and inspections for Sewer Connection, Spokane County Utilities Diasion And lndustnes 324-2640 477-3694 Permits and inspections fa on-site septic systems, Spokane Regional Fre spnnkier and alarm systems and pnvaie access road inspections. Spokane Valley Health Distnct 324-1560 Fire Department 892-4122 Stale law RCW 19122 requires that pnor to any excavation the -CALL BEFORE YOU DIG -center must be notified Cal before you dig al least 2 working days in advance, 456-8000 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed Owner / Date r—x-07 Staff Approval Date