2010, 04-08 Permti App: 10000930 RemodelProject Number: 10000930 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/8/2010 Page 1 of 3
Project Information:
Permit Use: ADD FRAMING, PLUMBING & DRYWAL FOR Contact: C AND D BUILDERS
BATHROOM IN BSMT Address: 19015 S ASPEN MEADOWS DR
C - S - Z: CHENEY, WA 99004
Setbacks: Front Left: Right: Rear: Phone: (509) 235-5878
Group Name:
Site Information: Project Name:
Plat Key: 001170 Name: HEATHER PARK 01ST ADD
District: Sout
Parcel Number: 35261.1411 Block:
SiteAddress: 1814 S KOREN ST
Location:: CSV
Zoning: R-2
Lot:
Owner: Name: FALK, GREGORY J & SHARON R
Address: 1814 S KOREN ST
SPOKANE, WA 99212-3264
SF Res Suburban District
Water District: 098 SPO CO WATER DIST#1 Hold: ❑
Area: 12,600 Sq Ft
Width: 90 Depth: 140 Right Of Way (ft): 50
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Sewer Review
Permits:
Originally Released:
4/8/2010 By: tmelbourn
Released By:
PER 94009878 - MT
Originally Released: 4/7/2010 By: mturbak
Operator: jmm Printed By: jmm Print Date: 4/8/2010
Project Number: 10000930 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/8/2010 Page 2 of 3
Contractor: C AND D BUILDERS
Address: 19015 S ASPEN MEADOWS DR
CHENEY, WA 99004
Description Gr Type
1&2 FAMILY R-3 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Building Permit
Firm: C AND D BUILDERS
Phone: (509) 235-5878
This Application: Total Project:
Notes Su Ft Valuation So Ft Valuation
BSMT 0 $8,000.00 0 $8,000.00
BATHROO
M
Contractor: C AND D BUILDERS
Address: 19015 S ASPEN MEADOWS DR
CHENEY, WA 99004
Item Description
TOILETSBIDETS
SINKS
SHOWERS
WATER PIPING - DWV
Totals: 0 $8,000.00 0 $8,000.00
Units
1
1
1
Unit Desc
SELECT
SELECT
SELECT
Permit Total Fees:
Plumbing Permit
Fee Amount
$153.25
$4.50
$61.30
$219.05
Finn: C AND D BUILDERS
Phone: (509) 235-5878
Units Unit Desc
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
Operator: jmm Printed By: jmm
Fee Amount
$6.00
$6.00
$6.00
$6.00
Permit Total Fees: $24.00
Print Date: 4/8/2010
Project Number: 10000930 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/8/2010 Page 3 of 3
Notes: „..w . .. ,.. ,. _
Posted stop work order for re roof without a permit.
CONTOL AREA FOR DRAINAGE MORITORIUM SEE MAPS FOR SPECIFICS
Payment Summary:.
Permit Type
Building Permit
Plumbing Permit
Fee Amount Invoice Amount
$219.05 $219.05
$24.00 $24.00
Amount Paid
$61.30
$0.00
Amount Owing
$157.75
$24.00
$243.05 $243.05
$61.30 $181.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 4/8/2010
Spokane
_Valleyy
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER: L
PERMIT FEE:
n New Construction Accessory Bldg
iXAddition/Remodel n Deck
n Other:
SITE ADDRESS: I I I kcR P ' j. 1), s pc). \i Y 4 9c( -z_ l 2_
ASSESSORS PARCEL NO: 3S) c l - l "I 1/ LEGAL DESCRIPTION: Lo f- / ' 81 o c & ( i u a^ Jia r
Ao1ct h ort
Building Owner:
DIMENSIONS:
/0-%i 1(
2"D FLOOR SQ. FTG:
„ `/ n
# OF STORIES:
UNFIN BASEMENT SQ. FTG:
AJ/^
P `TIO
Name: C4A/DA.
EL)6._ v...01..._
FINISHED BASEMENT
SQ. FTG: /,CCC
Address: Jc/y
S l:b(Zt=-n/ RD,
30% SLOPES ON
PROPERTY:
City: SPo. 1//d-L1,
State: ��
Zip:C��q7.(�
Phone: oc1 _ S 4'
- 2_0e-! Fax:
Contact Person
Name: c/4/41-3
Phone: ,rb :f " 5-7q6"
Describe the scope of work in detail:
Contractor:
DIMENSIONS:
/0-%i 1(
2"D FLOOR SQ. FTG:
„ `/ n
# OF STORIES:
UNFIN BASEMENT SQ. FTG:
AJ/^
P `TIO
Name: C/ k.�- S C. 6: a- T v
MAIN FLOOR TO SQ.
FTG: / 566
FINISHED BASEMENT
SQ. FTG: /,CCC
Address:/ C61- S, •4- rux %b'11, -.7,40c kA/5
Da.,
30% SLOPES ON
PROPERTY:
City:/-iL, State: k., -/Zip:
���
HEAT SOU CE:
67
Fax:
Phone: c ci , 2 `34 - 5 g"-7 �l
) I occc-i:TD 4-
Contractor Lic No: Exp Date:
City Business Lic. No:
Cost of Project: $ G�C�, UL vt ---
,4 r-rtttrc c /L't .� Hen •' 4 = i i &=141 T f 6") ?(')Nt. JC-
pfa
Proposed Use: R,4 -T lfi2c)Ot
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
nr/%
DIMENSIONS:
/0-%i 1(
2"D FLOOR SQ. FTG:
„ `/ n
# OF STORIES:
UNFIN BASEMENT SQ. FTG:
AJ/^
P `TIO
TOTAL HABITABLE SPACE:
IMPERVIOUS SURFACE
AREA:
MAIN FLOOR TO SQ.
FTG: / 566
FINISHED BASEMENT
SQ. FTG: /,CCC
GARAGE SQ. FTG:
DECK/COV. SQ. FTG:
Al
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOU CE:
67
SEWER OR SEPTIC?
Sty 1.'"/ L /Z
) I occc-i:TD 4-
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: ,
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/D7
❑ Check
❑ Mastercard
Expires:
DATE: i : /7/-io
❑ VISA
VIN#:
APR
s° e
.: jve,x
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
permitcenter@u,spokanevallev.org
PERMIT NUMBER:
PERMIT FEE:
Community Development
Plumbing Permit Application ❑ Commercial P Residential
SITE ADDRESS: (1(/ '1 � : /W-1-7--/ J R D . sPo, V/d �c c. Y u✓A- Q 2-1
Z
Building Owner
' /
Name: G� LW v Z= Phone: 5-6i 5.-4, ' I c4 Fax:
-1-
Address: i c{ ( r -f 5, Kron t= /t/ E2 0, City: S f'a v4 J=y State: w d Zip: -q 2) 2
Contractor
Name:Phone: Fax:
C 1-i%L.rS l�c.r�vc� .rod - z_3 S�-S�r7�
Address: (CI o (-i s. A-Sf'6/LJ l�/2, City: e(44, -.7v -y- State: (,tii./_ Zip: C?C7C y
,41&;4470t.41S
License No: L! 11 19 j pi g G / / K- (7 City Business Lic:
l Flo
Contact/Project Manager:
Name: e/..//Z-z- /� `
nZ� t- �/✓L� Phone: 4.-061 ' ` /t gel l ' - 7 e e
# OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS
I
URINALS
TUBS
SHOWERS (per trap)
1
SINKS
Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food,
Prep/Culinary Meat
DISHWASHER
CLOTHES WASHER
GARBAGE DISPOSAL
WATER SOFTNER
FLOOR DRAIN
Area, Case, Coil, Trench, Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN, DRINKING
WATER PIPING/DRAIN-IN WASTE
Installation, Alterations, Repair, Reversals
!
WATER USING DEVICE
Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER
If Gas, See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS
Including traps, vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION
Water piping, drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE
Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
❑CASH ❑ CHECK 0 VISA ❑ MC
Card#
SIGNATURE:
EXPIRES:
VIN:
CURRENT FEES AVAILABLE AT: http://www.spokanevallev.orq/ under the quick links for Forms, Master Fee Schedule.
http://www.spokanevalley. org/uploads/Community_Development/Documents/Forms/Building/PlumbingPermitApplication040309.doc
SpokaneValley®
For City Use Only
PLUS Project Number
Project Adplress
f)
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a r vised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard fromus
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK- BUILDING FILE REV 9/07