2012, 09-27 Permit: SW-12002277 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002277
Permit Issued Date:
09/27/2012
Expiration Date:
Project Description SEWER CONNECTION
Project Name: VALLEYVIEW
Permit Type: SEWER
Primary Contact GOBER'S LLC
Applicant: GOBER'S LLC
Address' 11215 E TRENT AVE
SPOKANE, WA 99206
Phone: 509-924-5372
Email:
SITE INFORMATION;
Site Address: 1829 3 LAKE RD Owner: WADE, ROGER D & ELIZABETH R
Parcel Number: 35252.1506 Address. 1829 S LAKE RD
SPOKANE VLY, WA 99212-3227
Subdivision: VALLEY VIEW HILLS Phone.
FOURTH ADDITION
Assessor's Description: VALLEY VU HILLS 4TH ADD LT 3 BLK 1 EXC N20' Email:
Inspection Area:
Water District: Spokane Fire District: Fire District 8
County Water District #3
Zoning Land Area: 17620 Square Feet
CONTRACTOR INFORMATION'
General Contractor
GOBERL'899L7
GOBER'S LLC
11215 E TRENT AVE
SPOKANE, WA 99206
509-924-5372
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS•
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 09/27/2012 08:02:31
Printed by 116 APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002277 09/27/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER I5 TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed. 09/27/2012 08'02:31
Printed by IIS APPPOOL\ASP NET v4.0