Loading...
2013, 05-21 Permit: SW-13000787 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000787 Permit Issued Date: 05/21/20 '3 Expiration Date: 05/21/2014 Project Description: SEWER CONNECTION Project Name: VALLEYVIEW Primary Contact: KALIN EXCAVATION Applicant: KALIN EXCAVATION Phone: 509-954-9101 Address: 9229 E WOOLARD RD COLBERT, WA 99005 Phone: 509-954-9101 Email: SITE INFORMATION: Site Address. 1922 S LAKE RD Owner: Parcel Number: 35252.1902 Address: 811 E PINE TREE DR SPOKANE, WA 99208 Phone: Assessor's Description: VALLEY VIEW HILLS SIXTH ADD L2 B2 Email: Inspection Area: : (509)-477-3675 Water District: Spokane County Water Fire District: Fire District 8 District #3 Zoning: LDR Land Area: 12240 Square Fee BRASCH, THOMAS C & KRISTA LYNN CONTRACTOR INFORMATION: KALINE*04318, Exp. 03/31/2015 KALIN EXCAVATION 9229 E WOOLARD RD COLBERT, WA 99005 509-954-9101 DETAILS: Class Type Quantity Unit Charge Value SEWER FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION 1 $125.00 $125.00 Total Fee: $26.32 $125.00 $151.32 $125.00 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. Date Printed: 05/21/2013 14:38:49 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000787 Permit Issued Date: 05/21/2013 Expiration Date: 05/21/2014 THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed' 05/21/2013 14 38:49 Project Coordinator: Kathy Cummings