2012, 06-28 Permit: SW-12001656 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001656 .
Permit Issued Date:
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: VALLEYVIEW
Permit Type: SEWER
Primary Contact: LAUER EXCAVATION & CONST
Applicant: LAUER EXCAVATION & CONST
Address: PO BOX 11581
SPOKANE VALLEY, WA 99211
Phone: 509-893-9070
Email:
SITE INFORMATION:
Site Address: 1926 S LAKE RD Owner: COOMBS, GEORGE Y & SANDRA L W
Parcel Number: 35252.1901 Address. 1926 S LAKE RD
SPOKANE VALLEY, WA 99212
Subdivision: VALLEY VIEW HILLS Phone'
SIXTH ADDITION
Assessor's Description: VALLEY VIEW HILLS SIXTH ADD L1 B2 Email:
Inspection Area:
Water District: Spokane Fire District. Fire District 8
County Water District #3
Zoning: Land Area: 0.3214 acres / 14001 sgft
CONTRACTOR INFORMATION:
General Contractor
LAUEREC931DA
LAUER EXCAVATION & CONST
PO BOX 11581
SPOKANE VALLEY, WA 99211
509-893-9070
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
• CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 06/28/2012 15:45:53
Printed by: IIS APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001656
Permit Issued Date:
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/28/2012 15:45.53
Printed by: IIS APPPOOL1ASP.NET v4.0