Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2008, 03-11 Permit App: 08000827 Remodel
Project Number: 08000827 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/11/2008 Page 1 of 2 Project Information: Permit Use: INTERIOR REMODEL DUE TO SMOKE DAMAGE Contact: LEWIS, GARY C & JONNIE J Address: PO BOX 958 C - S - Z: NEWMAN LAKE, WA 99025 Setbacks: Front Left: Right: Rear: Phone: (509) 220-6314 Group Name: Site Information: Project Name: Plat Key: Name: PARK NORA SUB District: Nort Parcel Number: 35131.0407 Block: SiteAddress: 1406 N LILY RD Location:: CSV Lot: Owner: Name: LEWIS, GARY C & JONNIE J Address: PO BOX 958 NEWMAN LAKE, WA 99025 Zoning: R-3 SF Res District Water District: 100 SPO CO WATER DIST#3A Area: 10,400 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Permits: Released 1 Originally Released: 3/11/2008 By: TMELBOU Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB REMODEL 0 $20,000.00 0 $20,000.00 Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $20,000.00 0 $20,000.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Operator: jmm Printed By: jmm Fee Amount $321.25 $4.50 $128.50 Permit Total Fees: $454.25 Print Date: 3/11/2008 Project Number: 08000827 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/11/2008 Page 2 of 2 Notes: "MMINKRIMMINIONOMP Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $454.25 $454.25 $0.00 $454.25 $454.25 $454.25 $0.00 $454.25 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 3/11/2008 Spokane jValler Community Development Residential Construction Permit Application remit Lerner 11703 E Sprague Ave, Suite B-3 RECEIVED BY Spokane Valley, WA 99206 SPOKANE VALLEY (509)688-0036 FAX: (509)6:0 `V www.spokanevallev.org MAI 1 1 Z,UUr PERMIT NUMBER:' V O PERMIT FEE: ArtWruction Accessory Bldg Addition/Remodel ❑ Deck Other: / SITE ADDRESS: t Lip 6. ! `t n� • L.i L- ( R0 ASSESSORS PARCEL NO: 3.6 1 3 1 . o C) LEGAL DESCRIPTION: pfrn/A Pwikp L_7 1341 f 6Fogw. Building Owner: HEIGHT TO PEAK: c6; Name: G Ar\i 4-T, IAA) 62 i •5 Address: pc. Fl ox 1 t MAIN FLOOR TO SQ. FTG: City:EL4.)m14k. LA— State: l.t.) 4 14 Zip-1,1025] Phon : Fax: ('5 ) .o--b3i'-t City: Contact Person Name: 1p (Z"1 L_?L) 15 Phone: (_ o cl La 2 -- Contractor: HEIGHT TO PEAK: c6; DIMENSIONS: X �- Name: 01.0 h -C 212., TOTAL HABITABLE SPACE: =1 - 7 �- SQ _ FT - MAIN FLOOR TO SQ. FTG: Address: UNFIN BASEMENT SQ. FTG: N `E AiNi -ARE4k: IMPERVIOUS SURFACE City: State: Zip: Phone: Fax: CONSTRUCTION TYPE: ki-)000 Fr< Contractor Lic No: Exp Date: City Business Lic. No: Describe the scope of work in detail: ,Cost off Project$y (-2 LL ?�-1' r c- i'L-/N6. F-i,�►iN� iIz.c 2 x Px i,(5 » ob A / I. MEL) R c -- Proposed Use: & & Fzith, �, (4e7:4 •MUST be %,.....y.,,...• • (write N/A if not applicable)********************** 111C It/1R mg HEIGHT TO PEAK: c6; DIMENSIONS: X �- # OF STORIES: TOTAL HABITABLE SPACE: =1 - 7 �- SQ _ FT - MAIN FLOOR TO SQ. FTG: �2Gt 2 FLOOR SQ. FTG: N (A UNFIN BASEMENT SQ. FTG: N `E AiNi -ARE4k: IMPERVIOUS SURFACE FINISHED BASEMENT SQFTG: At ///- GARAGE SQ. FTG: �j (. 662. DECK/COV./PATIO PATIO SQ. FTG: I it 30% SLOPES N // tki . PROPERTY: # OF BEDROOMS: 2--- CONSTRUCTION TYPE: ki-)000 Fr< HEAT SOURCE: ::-/— /S ( c_. SEWER OR SEPTIC? .� ? c_... The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before / 066( this application c•©be processed. SIGNATURE: +4/ C / DATE: 30/ Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 0 Check ❑ Mastercard Expires: to VISA VIN#: For City Use,Only PLUS Project Number ,x. Project Address 1-/, 11703 E Sprague Ave Suite 8-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is I 1 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Project llle Transmittal Va ley City of Spokane Valley Community Development Departrnent 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Site Address: 1406 N LILY RD Parcel Number: 35131.0407 Zoning: R-3 Fire District: FD 01 New project Previous pre -app meeting 0 Plan revisions 0 Transmittal Date: Tuesday, March 11, 2008 Project Number: 08000827 Water District: SPO CO WATER DIST#3A Applicant: LEWIS, GARY C & JONNIE J Owner: LEWIS, GARY C & JONNIE J PO BOX 958 PO BOX 958 NEWMAN LAKE, WA 99025 NEWMAN LAKE, WA 99025 (509) 220-6314 e-mail: e-mail: Contact: LEWIS, GARY C & JONNIE J Occupant: PO BOX 958 e-mail: NEWMAN LAKE, WA 99025 (509) 220-6314 e-mail: Contractor: OWNER () - 0 Arch / Engineer: e-mail: D) ;. _9, BVI (► [l, Project INTERIOR REMODEL DUE TO SMOKE DAMAGE Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO CONSTRUCTION PLAN 3 Please send all plan review and project comments via e-mail to the highlighted individuals. cr , LJJ 't 4, 4 •4';" �fi D til - Gr i L (W PA-sc-E. L. # 3 0 c 7 itiktn L D o2'? !o c=g 1 i / N G. db l5`5 9/S1 (5Le it c M. L) to 'fl Ori ( fit- L[J ! N '01 111:y L--- ' 1 ) G bc 5/ NW. 1 DE -7 -tE1i- I h .f5 ''Zbt..) a_��� L 7 tit G:-/cA �itC- WASHINGTON STATE ENERGY CODE TABLE 6-2 PRESCRIPTIVE REQUIREMENT S°'1 FOR GROUP R OCCUPANCY CLIMATE ZONE 2 Option I. IV. V. VI. VII. Glazing Area10: % of Floor 12% 15% 17% 25% Group R-1 and R-2 Occupancies Only Unlimited Group R-3 and R-4 Occupancies Only Unlimited Group R-3 and R-4 Occupancies Only Unlimited Group R-1 and R-2 Occupancies Only Glazing U -Factor Vertical Overhead' l Door 9 U -Factor Ceiling2 Vaulted Ceiling3 Wa1112 Above Grade Wall• into Below Grade Wall• ext4 Below Grade Floors Slab6 on Grade 0.35 0.58 0.20 R-38 R-30 R-21 int7 R-21 R-12 R-30 R-10 0.35 0.58 0.20 R-38 R-30 R-19 + R-58 R-21 R-12 R-30 R-10 0.32 0.58 0.20 R-38 R-30 R-19 + R-58 R-21 R-12 R-30 R-10 0.35 0.58 0.20 R-38 / U=0.031 R-30 / U=0.034 R-21 int7 / U=0.054 R-15 R-12 R-30 / U=0.029 R-10 / F=0.54 0.35 0.58 0.20 R-38 R-30 R-19+ R-58 R-21 R-12 R-30 R-10 0.30 0.58 0.20 R-49 or R-38 Adv R-38 R-21 int7 R-21 R-12 R-30 R-10 0.32 0.58 0.20 R-38 / U=0.031 R-30 / U=0.034 R-21 int7 / U=0.054 R-15 R-12 R-30 / U=0.029 R-10 / F=0.54 * Reference Case 0. Nominal R -values are for wood frame assemblies only or assemblies built in accordance with Section 601.1. 1. Minimum requirements for each option listed. For example, if a proposed design has a glazing ratio to the conditioned floor area of 13%, it shall comply with all of the requirements of the 15% glazing option (or higher). Proposed designs which cannot meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 of this Code. 2. Requirement applies to all ceilings except single rafter or joist vaulted ceilings complying with note 3. 'Adv' denotes Advanced Framed Ceiling. 3. Requirement applicable only to single rafter or joist vaulted ceilings where both (a) the distance between the top of the ceiling and the underside of the roof sheathing is less than 12 inches and (b) there is a minimum 1 -inch vented airspace above the insulation. Other single rafter or joist vaulted ceilings shall comply with the "ceiling" requirements. This option is limited to 500 square feet of ceiling area for any one dwelling unit. 4. Below grade walls shall be insulated either on the exterior to a minimum level of R-12, or on the interior to the same level as walls above grade. Exterior insulation installed on below grade walls shall be a water resistant material, manufactured for its intended use, and installed according to the manufacturer's specifications. See Section 602.2. 5. Floors over crawl spaces or exposed to ambient air conditions. 6. Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed according to manufacturer's specifications. See Section 602.4. 7. Int. denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. 8. This wall insulation requirement denotes R-19 wall cavity insulation plus R-5 foam sheathing. 9. Doors, including all fire doors, shall be assigned default U -factors from Table 10-6C. 10. Where a maximum glazing area is listed, the total glazing area (combined vertical plus overhead) as a percent of gross conditioned floor area shall be less than or equal to that value. Overhead glazing with U -factor of U=0.40 or less is not included in glazing area limitations. 11. Overhead glazing shall have U -factors determined in accordance with NFRC 100 or as specified in Section 502.1.5. 12. Log and solid timber walls with a minimum average thickness of 3.5" are exempt from this insulation requirement. Effective July 1, 2007 34 r�_ I 7 EMERGENCY EGRESS REQUIREMENTS FROM SLEEPING ROOMS NET CLEAR OPENING 5 7 SQUARE FEET GRADE FLOOR OPENING (MAX 44') 5 0 SQUARE FEET ) NET CLEAR OPENING HEIGHT 24 INCHES NET CLEAR OPENING WIDTH 20I INCHES ABOVE FLOOR 4) MAX FINtSHEO SILL HEIGHT EMERGENCY ESCAPE & RESCUE OPENING SHALL BE OPERATIONAL f ROM THE INSIDE OF THE ROOM WITHOUT INF USE Of KEYS OR TOOLS WHEN INTERIOR ALTERATIONS, REPAIRS OR ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED IN EXISTING DWELLINGS, THE DWELLING UNIT SHALL BE PROVIDED WITH SMOKE ALARMS LOCATED AS REQUIRED FOR NEW DWELLINGS. SMOKE ALARMS SHALL BE INTERCOI NECTED AND HARD WIRED IN SUCH MANNER THAT THE ACTIVATION OF Or, ALARM WILL ACTIVATE ALL ALARM (BEDROOMS, AREAS APPROACHIN BEDROOMS, VAULTED CEILIN WITH RISE OF 24" & ON EACH FLOOR) EXHAUST FANS 100 CFM kitchen 50 CFM bathrooms & laundry G PCZ C. _ [Lo l `'S I l` - o N• 3.51314alc7 �, n rtLE. ,, c.- 14 L1 ti Lo. *—c15 75 k.3 I -r-14 yr X f`1 w 1-- L, t tL> LA --n �1 i 5 .s c v`.6/ ce ''�--- c:._�ll-.tivL " �G t L t H 6- /&-M.b ! LLS IZ 2 1 I F REa cei-D y L--. # felt for ice dam protection elcr- toR '-' 1 /8" GAP ( c),,—r itt: mss-8E;ATENLSHEATHING An, >J y32; (1.LY1,-A cel q b _7- !JG 1 FtE 41 l =5 rZ ff4i /v4Di?lorry IkLt_ CST 'G ---f Be_ u ' c=- 64 L, tit /Ftt cVer*iliiot) 1 Sq Ft per every 300 Sq Ft of space ventilated with at least 50% in the upper portion of roof area. Attic Accessible by 22' x 30" N1101.3.1 — Attic insulation certification required as to R — value or coverage. Markers, attached to trusses or rafters, required for every 300 sf of attic space with 1 inch high numbers for installed thickness of insulation. CEILING: %" GWB allowed if perpendicular to rafters or trusses 24" oc and no water based texture used — otherwise 5/8" GWB. Water -Resistive Barrier required under siding PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TC FIELD INSPECTION CORRECTIONS STOP:Y.7r REVIEVVEi - mf`JiPLi NCE SPOKANE Z' Z!..' G IDIVI ION k is -A- 3 ft