2009, 07-20 Permit App: 09002138 Pole BldgProject Number: 09002138 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/20/2009 Page 1 of 2
Project Information:
Permit Use: 30 x 40 POLE BLDG
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 001436 Name: LEATHA LANE ADD
Contact: SPOKANE STRUCTURES
Address: 510 N MULLAN ST
C - S - Z: SPOKANE, WA 99206
Phone: (509) 927-0655
Group Name:
Project Name:
District: Sout
Parcel Number: 45221.1601 Block:
SiteAddress: 304 S LEATHA LN
Location:: CSV
Zoning: UR -3.5 Urban Residential 3.5
Water District 010 VERA
Area: 12,180 Sq Ft Width: 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Lot
Owner: Name: MALM, WARREN & SUSAN
Address: 304 S LEATHA LN
SPOKANE VALLEY, WA 99216
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 7/20/2009 By: TMELBOU
Landuse/Zoning/HE Conditions
Permits:
ReleasedB
Y. ���
Originally Released: 7/17/2009 By: mbasinger
Operator: JD Printed By: .1D
Print Date: 7/20/2009
Project Number: 09002138 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/20/2009 Page 2 of 2
Building Permit
Contractor: SPOKANE STRUCTURES INC Firm: SPOKANE STRUCTURES INC
Address: 510 N MULLAN RD Phone: (509) 927-0655
SPOKANE, WA 99206
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
POLE BDLG U-1 VB 1,200 $22,800.00 1,200 $22,800.00
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Notes:
Totals: 1,200 $22,800.00 1,200 $22,800.00
Units Unit Desc
I SELECT
1 SELECT
1 SELECT
Fee Amount
$363.25
$90.81
$4.50
Permit Total Fees: $458.56
This permit is granted based on the structure not being used for storage of on -street vehicles. Should
the use of the structure be used for that purpose, the driveway will need to be paved and approved by
the City of Spokane Valley.
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$458.56 $458.56 $90.81 $367.75
$458.56 $458.56
$90.81 $367.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD
Print Date: 7/20/2009
Spokane
conOValley.
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
wtivw. spokaneval lev.org
PERMIT NUMBER: U
PERMIT FEE:
New Construction Accessory Bldg
❑ Addition/Remodel ❑ Deck
n Other:
SITE ADDRESS: 56 L/ E.' //LEgA-rea- /fin F J`/bt#-wev/ y �L — fi1�oZ/ ,
Y
ASSESSORS PARCEL NO: S RA/, /(d LEGAL DESCRIPTION:
Building Owner:
Name: % 4 p gEg) /' l 4.141
Address: 3Di cS. En_ L4-ltlt
Contractor:
Name:
CPOK?WE SnUCTURES, INC.
Address:
510 N. MULLAN ROAD
City: Spota4wt. that ie State:k,_ Zip 1
Phone, - 4; y Ssd7 Fax:
Contact Person
Name: Sere.. 0120/1924--
Phone:
'i2ooe&rPhone: SdoR- 44& - ogge
Describe the scope of work in detail:
City: SPOKANF VALLFV
Phone:
S09-977-0655
Contactor Lic No:
CPOVI)DI1 2000
City Business Lc. No:
State: Zip:
WA
Fax:
509-977-407
Exp Date:
1/1/03
9970,
Cost of Project: $ eittO
Igo SZ-' F s" IBvl Lt7irYG-
Proposed Use:
3 4o P / rote_
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
/y'
DIMENSIONS:,
ojef) o) /`F
4
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
fu FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
/01-00AREA:
FINISHED BASEMENT
SO. FTG:
ARAE SQ. FTG;
Ut
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY: i
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional i formation may be required to be submitted, and subsequently approved before
this application can b processed.
SIGNATURE: O DATE: ½CF!VCfl
BY
:_CITY OF SPOKA Nc ' "r LEY
JUL 1 "_ 2009
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/:5.07
❑ Check
❑ Mastercard
Expires:
❑ VISA
VIN#:
I-Cndiil L.c:a.._n
BY:
Spokane
Valley°
-J. :.'' `i 1 ` _,al..a..
For City Use Only
PLUS Project Number CPT fC12.13
D
Project Address •
-2•(-)LI c Qa s la
11703 E Sprague Ave Suite 8-3 • Spokane Valley WA 99206
509.688.0036 4 Fax: 509.688.0037 4 permitcenter@spokanevalley:org
As part of our on-going commitment to customer service during the, review, process of your project.
application, we are providing you with a TARGET DATE for the initial technicahapplication review. If for
any reason we cannot meet this date, we will contact you with a revised target date. . . ' .
c—r
•
Your application review TARGET DATE is lilt I r - 1
The TARGET DATE is the 'date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issi arice.
•
Tips fora Smoother Project Application Review -
i, Submit complete, accurate plans and documents.•
Extra time nury be required jor. re -.submittals as project, application reviewers wok on multiple applications and it
may be several days be%ore they can look at your new or revised information. -
i Designate a specific contact person to communicate with the_City. `
While the person designated as the applicant's contact person with the Citv.can be changed, one individual with the
expertise fondealing with reviewer comments would be the best choiceJbr the entire review process.
i Call staff regarding the status of your project only after the target date shown at the top of the page..
Although you should be contacted on or by the target date, please feel free to contact us if you haven •t heard Frohn us
by) -our target date: Staff may contact von before the target date if the initial review is, complete. By following this
procedure, you will save time and 'allow the reviewers to complete the work more ,exp' editiously. •
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as, counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting -additional information as a result oftheir technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once:it is started. When
this step is. complete, your application will be routed to the appropriate staff and remain -in their review queue until it
comes up for review. , -
3. Technical Compliance. Once an application is administratively complete, it is routed t� technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your:TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings-(if'required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE
REV 9/07
SPDC-% b' Y
4'5c22/. /gym/
CD
RECEIVED BY
CITY OF SPOKANE VALLEY
IJUL 16 2009
•F:u CENTE
7.07