Loading...
2009, 07-20 Permit App: 09002138 Pole BldgProject Number: 09002138 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/20/2009 Page 1 of 2 Project Information: Permit Use: 30 x 40 POLE BLDG Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 001436 Name: LEATHA LANE ADD Contact: SPOKANE STRUCTURES Address: 510 N MULLAN ST C - S - Z: SPOKANE, WA 99206 Phone: (509) 927-0655 Group Name: Project Name: District: Sout Parcel Number: 45221.1601 Block: SiteAddress: 304 S LEATHA LN Location:: CSV Zoning: UR -3.5 Urban Residential 3.5 Water District 010 VERA Area: 12,180 Sq Ft Width: 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Lot Owner: Name: MALM, WARREN & SUSAN Address: 304 S LEATHA LN SPOKANE VALLEY, WA 99216 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Information: Review Building Plan Review Released By: Originally Released: 7/20/2009 By: TMELBOU Landuse/Zoning/HE Conditions Permits: ReleasedB Y. ��� Originally Released: 7/17/2009 By: mbasinger Operator: JD Printed By: .1D Print Date: 7/20/2009 Project Number: 09002138 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/20/2009 Page 2 of 2 Building Permit Contractor: SPOKANE STRUCTURES INC Firm: SPOKANE STRUCTURES INC Address: 510 N MULLAN RD Phone: (509) 927-0655 SPOKANE, WA 99206 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB 1,200 $22,800.00 1,200 $22,800.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Notes: Totals: 1,200 $22,800.00 1,200 $22,800.00 Units Unit Desc I SELECT 1 SELECT 1 SELECT Fee Amount $363.25 $90.81 $4.50 Permit Total Fees: $458.56 This permit is granted based on the structure not being used for storage of on -street vehicles. Should the use of the structure be used for that purpose, the driveway will need to be paved and approved by the City of Spokane Valley. Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $458.56 $458.56 $90.81 $367.75 $458.56 $458.56 $90.81 $367.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 7/20/2009 Spokane conOValley. Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 wtivw. spokaneval lev.org PERMIT NUMBER: U PERMIT FEE: New Construction Accessory Bldg ❑ Addition/Remodel ❑ Deck n Other: SITE ADDRESS: 56 L/ E.' //LEgA-rea- /fin F J`/bt#-wev/ y �L — fi1�oZ/ , Y ASSESSORS PARCEL NO: S RA/, /(d LEGAL DESCRIPTION: Building Owner: Name: % 4 p gEg) /' l 4.141 Address: 3Di cS. En_ L4-ltlt Contractor: Name: CPOK?WE SnUCTURES, INC. Address: 510 N. MULLAN ROAD City: Spota4wt. that ie State:k,_ Zip 1 Phone, - 4; y Ssd7 Fax: Contact Person Name: Sere.. 0120/1924-- Phone: 'i2ooe&rPhone: SdoR- 44& - ogge Describe the scope of work in detail: City: SPOKANF VALLFV Phone: S09-977-0655 Contactor Lic No: CPOVI)DI1 2000 City Business Lc. No: State: Zip: WA Fax: 509-977-407 Exp Date: 1/1/03 9970, Cost of Project: $ eittO Igo SZ-' F s" IBvl Lt7irYG- Proposed Use: 3 4o P / rote_ **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: /y' DIMENSIONS:, ojef) o) /`F 4 # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: fu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE /01-00AREA: FINISHED BASEMENT SO. FTG: ARAE SQ. FTG; Ut DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: i # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional i formation may be required to be submitted, and subsequently approved before this application can b processed. SIGNATURE: O DATE: ½CF!VCfl BY :_CITY OF SPOKA Nc ' "r LEY JUL 1 "_ 2009 Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2/:5.07 ❑ Check ❑ Mastercard Expires: ❑ VISA VIN#: I-Cndiil L.c:a.._n BY: Spokane Valley° -J. :.'' `i 1 ` _,al..a.. For City Use Only PLUS Project Number CPT fC12.13 D Project Address • -2•(-)LI c Qa s la 11703 E Sprague Ave Suite 8-3 • Spokane Valley WA 99206 509.688.0036 4 Fax: 509.688.0037 4 permitcenter@spokanevalley:org As part of our on-going commitment to customer service during the, review, process of your project. application, we are providing you with a TARGET DATE for the initial technicahapplication review. If for any reason we cannot meet this date, we will contact you with a revised target date. . . ' . c—r • Your application review TARGET DATE is lilt I r - 1 The TARGET DATE is the 'date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issi arice. • Tips fora Smoother Project Application Review - i, Submit complete, accurate plans and documents.• Extra time nury be required jor. re -.submittals as project, application reviewers wok on multiple applications and it may be several days be%ore they can look at your new or revised information. - i Designate a specific contact person to communicate with the_City. ` While the person designated as the applicant's contact person with the Citv.can be changed, one individual with the expertise fondealing with reviewer comments would be the best choiceJbr the entire review process. i Call staff regarding the status of your project only after the target date shown at the top of the page.. Although you should be contacted on or by the target date, please feel free to contact us if you haven •t heard Frohn us by) -our target date: Staff may contact von before the target date if the initial review is, complete. By following this procedure, you will save time and 'allow the reviewers to complete the work more ,exp' editiously. • Steps in the Permit Process 1. Counter Complete. Your application has been accepted as, counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting -additional information as a result oftheir technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once:it is started. When this step is. complete, your application will be routed to the appropriate staff and remain -in their review queue until it comes up for review. , - 3. Technical Compliance. Once an application is administratively complete, it is routed t� technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your:TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings-(if'required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV 9/07 SPDC-% b' Y 4'5c22/. /gym/ CD RECEIVED BY CITY OF SPOKANE VALLEY IJUL 16 2009 •F:u CENTE 7.07