Loading...
2011, 07-28 Permit App: 11002278 ShopSpo1n� e ..s0Va11ey Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevalley.org (Staff UseOnly) 1 (X� PERMIT NUMBER: ,\ 9a rlV PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION 0 NEW CONSTRUCTION 0 DECK SITE ADDRESS: Q ADDITION/REMODEL 0 OTHER //S/1 E Les",rt., ACCESSORY BUILDING ASSESSORS PARCEL NO.: 9fl '/- 0727 BUILDING OWNER NAME: LEGAL DESCRIPTION: NAME: 306, -t- A//Xeu 5J4_ffec ADDRESS: 7/t/3 C tot CITY: PHONE: FAX: STATE: -74 CELL: ZIP: 953204 CONTACT NAME: r,� l„ PHONE: SSR - 3kz -/7r» CONTRACTOR NAME: j reser FAX: Sag -,isZ - /%S'f CELL: iJ4 --3Yz CGC MAILING ADDRESS: j'Q do .t /t//272_ CITY: STATE: ZIP: ??/./ PHONE: Coi- S.TZ' 17rr FAX: 709 -fn. -/757 CELL: .p'J<j - YyZ -/7rr CONTRACTOR LICENSE No.: S r' C/ /3/C4 EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: 7.C.4.1 SG.." 1.0 x25 ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: /0 Dimensions:No. Zo x 2..)—/ of Stories: Total Habitable Space: ,moo Main Floor SQ FT: S".70 Upper Floor SQ FT: N Unfinished Basement SQ FT: N.d Finished Basement SQ FT: -4/.4 Garage SQ FT: 5-00 Deck/Covered Patio SQ FT: Impervious Surface Area: 300/0 Slopes on Property: ,p No. of Bedrooms: 0 Construction Type: /././% Heat Source: ../ t7 Sewer or Septic: r✓/ TOTAL COST OF PROJECT: $ /0 it DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required [�n' ubsequently approved before this application can be processed. Signature Date: Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_ _Residential_11-11-11.doc 3 &,(s E ^q RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. eSITE PLAN el/property lines and dimensions 9/Direction arrow pointing North and orientation to streets Vroposed/existing buildings (footprint and dimensions) Utilities, septic tank/drain field locations and distances BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: P/( G,,,t ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation • Setbacks to property lines /Distance between buildings tr.-Right of way/easement location & sizes Driveway approach size and location o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations o Handrail / Guard height & spacing Spokane jValleya Target Date sheet For City Use Only l PLUS Project 1 1 - Project Address 114113 F . C.ENCY4t\ 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. (-I 1 Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Extra time may he required for re -submittals as project application rcvietvers work on multiple applications and tt may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the hest choice for the ensure review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should he contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or snail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 *o�anG e jValley° Residential Driveway PAVING WAIVER Community Development— Planning Division 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.720.5026 ♦ Fax: 509.688.0037 0 planning@sookanevallev.org Spokane Valley Municipal Code (SVMC) Section 19.40.020.8; "All residential driveway and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete, paver blocks or other equivalent hard surface material". A paving waiver can only be granted If the structure you are proposing is not going to require a driveway for daily use. PART I — OWNER INFORMATION OWNER NAME: —54,‘„ -t til/f PARCEL#: %S2fV. 0fl7 ADDRESS: l/ W 3 a//' /5tLf?( C. ,, r„` CITY: ��„6(<< STATE: 0144 ZIP: 79z21 dif PHONE: y roq RLz-zgst "� FAX: /i CELL: 41 EMAIL: y.A PART II —DETAILS OF. PAVING WAIVER 1. Do you have an existing garage for parking daily use vehicles? ® YES ❑ NO 2. Is the proposed detached structure used for storage only? © YES ❑ NO 3. Do you plan on using the detached structure to park vehicles? ❑ YES ® NO If yes, then what type of vehicles? 4. Do you plan to conduct a business from proposed detached structure? ❑ YES ® NO If so, what is the nature of your business? PART III —AUT RIZATION I,(PRINT NAME)C10,11/ N er, he eby confirm that the information provided on this form is true and correct. I acknowledge that any change in the foregoing conditions, could require the City to impose paving requirements. I further agree to report any change in these conditions to the Spokane Valley Community Development Department, Planning Division, within 30 days. ner SignSture Da e 7/ PART IV — DECISION STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT DIRECTOR AND FIND THE REQUEST IS GRANTED AT /12315 E. Lenora. SAID ADDRESS FOR PERMIT #: 1/00 Z27A Planninr,6ivision '_� Signature Date /r Created 6/27/11 Page 1 of 1 I\ /OG 0 l0 $Z 1 116 PLANNING DEPT. APPROVED BY.�� DATE: 6/0/ (e/acrvawk Lenard„ fix itaXess 14i3 (fe.,ore. !�,«rj 'fcftk'/, on7