2012, 08-15 Permit: SW-12001988 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001988
Permit Issued Date:
08/15/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name' SKYVIEW
Permit Type: SEWER
Primary Contact: A & D CONSTRUCTION & EXCAVATING
Applicant: A & D CONSTRUCTION & EXCAVATING
Address- 22513 DALKE AVE
OTIS ORCHARDS, WA 99027
Phone: (509)928-2621
Email:
SITE INFORMATION:
Site Address.
Parcel Number:
12209 E LENORA DR
45284 1223
Subdivision SKYVIEW ACRES
Assessor's Description. SKYVIEW AC L23 612
Inspection Area
Owner. SMITH, FRANCINE A
Address 12209 E LENORA DR
SPOKANE, WA 99206-5749
Phone:
Email:
Water District- Spokane Fire District: Spokane Valley Fire
County Water District #3
Zoning: Land Area: 16071 Square Feet
CONTRACTOR INFORMATION:
General Contractor
ADCON**0990J
A & D CONST. & EXCAVATION
22513 E DALKE RD
OTIS ORCHARDS, WA 99027
509-928-2621
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125 00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8.30-5'00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 08/15/2012 09 29 18
Printed by: 113 APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit lssued Date:
Application Number: SW -12001988 08/15/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/15/2012 09'29'18
Printed by: IIS APPPOOUASP NET v4 0