Loading...
2011, 06-29 Permit App: 11001930 Egress WindowsProject Number: 11001930 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/29/2011 Page 1 of 2 Project Information: Permit Use: 2 EGRESS WINDOWS Contact: GROW, DANIEL M & BEVERLY Address: 12408 E LENORA DR C - S - Z: SPOKANE, WA 99216 Setbacks: Front Left: Right: Rear: Phone: (509) 926-7589 Group Name: Site Information: Project Name: Plat Key: 001230 Name: HILLCREST ACRES 07TH ADD District: Sout Parcel Number: 45273.1102 Block: SiteAddress: 12408 E LENORA DR Location:: CSV Lot: Owner: Name: GROW, DANIEL M & BEVERLY Address: 12408 E LENORA DR SPOKANE VALLEY, WA 99216 Zoning: R-3 SF Res District Water District: Hold: ❑ Area: 13,354 Sq Ft Width: 155 Depth: 86 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Originally Released: 6/29/2011 By: tmelbourn Permits: Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 2 EGRESS 0 $2,200.00 0 $2,200.00 WINDOWS Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $2,200.00 0 $2,200.00 Units Unit Desc Fee Amount 1 SELECT $83.25 1 SELECT $4.50 I SELECT $33.30 Operator: JD Printed By: jmm Permit Total Fees: $121.05 Print Date: 6/29/2011 .Project Number: 11001930 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/29/2011 Page 2 of 2 Notes: Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $121.05 $121.05 $33.30 $87.75 $121.05 $121.05 $33.30 $87.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 6/29/2011 Spokane -- Valley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: //_/93 PERMIT FEE: New Construction Addition/Remodel Other: Accessory Bldg Deck SITE ADDRESS: I68 oro_. T)r,Jc SPazint 0c_11c1 , ic)1' 992j ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Buddtn" Owner.'.- :+:;,:...j,.' x ., - j; :..y:TM `'*`;:,'"cg,.�'r :Contractor r7. .1 j Name: Dat/1 t get) 6-r010 Name: Address:la�8' c 1--2vtor"- (��,JG Address: CitY:SQ0 Pane, ,kite,/ State: uh Zip: eiy..21 City: State: Zip: Phone: Fax: 5n4-9 —4, 7% Phone: Fax: DECK/COV. PATIO SQ. FTG: Contractor Lic No: Exp Date: :Contact Person'".. ,... ' CONSTRUCTION TYPE: City Business Lie. No: SEWER OR SEPTIC? Name: , j>ctiik & /E it/)/ Phone: `'f 75 - iri q �TLcc. Describe the scope of work in detail: Cost of Project: 00-10 -ggerig-tcr, Proposed Use: The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2"D FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2116/07 ❑ Check El Mastercard Expires: DATE: 67)-772.°1/ V VISA VIN#: Spokane Mtlley® . For City Use Only p PLUS Project Number 1 nu CPA' Project Address ' 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 • permitcenter@spokanevalley:org As 'part. of our on-going commitment' to customer service during'the 'review,process of your - project• application, we are providing you With,a TARGET' DATE for the initial,tccli•riical'applicationireview. If for• any reason, we cannot meet this date, we will contact you with a /-evisedtarget``date.-: ' ' ' " ''' Your application review TARGET DATE is Ct. I M 1 I The TARGET ,DATE is the date.we estimate 'your project applicatiori will have had' its initial tedinical, review. 1t is not the date for approvalor issuance. .. . Tips for a Snioother Project Application Review • • Submit complete..accurate plans and documents. Eche tune may he required fin• re -submittals' as project application reviewers on mar be several days•before-/hev can look ctt.vour not, or.revised information. ; • Designate a specific contact person to c jmmunicatetwithte•Cily.. =': While the person designatd as the applicant's, contact -person si'ith the Cih'can he changed one individual wit/l the expertise.for dealing 1i•ith reviewer,cotnment.r would be the best choice. for the entire review process.'• •: nuhiple applications and it Call staff regarding the status of your project only -after the target date shown at the top of the; page: Although you .should be contacted on or hv-the target elate, please jeekkee to contact usjtf :you haven •/,pease/ from ns by your /angel date. Staff may contact sou before the large/ date if the initial review,i.s; co/nplele.:Bi' jcillou-ing /Iris . procedure, you will save time and allow the reviewers to complete the work more'ecpeditiouslv,' Steps in the Permit Process • 1, Counter Complete. Your application has _been •as counter. complete. Tliis means, alt of the required documents,•as indicated on your Pre -Application Checklist have been submitted ;or. have ' been approved f'or deferred submittal. This does not prevent technical staff from requesting additional infbrmtition as a result of their technical reJiew, • • 2. Quality Check. The next step 'in the. process is a quality.check'to.make stire that the application,is reviewable and free • from substantive flaws that would prevent technical staff from completing the technical, review once itlis'started. 'When this step is complete, your application will be routed lo the appropriate staff and'rentain<'in their review cjueue until it comes up for review: - . 3. Technical Compliance. Once an application is administratively complete, it is routed to technical toff for compliance review. Depending on the' type' of project, technical sta1.1 niay 1nclude;midtiple'•reviewers,-Ycru'should , be con'tacted'by phone, fax, email, or mail by.yonr TARGET DATE once the initial tcchnical.contplidnee review is complete. , • 4. Permit Issuance. When the technical compliance, review of the application is completc,`•including any ,subsequcnt re submittals, each reviewer will approve their section of the application and route it -do the'Pe'rmit Center, When all sections of the application are received, a Permit Specialist will process the,application, and:contact the person specified on your application for permit pick-up. Intbrmation regayding fees and, pre -construction meetings (if required) will be provided by' the Permit Specialist at that time. • WHITE -APPLICANT PINK - BUILDING FILE • • REV 9/07