Loading...
2009, 04-28 Permit App: 09001008 AdditionProject Number: 09001008 Inv: I Application Date: 4/28/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information:....,. Permit Use: RESIDENTIAL ADDITON 12 X 24 Contact: DATE, GREGORY F & KRISTIN C Address: 1826 S LIMERICK DR C - S - Z: SPOKANE VALLEY WA 99037 - Setbacks: Front Left: Right: Rear: Phone: (509) 474-0006 Group Name: Project Name Site Information: x ..;: .. ,y..V W.. Plat Key: 005868 Name: RIDGEMONT EST NORTH 07TH ADD District: East Parcel Number: 45252.4601 Block: Lot: SiteAddress: 1826 S LIMERICK DR Owner: Name: DATE, GREGORY F & KRISTIN C Address: 1826 S LIMERICK DR Location:: CSV SPOKANE VALLEY WA 99037 - Zoning: R-2 SF Res Suburban District Water District: 010 VERA Hold: ❑ Area: 14,460 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information:., Review Building Plan Review Released By: j Originally Released: 4/28/2009 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 4/20/2009 By: mharnois Permits:,,�� Qm�..'�i's^`, ,..�a�: Operator: jmm Printed By: jmm Print Date: 4/28/2009 Project Number: 09001008 Inv: I Application Date: 4/28/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 Pavment Summary �, .....�u .. ...,,,. .....,. .. .., .. , F . _.. ......., Permit Type Fee Amount Invoice Amount This Application: Total Project: Description Grp Tyne Notes S(l Ft Valuation Sa Ft Valuation RES ADD R-3 VB ADDITION 298 $28,855.34 298 $28,855.34 Totals: 298 $28,855.34 298 $28,855.34 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $431.65 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RV W < 7999 SQ FT 1 SELECT $172.66 Permit Total Fees: $608.81 Notes _ ,... �. ._: . -M& OK TO ISSUE SEWER PERMITS FOR: BLOCK 1 - LOTS 1 THROUGH 8 BLOCK 2 - LOT 1 BLOCK 3 - LOT 1 PER GENE REPP 7/9/97 Pavment Summary �, .....�u .. ...,,,. .....,. .. .., .. , F . _.. ......., Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing, Building Permit $608.81 $608.81 $168.62 $440.19 $608.81 $608.81 $168.62 $440.19 Disclaimer. Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 4/28/2009 FPW f"` Permit Center f ' moF A�'a- 11703 E SpraDue Ave, Suite B-3 VALLEY PERMIT NiJMBE�' cSpokane Spokane Valley, WA e?96u rv�NE PERMIT FEE: Wky- (509)688-0036 FAX: (509)68,Q 7i O INS � www.Mok-anevalley.org �1� tK Community Development KMi j VtN i Residential Construction Const ction El Accessory Bldg Permit Application Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: ASSESSORS PARCEL NO: "�' ``- ` f LEGAL DESCRIPTION: Building Owner• Name: Address: , L„w e Ic1c Ci State: - Zip: 7 Phone:Fax: c'c t)its < Contact Person Name: ,, .1C!l r 1! 4 --*t Phone: - Contractor: DIMENSIONS: DIMENSIONS:.. Name: 1,J 10, TOTAL HABITABLE SPACE: Address: I�12 t i yc Z. 4 City: State: Zip: Phone: Fax: Contractor Lic No: Exp Date: City Business Lic. No: Describe the scope of work in detail: Cost of Protect: $50,`r s;. 7 t F; '. C •. h.. Proposed Use: **************The fallowing MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: DIMENSIONS:.. # OF STORIES: TOTAL HABITABLE SPACE: A 1Z c I�12 t i yc Z. 4 — MAIN FLOOR TO SQ. Yu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: rj;' PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can b processed. SIGNATURE:-- �,� DATE: Method of Payment: ❑ Cash Q Check ❑ Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 2115/07 Site Address: 1826 S LIMERICK DR Parcel Number. 45252.4601 Zoning: R-2 Fire District: FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite 133 Spokane Valley, WA 99206 Phone: 509.688.0036 Water District: VERA Applicant: DATE, GREGORY F & KRISTIN C 1826 S LIMERICK DR SPOKANE VALLEY WA 99037- (509) 474-0006 e-mail: Contact: DATE, GREGORY F & KRISTIN C 1826 S LIMERICK DR SPOKANE VALLEY WA 99037- (509) 474-0006 e-mail: Contractor. OWNER ( ) - 0 Project RESIDENTIAL ADDITON 12 X 24 Ancrrintinn New project El Previous pre -app meeting 11 Plan revisions E] Transmittal Date: Monday, Apol20, 2009 Project Number: 09001008 Owner. DATE. GREGORY F & KRISTIN C 1826 S LIMERICK DR SPOKANE VALLEY WA 99037- e -mail: Occupant: e-mail: Arch / Engineer. e-mail: Please send all plan review and project comments via e-mail to the highlighted individuals. Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIONa 1 CONSTRUCTION PLAN I TD ` I {1 Please send all plan review and project comments via e-mail to the highlighted individuals. For City Us 0}� ly , PLUS Project Number �-l� CITY OF Project Address S P oKane alleVy° 11703 E Sprague Ave Suite B-3 ♦Spokane Valley WA 99206 411 oo 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is g1,�L_f The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 I APPROVED BY 21lik q IR