2012, 08-13 Permit: SW-12001964 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001964
Permit Issued Date:
08/13/2012
Expiration Date: 08/14/2012
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
GREEN HAVEN
SEWER
Primary Contact: POUL CONSTRUCTION
Applicant: POUL CONSTRUCTION
18902 E 2ND AVE
SPOKANE VALLEY, WA 99027
Phone: 509-979-5872
Email:
Address:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
705 N LONG RD
55183.1003
CORBIN ADDITION
GREENHAVEN SUB L3 B1
Water District:
Consolidated Irrigation
District #19
Owner:
Address:
Phone:
Email:
FITZPATRICK, V L
705 N LONG RD
GREENACRES, WA 99016-9551
Fire District: Spokane Valley Fire
Land Area: 12474 Square Feet
CONTRACTOR INFORMATION:
General Contractor
POULCC*932BQ
POUL CONSTRUCTION
18902 E 2ND AVE
SPOKANE VALLEY, WA 99027
509-979-5872
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
INSTALLERCALL 1-800-424-5555 BEFORE YOU DIG --AT T 2
SWORKINGCODE
COMPLY WITH ALL REQUIREMENTS THE E WA STATE DEPT OF LABOR & INDUSTRIES,REQUIRES
INCLUDINGTHOSE THE
RELATED TO TRENCH SAFETY.
Date Printed: 08/13/2012 14:46:26
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001964 08/13/2012
Expiration Date: 08/14/2012
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/13/2012 14:46:26
Printed by: IIS APPPOOL\ASP.NET v4.0