Loading...
2012, 08-13 Permit: SW-12001964 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001964 Permit Issued Date: 08/13/2012 Expiration Date: 08/14/2012 Project Description: Project Name: Permit Type: SEWER CONNECTION GREEN HAVEN SEWER Primary Contact: POUL CONSTRUCTION Applicant: POUL CONSTRUCTION 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 Phone: 509-979-5872 Email: Address: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 705 N LONG RD 55183.1003 CORBIN ADDITION GREENHAVEN SUB L3 B1 Water District: Consolidated Irrigation District #19 Owner: Address: Phone: Email: FITZPATRICK, V L 705 N LONG RD GREENACRES, WA 99016-9551 Fire District: Spokane Valley Fire Land Area: 12474 Square Feet CONTRACTOR INFORMATION: General Contractor POULCC*932BQ POUL CONSTRUCTION 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 509-979-5872 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area INSTALLERCALL 1-800-424-5555 BEFORE YOU DIG --AT T 2 SWORKINGCODE COMPLY WITH ALL REQUIREMENTS THE E WA STATE DEPT OF LABOR & INDUSTRIES,REQUIRES INCLUDINGTHOSE THE RELATED TO TRENCH SAFETY. Date Printed: 08/13/2012 14:46:26 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001964 08/13/2012 Expiration Date: 08/14/2012 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 08/13/2012 14:46:26 Printed by: IIS APPPOOL\ASP.NET v4.0