2015, 02-24 Permit App: BLD-2015-0322 Pole BldgSpokane
�Valley�
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-2540
Fax: (509) 688-0037
perm itcenter@sooka neva I I ev. ortl
RESIDENTIAL CONSTRUCTION PERMI
PERMIT NUMBER:
PERMIT FEIgB 2 4 2015
CSV PERMIT CENTER
SUB -"r I REV. #L_
PLICAT-
ACCESSORY BUILDING
❑ NEW CONSTRUCTION
❑ DECK
SITE ADDRESS:
o ADDITION/REMODEL
❑ OTHER
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME: to a of
•3t4f ':e £
NAME: TOckei 4 1"+-ic
ADDRESS:
31 't iV. t-oC.1As+
CITY:SPOKANE VALLEY - STATE:WA
PHONE: (509) act( _ gel (7 FAX:
CONTACT NAME:LARRY ANDERSON / DAVE BEAUDOIN
zip: q 5 ao
CELL:
PH0NE:509-922-4384 FAx:509-924-4096
CELL:
CONTRACTOR NAME:BULLDOG CONTRACTORS, INC.
MAILING ADDRESS:16024 E. SPRAGUE AVE
CITY:SPOKANE VALLEY
PHONE:509-922-4384
CONTRACTOR LICENSE NO.:BULLDCI933M5
NO.:BULLDCI933M5
STATE:WA
FAX:509-924-4096
EXPIREs:7/25/2014
ZIP:99037
CELL:
CITY BUSINESS LICENSE
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
INSTALL NEW POLE BUILDING STORAGE BUILDING
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak: I i1 '
Dimensions: 30 xYD sq Li
No. of Stories:1
Total Habitable Space:0
Main Floor SQ FT:
Ito O
Upper Floor SQ FT:N/A
Unfinished Basement SQ
FT:N/A
Finished Basement SQ
FT:N/A
Garage SQ FT:N/A
1
Deck/Covered Patio SQ
FT:N/A
Impervious Surface
Area:N/A
30% Slopes on
Property:NONE
No. of Bedrooms:0
Construction Type:POLE
Heat Source:N/A
Sewer or Septic:
TOTAL COST OF PROJECT: $
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction or on a dwelling, the dwelling Is/will
be served bypotable water. 2)Ownershipof this Cityof Spokane Valle permit Inure to the roe owner. 3)The signatory Is the property
P Valleyproperty rtY 9 N P i Y
owner or has permission to represent the property owner In this transaction. 4) All construction is to be done In full compliance with the City of
Spokane Valley Develo.ment code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permi of a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be r-' -. t4 be submitted and subsequently approved before this application can be processed.
Signatureid
Date:f� /:13 / 1 y
•
Updated 1-11-
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/2743/Res_Permit.doc
Page 1 of 1
�Vaifl1eyW
§sideni-
R Rd WAVER
Community D velopment— I nni 2h01
5Divisio
11703 E Spragge Ave Suite 6-3 0 Spokane Valley WA 99206
0
509.720.5026Fax: 09.688.QQ}%1,0iaLrAirmtus 8r�!@nygy.org
-SU B#( f REV. #=
Spokane Valley Municipal Code (SVMC) Section 19.40.020.B; "All residential driveway a td offstreet arba hall be •a
asphalt, Portland cement, grasscrete paver blocks or other equivalent hard surface ma erial". A paving waiver can only be granted if
the structure you are proposing Is not going to require a driveway for daily use.
— OWNER INFORMATION
OWNER NAME: .Toctia Jr�a r`it' s
PARCEL#:
15 �.1.3 �� 1
ADDRESS:
3 1 y .
L'', -o c_ s-
)-ef .
CITY:
,4I +
C foil oi-_ vtJA\L'-y
n
STATE: �,/t-1.
Zip:
('� G r
.'.I /3OG
PHONE:
89 1 -S913 FAX:
CELL:
EMAIL:
PART II —DETAILS OF PAVING WAIVER
1. Do you have an existing garage for parking daily use vehicles? YES IRNO
2. Is the proposed detached structure used for storage only? YES ❑ NO
3. Do you plan on using the detached structure to park vehicles? ❑ YES NO If yes, then
what type of vehicles?
4. Do you plan to conduct a business from proposed detached structure? ❑ YES [t}'NO If so, what
is the nature of your business?
PART III —AUTHORIZATION
I,(PRINT NAME) -1.fc: —J e }nz owner, hereby confirm that the information provided on this
form is true and correct. I acknowledge that any change in the foregoing conditions, could require
the City to impose paving requirements. I further agree to report any change in these conditions to
the Spok ne Valley Co flmynity Development Department, Planning Division, within 30 days.
//. 4
OwrieyrSignature
a -Z 3 - / 5
Date
PART IV — DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT
3/ Ai l/ ,6>(,
DIRECTOR AND FIND THE REQUEST IS GRANTED AT
SAID ADDRESS FOR PERMIT #:
Planning Division Staff Signature Date
Created 6/27/11
Page 1 of 1