2009, 04-21 Permit App: 09000909 Rebuild Damage GarageProject Number: 09000909 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/21/2009 Page 1 of 2
Project Information:
Permit Use: REBUILD DAMAGE GARAGE
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 001764 Name: NORDHAGENS SUB
Contact: CAPSTONE CONSTRUCTION
Address: PO BOX 388
C - S - Z: NINE MILE FALLS, WA 99026
Phone: (509) 468-4981
Group Name:
Project Name:
District: East
Parcel Number: 55181.0304 Block:
SiteAddress: 1122 N LONG RD
Location:: CSV
Zoning: R-3 SF Res District
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: 10,200 Sq Ft Width: 85 Depth: 120 Right Of Way (ft): 50
Lot:
Owner: Name:
Address:
MOORE, PATRICK W
1122NLONGRD
SPOKANE VALLEY, WA 99016
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Permits:
Released By:
Originally Released: 4/14/2009 By: TMELBOU
•
Contractor: CAPSTONE CONSTRUCTION
Address: 2917 E FRANCIS
SPOKANE WA 99208
Description Grp Type
GARAGE U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Operator: jmm
Notes
REBUILT
GARAGE
Building Permit
Firm: CAPSTONE CONSTRUCTION
Phone: (509) 468-4981
This Application: Total Project:
Sp Ft Valuation Sp Ft Valuation
552 $10,488.00 552 $10,488.00
Totals: 552 $10,488.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Printed By: jmm
Permit Total Fees:
Print Date:
552 $10,488.00
Fee Amount
$195.25
$4.50
$78.10
$277.85
4/21/2009
•
Project Number: 09000909
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/21/2009 Page 2 of 2
Notes: :r7 `"7,,
Payment Summary mmosam.... : fl me . ,
Permit Type
Building Permit
Fee Amount
$277.85
$277.85
Invoice Amount
$277.85
$277.85
Amount Paid
$0.00
$0.00
Amount Owing
$277.85
$277.85
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 4/21/2009
Spokane
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206.,
(509)688-0036 FAX: (509)688`)-37
0000ANE VALLEY
www. spokanevallCe;Tdff
APR 1 2009
111
k'�HMlll,-
PERMIT NUMBER: J. {i
PERMIT FEE:
Construction
/Remodel
Other:
Accessory Bldg
Deck
SITE ADDRESS: I { 9:4 'v `^ c 3 O
ASSESSORS PARCEL NO: 5 5 1 3\• 030 y LEGAL DESCRIPTION:
Building Owner:
DIMENSIONS: a3 X aye
Name: cJJ-� t` , Z k (\lobe L
Name: Cpap Fj` 1 nuoE, Covos4cG.c oktO
Address: 11 a IA). L0 9, to
-"J
Address: P Jl k 33/
State: 6..)‘„,
City: G4-c,1r s.5
Zip:
Phone: Fax:
State: kj} i0.
Contact Person
Name: - Cikt►�k
Phone: ( joSl L{ ,'�5 -
Describe the scope of work in detail:
Contractor: `
DIMENSIONS: a3 X aye
# OF STORIES: '
Name: Cpap Fj` 1 nuoE, Covos4cG.c oktO
MAIN FLOOR TO SQ.
FTG: IN lf-
Address: P Jl k 33/
UNFIN BASEMENT SQ. FTG:
W lia,
IMPERVIOUS SURFACE
AREA: ✓U 4,
City: o U4)s i. tt. 124 45 g
State: kj} i0.
Zip: cici694,
Phone(c c�)4(0.3_ 67 (
Fax:
CONSTRUCTION TYPE:
1.3
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: 15'
DIMENSIONS: a3 X aye
# OF STORIES: '
TOTAL HABITABLE SPACE:
14 i
MAIN FLOOR TO SQ.
FTG: IN lf-
2Nu FLOOR SQ. FTG:
W 4
UNFIN BASEMENT SQ. FTG:
W lia,
IMPERVIOUS SURFACE
AREA: ✓U 4,
FINISHED BAS�ENT
SQ. FTG: BASK
"" °°��
GARAGE SQ. FTG:
555-'4 ° )4-
DECK/COV. PATIO SQ. FTG:
0 1'
30% SLOPES ON
PROPERTY: .4 itr
# OF BEDROOMS:
vi -
CONSTRUCTION TYPE:
1.3
HEAT SOURCE:
n Vl-
SEWER OR SEPTIC?
41/4 -
The permitee verifies, acknowledges and agrees by their signature that: 1) If thi —�� `' `� �` r ` dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane No 0
signatory is the property owner or has permission to represent the property owner"
in full compliance with the City of Spokane Valley Development Code. Reference °Q
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a pe_
local laws, codes or ordinances. 6) Plans or additional information may be requin P,{`r
this application can ' e , rocessed. n(1 ikeQuctot
f 1 DATE: „AZ ` '5 7?
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
❑ Mastercard
Expires:
owner. 3) The
tion is to be done
:he City of
federal, state or
ly approved before
Spok ri ~
Valley®
For City Use Only,
PLUS Project Number C> v''>
Project Address
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
0/A%/7(r)
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07