Loading...
2008, 11-19 Permit App: 08004487 GarageProject Number: 08004487 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 11/19/2008 Page 1 of 2 Project Information: Permit Use: NEW 30 X 48 POLE GARAGE Setbacks: Front Site Information: Contact: QUALITY STEEL BLDGS Address: 7810 N MARKET ST C - S - Z: SPOKANE, WA. 99217 Left: Right: Rear: Phone: (509) 468-1606 Group Name: Project Name: ,ANN,,.,,y max, ,,,,, , �� .�s�, _. � . ,,,w�.,.. �;,,,,,» . ���„ ,�., , ,. -,-G,,., ,,. Plat Key: 003673 Name: GREENACRES EST 1ST ADD District: East Parcel Number: 55181.3823 Block: SiteAddress: 1228 N LONG RD Location:: CSV Lot: Owner: Name: GROTH, CALVIN & PATTI Address: 1228 N LONG SPOKANE VALLEY, WA 99206 Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: 1.25 Acres Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: h ;. Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Septic Sys Review Originally Released: 11/12/2008 By: tmelbourn Released By: Originally Released: 11/13/2008 By: LHALSEY Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 11/19/2008 By: lbarlow Operator: jmm Printed By: JD Print Date: 11/19/2008 Project Number: 08004487 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 11/19/2008 Page 2 of 2 Building Permit Contractor: QUALITY STEEL BUILDINGS INC Firm: QUALITY STEEL BUILDINGS INC Address: 7810 N MARKET ST Phone: (509) 468-1606 SPOKANE, WA 99207 This Application: Total Project: Description Gin Type Notes Sq Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB 30X 48 1,440 $27,360.00 1,440 $27,360.00 POLE BLDG Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Notes: Permit Type Building Permit Totals: 1,440 $27,360.00 1,440 $27,360.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $421.55 $105.39 $4.50 $531.44 Fee Amount Invoice Amount Amount Paid Amount Owing $531.44 $531.44 $0.00 $531.44 $531.44 $531.44 $0.00 $531.44 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 11/19/2008 4 Sj6kne 4,00.0Valley CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevalley.orq PERMIT NUMBER: PERMIT FEE: (Staff Use Only)u� Nov 12 NIN RESIDENTIAL CONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION CQ DECK SITE ADDRESS: 1228 N. LONG RD ADDITION/REMODEL Fi OTHER ACCESSORY BUILDING ASSESSORS PARCEL NO.: 55181.3823 LEGAL DESCRIPTION: BUILDING OWNER NAME:CALAND PATTI GROTH (HUNDEBY, PATRICIA) NAME:CAL GROTH ADDRESS:SAME CITY:SPOKANE STATE:WA ZIP:99216 PHONE: 509-926-5309 FAX: CELL: CONTACT NAME:NATHAN PHONE:509-468-1606 Fax:509-468-3720 CELL: CONTRACTOR NAME:QUALITY STEEL BUILDINGS, INC. MAILING ADDRESS:7810 N. MARKET ST CITY:SPOKANE STATE:WA ZIp:99217 PHONE:509-468-1608 FAx:509-468-3720 CELL: CONTRACTOR LICENSE No.:QUALIB081C7 No.:60137059111 EXPIRES:2/09 CITY BUSINESS LICENSE DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: 30X 4814 PROPOSED USE: STORAGE Effective October 28, 2007 Page 1 of 2 C:\Documents and Settings\mbrown.QSBINC\My Documents\permits\Residential Construction Permit App.l.doc ****YOU MUST COMPLETE THE FOLLOWING**** Height to Peak:19 Dimensions:30X48X1`! No. of Stories:1 Total Habitable Space:0 Main Floor SQ FT:O _ Upper Floor SQ FT:O Unfinished Basement SQ FT:O Finished Basement SQ FT:O Garage SQ F7':1440 ,. d Deck/Covered Patio SQ FT:O Impervious Surface Area:O 30% Slopes on Property:0 No. of Bedrooms:0 Construction Type:ROLEVr3 Heat Source:0 Sewer or Septic:sEWER TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley ' = -lopment code. Referenced codes are available for review at the City of Spokane Valley Permit Center, 5) The City of Spokane Valle permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information m - • - su • itted and subsequently approved before this application can be processed. Signature Method of payment: El Cash Bankcard # Check ZED �iEDA Date: /l ® Visa ❑ Mastercard Authorized Signature: This document originally contained confidential crcdit card info, motion whh.h was redacted pursuant to RCW 19.255.010 and the original document destroyed pursuant to SOS DAN GS2014-030. Effective October 28, 2007 Page 2 of 2 C:\Documents and Settings\mbrown.QSBINC\My Documents\permits\Residential Construction Permit App.1.doc Sp�kan jValley® For City Use Only PLUS Project Number Project Address / 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Protect Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 w t— 0 2 R..±; c i ct Loon RA, <3 bt U? , .011 o( 6 —r e-Octe_ ©l(4L4 eclsew,eKl-S NO a C ceS 5 l 7 x3' 0w- or int CK % n elle i`t" ., aa.A R rsin ' +W e' + e4.,1 c-- reor 1 7 r yyo c1L5 ...ce S raCed � � �P pr., mD. D 00 0 1.3822\ 498 V: 0 \oc tc131 PLANNING DEPT. APPROVED BY: Li> (-3 DATE: NIA/ 1.3824 498