Loading...
2012, 09-10 Permit: SW-12002168 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002168 Permit Issued Date: 09/10/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: B & M LANDSCAPING & REMODELING Project Name: SOUTH GREENACRES PH iv Applicant: B & M LANDSCAPING & REMODELING Permit Type: SEWER Address: 18424 E. SINTO AVE. SPOKANE, VALLEY, WA 99016 Phone: 509-496-7366 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: 1308 N LONG RD 55181.3828 PLAT A GREENACRES IRR DIST PLAT A W175' OF W498' OF S1/2 OF N276.5' OF BLK 46 Water District: Consolidated Irrigation District #19 Zoning: Land Area: 24150 Square Feet Owner: Address: Phone: Email: MIRELEZ, ROMAN D III & KRISTAA 3227 W HEROY AVE SPOKANE, WA 99205 Fire District: Spokane Valley Fire CONTRACTOR INFORMATION: General Contractor BMLANML923M4 B & M LANDSCAPING & REMODELING 18424 E. SINTO AVE. SPOKANE, VALLEY, WA 99016 509-496-7366 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 09/10/2012 11:42:46 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002168 09/10/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09/10/2012 11:42:46 Printed by: IIS APPPOOL\ASP.NET v4.0