2012, 09-10 Permit: SW-12002168 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002168
Permit Issued Date:
09/10/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: B & M LANDSCAPING & REMODELING
Project Name: SOUTH GREENACRES PH iv Applicant: B & M LANDSCAPING & REMODELING
Permit Type: SEWER Address: 18424 E. SINTO AVE.
SPOKANE, VALLEY, WA 99016
Phone: 509-496-7366
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
1308 N LONG RD
55181.3828
PLAT A
GREENACRES IRR DIST PLAT A W175' OF W498'
OF S1/2 OF N276.5' OF BLK 46
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 24150 Square Feet
Owner:
Address:
Phone:
Email:
MIRELEZ, ROMAN D III & KRISTAA
3227 W HEROY AVE
SPOKANE, WA 99205
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION:
General Contractor
BMLANML923M4
B & M LANDSCAPING & REMODELING
18424 E. SINTO AVE.
SPOKANE, VALLEY, WA 99016
509-496-7366
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 09/10/2012 11:42:46
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002168 09/10/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 09/10/2012 11:42:46
Printed by: IIS APPPOOL\ASP.NET v4.0