HomeMy WebLinkAbout2008, 05-05 Permit App: 08001657 ShopProject Number: 08001657 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 5/5/2008 Page 1 of 2
Proiect Information:
Permit Use: NEW 24 X 40 SHOP
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 999999 Name: Range
Parcel Number: 55073.0924
Contact: WOODS, BRIAN L & SUSAN R
Address: 2009 N LONG RD
C - S - Z: SPOKANE VALLEY, WA 99016-9557
Phone: (509) 926-1834
Group Name:
Project Name:
District: East
SiteAddress: 2009 N LONG RD
Block:
Location:: CSV
Zoning: R-3 SF Res District
Lot:
Owner: Name: WOODS, BRIAN L & SUSAN R
Address: 2009 N LONG RD
SPOKANE VALLEY, WA 99016-955
Water District: 134 CONSOLIDATED ID #19 Hold:
Area: 48,800 Sq Ft Width: 200 Depth: 244 Right Of Way (ft): 60
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 5/5/2008 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 5/1/2008 By: mpalaniuk
Operator: jmm Printed By: jmm
Print Date: 5/5/2008
Project Number: 08001657 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 5/5/2008 Page 2 of 2
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
GARAGE U-1 VB 960 $18,240.00 960 $18,240.00
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBC SURCHARGE
Notes:
Totals: 960 $18,240.00 960 $18,240.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
$307.25
$76.81
$4.50
FLORA ESTATES -REFER TO ADE -19-06 FOR LOT WIDTH/FRONTAGE-MH
FLORA ESTATES -SEE FILE ADE -19-06 FOR LOT FRINTAGE/WIDTH-MH
Payment Summary:
Permit Type
Building Permit
$388.56
Fee Amount Invoice Amount Amount Paid Amount Owing
$388.56 $388.56
$0.00 $388.56
$388.56 $388.56 $0.00 $388.56
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 5/5/2008
Spokane
jValley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave?, Suila-
Spokane V,al1e; WA' 992064 ;\Li_E`(
(509)688-0036 FAX S8-0037
unvw.s kanevalley.ozg
PERMIT NUMBER: <-/C I (cam 7
PERMIT FEE:
4' rLJ.Diew Construction Accessory Bldg
n Addition/Remodel n Deck
Other:
SITE ADDRESS: q iJ• LO Ai 6,
2Q
ASSESSORS PARCEL NO: 5 5 '073 �- `/f
LEGAL DESCRIPTION:
Building Owner: _gi
f J
# OF STORIES:
1
Name: 1^3£':tAa.1 /Sd s
A. »D b s
2"" FLOOR SQ. FTG:
A(R
Address:
ao 0 9 Ai. Lew c.,
12 .
FINISHED BASEMENT
SQ. FTG:
City: S t��c v# cityState:
State:
Zip: 9 901
Phone:S-05- 9*l(a-_ /V3y
Fax:
HEAT SOURCE: dV&,l/-'/
1.44)61-472/n z/ D
Contact Person
Name: D/2.y/9,t/ er)DDDS
Phone: $U y- 9a 6 --/e3Y 4 tr. 5;04 - 92)- S.SoV
Contractor:
s LrL i ----
# OF STORIES:
1
Name: Name:
MAIN FLOOR/TO SQ.
FTG: //1
//
2"" FLOOR SQ. FTG:
A(R
Address:
IMPERVIOUS SURFACE
49
FINISHED BASEMENT
SQ. FTG:
City:
State:
Zip:
Phone:
Fax:
HEAT SOURCE: dV&,l/-'/
1.44)61-472/n z/ D
Contractor Lic No:
Exp Date:
City Business Lic. No:
Describe the scope of work in detail: _Cost of Project: $
,
ZK £7lc �,2/tM� C IST�tJG/�1�.✓ Cz-IC1Ci-7 d.,DA'T34✓, 0523 G 1b $TDA 5,1Ex7ric..
L�N//✓1b T Zoll L1WQ STD=d .. CA k.c,JG-PR' 7 /t✓SSE s,
Proposed Use: sToepe,c ,00il
ax),2.4eSlop
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
/6 6 "
DIMENSIONS: ,
21/ X yo
# OF STORIES:
1
TOTAL HABITABLE SPACE:
96o afle
MAIN FLOOR/TO SQ.
FTG: //1
//
2"" FLOOR SQ. FTG:
A(R
UNFIN BASEMENT SQ. FTG:
Ad//AREA:
IMPERVIOUS SURFACE
49
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FT;
A `
DECK/COV. P TIO SQ. FTG:
Al ifs
30% SLOPES ON _
PROPERTY: AOdde
# OF BEDROOMS:
AJc iJ 6:7-
CONSTRUCTION TYPE:
S�TIC K FEAM 6
HEAT SOURCE: dV&,l/-'/
1.44)61-472/n z/ D
SEWER O/R SEPTIC?
AlM0,1 L --
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans olj additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
D Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
0 Check
DATE: ,j1//vim
❑ Mastercard ❑ VISA
Expires: VIN#:
CITY
! 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206
ane poK♦ 509.688.0036 ♦ Fax: 509.688.0037 •
Valle
Y
Completed Building and Mechanical Application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature and date.
❑X Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans
with details, roof plan, framing plans and details.
❑X Show the height of any proposed buildings or accessory structures.
�X Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room
(including sq footage of house and garage on plans) show each level of existing
house and square footage of any additions.
❑X Egress windows: Provide at least one window or exterior door approved for
emergency escape or rescue from basement and in every room for sleeping.
❑X Floor framing details: Joist type, size, spacing and installation details.
Roof framing plan and details
❑X Furnace and hot water heater location
❑X All header locations: type, size and connections
Foundation plan
Insulation information
Decks and Stairway details
All braced wall panel types: show locations and details of installation, including
engineered design
Smoke detector locations
22" x 30" attic access location
18" x 24" crawl space access
One-hour separation detail: between house and garage
Spokane
Valley®
For City Use Only
PLUS Project Number
Project Address•
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
we)
Project
ne Transmittal
Valley
City of Spokane ValleyCommunity Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Site Address: 2009 N LONG RD
Parcel Number: 55073.0924
Zoning: R-3
Fire District: FD 01
New projec
Previous pre -app meeting
Plan revisions
Transmittal Date:
Thursday, May 01, 2008
0
Project Number: 08001657
Water District: CONSOLIDATED ID #19
Applicant: WOODS, BRIAN L & SUSAN R Owner: WOODS, BRIAN L & SUSAN R
2009 N LONG RD 2009 N LONG RD
SPOKANE VALLEY, WA 99016-955 SPOKANE VALLEY, WA 99016-955
(509) 926-1834
e-mail: e-mail:
Contact: WOODS, BRIAN L & SUSAN R Occupant:
2009 N LONG RD
e-mail:
SPOKANE VALLEY, WA 99016-955
(509) 926-1834
e-mail:
Contractor: OWNER
( ) - 0
Arch / Engineer:
e-mail:
Project NEW 24 X 40 SHOP
Description:
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
N
CONSTRUCTION PLAN
SITE PLA
N
TD
Please send all plan review and project comments via e-mail to the
highlighted individuals.
r--
- 1 .
k /
71(
1`
PLANNING DEPT. APPROVED
\ti
1‘9
ATE: s/r/zoo-y
A
<0.
ACCE--,S
Sc -y
p
•
a
L