Loading...
HomeMy WebLinkAbout2008, 05-05 Permit App: 08001657 ShopProject Number: 08001657 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/5/2008 Page 1 of 2 Proiect Information: Permit Use: NEW 24 X 40 SHOP Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 999999 Name: Range Parcel Number: 55073.0924 Contact: WOODS, BRIAN L & SUSAN R Address: 2009 N LONG RD C - S - Z: SPOKANE VALLEY, WA 99016-9557 Phone: (509) 926-1834 Group Name: Project Name: District: East SiteAddress: 2009 N LONG RD Block: Location:: CSV Zoning: R-3 SF Res District Lot: Owner: Name: WOODS, BRIAN L & SUSAN R Address: 2009 N LONG RD SPOKANE VALLEY, WA 99016-955 Water District: 134 CONSOLIDATED ID #19 Hold: Area: 48,800 Sq Ft Width: 200 Depth: 244 Right Of Way (ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 5/5/2008 By: tmelbourn Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 5/1/2008 By: mpalaniuk Operator: jmm Printed By: jmm Print Date: 5/5/2008 Project Number: 08001657 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/5/2008 Page 2 of 2 Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GARAGE U-1 VB 960 $18,240.00 960 $18,240.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Notes: Totals: 960 $18,240.00 960 $18,240.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $307.25 $76.81 $4.50 FLORA ESTATES -REFER TO ADE -19-06 FOR LOT WIDTH/FRONTAGE-MH FLORA ESTATES -SEE FILE ADE -19-06 FOR LOT FRINTAGE/WIDTH-MH Payment Summary: Permit Type Building Permit $388.56 Fee Amount Invoice Amount Amount Paid Amount Owing $388.56 $388.56 $0.00 $388.56 $388.56 $388.56 $0.00 $388.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 5/5/2008 Spokane jValley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave?, Suila- Spokane V,al1e; WA' 992064 ;\Li_E`( (509)688-0036 FAX S8-0037 unvw.s kanevalley.ozg PERMIT NUMBER: <-/C I (cam 7 PERMIT FEE: 4' rLJ.Diew Construction Accessory Bldg n Addition/Remodel n Deck Other: SITE ADDRESS: q iJ• LO Ai 6, 2Q ASSESSORS PARCEL NO: 5 5 '073 �- `/f LEGAL DESCRIPTION: Building Owner: _gi f J # OF STORIES: 1 Name: 1^3£':tAa.1 /Sd s A. »D b s 2"" FLOOR SQ. FTG: A(R Address: ao 0 9 Ai. Lew c., 12 . FINISHED BASEMENT SQ. FTG: City: S t��c v# cityState: State: Zip: 9 901 Phone:S-05- 9*l(a-_ /V3y Fax: HEAT SOURCE: dV&,l/-'/ 1.44)61-472/n z/ D Contact Person Name: D/2.y/9,t/ er)DDDS Phone: $U y- 9a 6 --/e3Y 4 tr. 5;04 - 92)- S.SoV Contractor: s LrL i ---- # OF STORIES: 1 Name: Name: MAIN FLOOR/TO SQ. FTG: //1 // 2"" FLOOR SQ. FTG: A(R Address: IMPERVIOUS SURFACE 49 FINISHED BASEMENT SQ. FTG: City: State: Zip: Phone: Fax: HEAT SOURCE: dV&,l/-'/ 1.44)61-472/n z/ D Contractor Lic No: Exp Date: City Business Lic. No: Describe the scope of work in detail: _Cost of Project: $ , ZK £7lc �,2/tM� C IST�tJG/�1�.✓ Cz-IC1Ci-7 d.,DA'T34✓, 0523 G 1b $TDA 5,1Ex7ric.. L�N//✓1b T Zoll L1WQ STD=d .. CA k.c,JG-PR' 7 /t✓SSE s, Proposed Use: sToepe,c ,00il ax),2.4eSlop **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: /6 6 " DIMENSIONS: , 21/ X yo # OF STORIES: 1 TOTAL HABITABLE SPACE: 96o afle MAIN FLOOR/TO SQ. FTG: //1 // 2"" FLOOR SQ. FTG: A(R UNFIN BASEMENT SQ. FTG: Ad//AREA: IMPERVIOUS SURFACE 49 FINISHED BASEMENT SQ. FTG: GARAGE SQ. FT; A ` DECK/COV. P TIO SQ. FTG: Al ifs 30% SLOPES ON _ PROPERTY: AOdde # OF BEDROOMS: AJc iJ 6:7- CONSTRUCTION TYPE: S�TIC K FEAM 6 HEAT SOURCE: dV&,l/-'/ 1.44)61-472/n z/ D SEWER O/R SEPTIC? AlM0,1 L -- The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans olj additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: D Cash Bankcard #: Authorized Signature: REVISED 2/15/07 0 Check DATE: ,j1//vim ❑ Mastercard ❑ VISA Expires: VIN#: CITY ! 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 ane poK♦ 509.688.0036 ♦ Fax: 509.688.0037 • Valle Y Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. ❑X Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. ❑X Show the height of any proposed buildings or accessory structures. �X Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. ❑X Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. ❑X Floor framing details: Joist type, size, spacing and installation details. Roof framing plan and details ❑X Furnace and hot water heater location ❑X All header locations: type, size and connections Foundation plan Insulation information Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage Spokane Valley® For City Use Only PLUS Project Number Project Address• 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 we) Project ne Transmittal Valley City of Spokane ValleyCommunity Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Site Address: 2009 N LONG RD Parcel Number: 55073.0924 Zoning: R-3 Fire District: FD 01 New projec Previous pre -app meeting Plan revisions Transmittal Date: Thursday, May 01, 2008 0 Project Number: 08001657 Water District: CONSOLIDATED ID #19 Applicant: WOODS, BRIAN L & SUSAN R Owner: WOODS, BRIAN L & SUSAN R 2009 N LONG RD 2009 N LONG RD SPOKANE VALLEY, WA 99016-955 SPOKANE VALLEY, WA 99016-955 (509) 926-1834 e-mail: e-mail: Contact: WOODS, BRIAN L & SUSAN R Occupant: 2009 N LONG RD e-mail: SPOKANE VALLEY, WA 99016-955 (509) 926-1834 e-mail: Contractor: OWNER ( ) - 0 Arch / Engineer: e-mail: Project NEW 24 X 40 SHOP Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO N CONSTRUCTION PLAN SITE PLA N TD Please send all plan review and project comments via e-mail to the highlighted individuals. r-- - 1 . k / 71( 1` PLANNING DEPT. APPROVED \ti 1‘9 ATE: s/r/zoo-y A <0. ACCE--,S Sc -y p • a L