2013, 10-22 Permit: SW-13001872 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001872
Permit Issued Date: 10/22/2013
Expiration Date: 10/22/2014
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
S GREENACRES
DAVE'S BOBCAT SERVICE
509-999-5722
Applicant: DAVE'S BOBCAT SERVICE
Address:
Phone:
Email:
10406 E 6TH AVE
SPOKANE, WA 99206
509-999-5722
SITE INFORMATION:
Site Address:
Parcel Number:
Assessor's Description:
Inspection Area:
Zoning:
2201 N LONG RD
55073.0109
GREENACRES IRR DIST A TR A OF SP98-1177
AUDITOS#4272184 BK 15 PGS 74 & 75 BEING A
PTN OF S1/2 BLK 8
:(509)-477-3675
Owner:
Address:
Phone:
Email:
Water District: Consolidated Irrigation
District #19
REDMOND, PATTY
2201 N LONG RD
GREENACRES, WA 99016-8507
Fire District: Spokane Valley Fire
Land Area: 49658 Square Feet
CONTRACTOR INFORMATION:
DAVESBS932KS, Exp. 06/29/2015
DAVE'S BOBCAT SERVICE
10406 E 6TH AVE SPOKANE, WA 99206
509-999-5722
DETAILS:
Class Type
SEWER SEWER CONNECTION
SEWER WEEKEND/HOLIDAY INSPECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
Quantity Unit Charge Value
$26.32
$225.00
$251.32
1 $125.00 $125.00
1 $100.00 $100.00
$225.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 10/22/2013 14:31:50 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001872 Permit Issued Date: 10/22/2013
Expiration Date: 10/22/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/22/2013 14:31:50 Project Coordinator: Dawn Dompier