Loading...
2014, 04-24 Permit: SW-14000501 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000501 Permit Issued Date: 04/24/2014 Expiration Date: 04/24/2015 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION SO GREENACRES GREER, MARILYN A Applicant: GREER, MARILYN A Address: 2509 N LONG RD GREENACRES, WA 99016-9584 Phone: Email: BITE INFORMATION: Site Address: Parcel Number: 2509 N LONG RD 55071.0140 Assessor's Description: GREENACRES IRR DIST A SELY 250FT EXC NELY 145FT BLK S Inspection Area: : (509)-477-3675 Owner: GREER, MARILYN A Address: 2509 N LONG RD GREENACRES, WA 99016-9584 Phone: Email: Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District #19 Zoning: Land Area: 36250 Square Feet CONTRACTOR INFORMATION: OWNER, Exp. 12/31/2015 OWNER PERFORMING THE WORK SAME AS SITE ADDRESS SAME, WA 00000 509-218-7562 DETAILS: Class SEWER Type Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.64 $125.00 $151.64 1 $125.00 $125.00 $125.00 CONDITIONS: Possible Shoreline On Site Possible Floodplain Possible FEMA Flood Zone Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 04/24/2014 13:14:39 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000501 Permit Issued Date: 04/24/2014 Expiration Date: 04/24/2015 SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/24/2014 13:14:39 Project Coordinator: Dawn Dompier