2008, 04-08 Permit App: 08001197 Pole BldgProject Number: 08001197 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/8/2008 Page 1 of 2
Project Information:
Permit Use: 24 X 48 POLE BLDG Contact: TOWN & COUNTRY
Address: 5918 E TRENT AVE
C - S - Z: SPOKANE, WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509) 535-9016
Group Name:
Site Information: Project Name:
Plat Key: 002816 Name: WALNUT ADD
District: Nort
Parcel Number: 45172.1005
SiteAddress: 1103 N LOCUST RD
Location:: CSV
Zoning: UR -3.5
Water District.
Area: 25,370 Sq Ft
Block: Lot:
Urban Residential 3.5
Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Owner: Name: GRANDYS, MICHAEL J/NELSON,
Address: 1103 N LOCUST RD
SPOKANE, WA 99206-4078
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
4/3/2008 By: tmelbourn
Released By:.
Originally Released: 4/8/2008 By: tschmidt
Permits.
Operator: JD Printed By: jmm
Print Date: 4/8/2008
Project Number: 08001197 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/8/2008
Contractor: TOWN & COUNTRY BUILDERS
Address: 5918 E TRENT AVE
SPOKANE, WA 99212
Description Grp Type Notes
POLE BDLG U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBC SURCHARGE
Building Permit
Page 2 of 2
Firm: TOWN & COUNTRY BUILDERS I
Phone: (509) 535-9016
This Application: Total Project:
Sq Ft Valuation Sq Ft Valuation
1,152 $21,888.00 1,152 $21,888.00
Totals: 1,152
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
$21,888.00 1,152 $21,888.00
Fee Amount
$349.25
$87.31
$4.50
Permit Total Fees:
$441.06
Notes:
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $441.06 $441.06 $0.00 $441.06
$441.06 $441.06
$0.00 $441.06
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 4/8/2008
Sp®man �
"Valley.
Community Development
Residential Construction
Permit Application
Permit Center
11707 E Sprague Ave, Suite 106
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
ww w.sDokanavallev.orE
PERMIT NUMBER t ton
PERMITTEE:
New Construction
❑ Addition/Remodel
❑ Other:
?I -Accessory Bldg
❑ Deck
Slit ADDRESS:
IID) N1 Locus+ —90444 VA/4-Y / cefol 9924
ASSESSORS PARCEL NO:Ai DrI7� . (00S LEGAL DESCRIPTION:
Building Owner:
DIMENSIONS: /I
-)y•-XYB'xt21-b.feur-
# OF STORIES:
. LL ..
Contractor:
Name. M aael ("eresicky S
2"u FLOOR SQ. FTG:
-._.:__/V//%.•.:. .:''
UNFIN BASEMENT SQ. FTG:
--
Name: -MUM/ It (ouu r&y &m. tf is lie.
Address:3 n1• I..8Lust
GARAGE SQ: FTG:
f (Sa O /�
DECK/GOV. P TIO SQ. FTG:
N��- '
• Address: $9/e ERs-:TRF4✓T4i/ENGE
City:S(la�Lt rte 410.1 telt
tats
Sas: ,
Zip
City.: _stoma v,HeEi state:h4r,. Zip: 772/2
Phon�SO4i 3%U-1444
Fax:,
:Phone: :53c.y; :. Fax:Se9 939 293a
Contact Person
Name: Ggt£ Bub, )E•Tr
Phone: 509 53S 9016 Err 24
Describethe scope of work in.detaii:...-
• Contractor Lic No:TWUt1�i3C6 Exp Date: 0413908
City Business Lic. No: 60/ 05'7 495-;
-a:
Cost of Project:_.$ l9,.Sao
�y'x go'x I2.r•4' 614-06CI
Proposed Use:
**************The following MUST be complete: (write N/A:if•not aDn&able)**********************
HEIGHT TO PEAK
t-7'
DIMENSIONS: /I
-)y•-XYB'xt21-b.feur-
# OF STORIES:
. LL ..
TOTAL HABITABLE SPACE:
N -
MAIN FLOOR TO SQ.
FTG: N A- --
2"u FLOOR SQ. FTG:
-._.:__/V//%.•.:. .:''
UNFIN BASEMENT SQ. FTG:
--
IMPERVIOUS SURFACE
AREA:
FINISHED B SEMS T
SQ. FTG: N�f�'
GARAGE SQ: FTG:
f (Sa O /�
DECK/GOV. P TIO SQ. FTG:
N��- '
30% SLOPES ON
P nPF 7y; NO
# OF BED OMS:
/V -
CONSTRUCTION TYPE:
Po sr FR4144
HEAT SOURCE:
A/I4,--
SEWER R SEPTIC?
The permifee verifies, a nowledges and agrees by their signature that: 1) If this pens t is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Perrnit inure to the property owner. 3) The
sig natory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances 6) Plans or additional information may be required to be submitted, and subsequently approved before
this.application can be • •cessed. y•
SIGNATURE:
Method of Pay
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/D7
0. Check
❑ Mastercard
Expires:
DATE:
"Pit 3 20oNg
❑ VISA
VIN#:
Spokane
Valley o
For City Use Only
R
PLUS Project Number �t 4 ! \G%
Project Address
i)OE- X) LQccdhr-
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revi ed target date.
I I
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had' its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
i Submit complete, accurate plans and documents.
Evtra time may be required for re -submittals as project application reviewers work 00 multiple applications and it
nrar be several Jars before they can look at your new or revised information.
i Designate a specific contact person to communicate with the City.
IVhile the person designated as the applicant's contact person with the Citv can he changed, one individual with the
expertise farr dealing with reviewer continents would be the best choice for the entire review process.
Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date. please feel five to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By .following this
procedure, you will save time and allow the reviewers to complete the work more expeditiouslv.
Steps in the Permit Process
I. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete. your application will be routed to the appropriate staff and remain in their review queue until it
comes tip for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff niay include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time. .
WHITE -APPLICANT PINK- BUILDING FILE REV 9/07
rcr1nit 6R-IM'I r 1.5
/1o3 ni I-00 (6—
401440J& Ater, wa
u5/?z,/Oo•c
PLANNING DEPT.
BY.�
DATE: `1/4/de
e�.64n ase
Locks+
o v er) Len {b�cr I n,,,•
WAMBEKE ENGINEERING 2913 East 61st Court
Daniel Wambeke, P. E. Spokane, WA 99223
Telephone: 509-443-6186 • Fax: 509-448-6582 • dwambeke @msn.com
STRUCTURAL DESIGN DRAWINGS
FOR
24' X 48' X 12'6" POST FRAME BUILDING
FOR
MICHAEL GRANDY'S
SPOKANE VALLEY, WASHINGTON
JOB NO. SP 8744
PREPARED FOR
TOWN & COUNTRY BUILDERS, INC.
SPOKANE, WASHINGTON
April 3, 2008
EXPIRES f i • 2-41',4
Designer o! Small Structures, Post Frame Buildings, Foundations,
Light Gauge Steel Framing and Grain Storage Systems
.b Zee
Wind Load
Live Load
Desi • n Criteria
Dead Load
Bay Spacing
PLF
3o Psf
5- PsF
iZ Fr
Vzo
P 87y
"cijeL 6 4 J ?s
sfo ,,1E Uht-Ler, 14/4
ZY' x `ex /2'
qua
0X4
70744, is -
EXPIRES (L
7
Grkad c
re -S---' Pori L P l2 : 60 ,cT
�11
a
Da
4
a p
Scc
1
g _a_1ou,
11
FnoTI1\1 C 17FTA7/
FOSTI FGOT / NG
r2.E
L04,4 y /oA/
SCNEOuL E
Foor,A)6
512-E
( V qb
GX .!-
lo# x j1 -(o"x 3'
ip lc 5.86G
64
r.- B" . , l-9' x 31-6"
AIL OrliEKS
44.6
1164 Y /1-61 x 3.-6"
EXPIRES IL- u1 t&-cl
SP87Yq
CoRn EES
U
RI FTVR_
JO 11,41 41A-Lts
S u PfeuT Btacit
10 1a /* r r.s
Gran
5-_Adn/AiLs
12 /64) AfitiLS
S -u PPo-T L oc% s
I z 1 dd Nuts
6i P -T5
git NittLs
dorrom Ci/oRb Tt65
a x, OF --t Z SFr t)
msr 1444)6egs ~,
7?45s 0o7 -7o' C OIL'S 5P'40416-
TN TE.)2,1oR.
2-2x6 Fidgal 84641.
CAirC `7 If1A-4LS
To RA-FrE125
vR-
6)12 -Ts
'1 /id Ah s
a� u p2,4S W ail
q 41461.: Tb PvwEt'Jlatieks
PctP—LiAJ
-ropUtEA)
EXPIRES
.24`c4
Sp 87ff
" STEEL Boos ZX_ fu24•t/S 2y•'e.c
Jrµ lnArifER s ovik4fPFED
&YPI(4L? fl�., �X.._DiVeta Tp coos
0-vERLAerED 41:r k,L L
'�
\ •".I\
a
tx_DealiL BorroM Cjtox~,os
E Sapp ,o S' /1r e itItE g.
CSR SteTi of TRt(
z x8 Aoy&L rq Caroms
2)t. h ow8 i-rbp a l p'•b
2xia 00414 Top cHocDS
2 x6. wud&N�
'.
Til
zx(v EtocK/4/C- 2y" LoA16- 2x ►Z BCL # MS
3/y" rTai. Foe's .HOZ .
lirnioc F.Ks ¥ Au- Boers A-4. A /11,0 Iwo of z"
p! c49
?gem Eoce
of thel To Nat- ePAo‘r
if /a hers frfa k 04411h OF 3"
x : VrPosr Mai GENS Ahsocr ib eang **tr.
HIM/kit f1*kCTio9 DF SUSS
wAti
sesm
D ciip
q •S • R .S.h icS[rf
3 ICI 403
,Sli s ks cht lb P401,0
Sti.8 FASO Codr/VEcriV4l 77 PvlL r. /
Wsr0140 Roof Ova PA 6.1
- 44/413
81r-4414
£tra.+ij°&'��:
gq F reric
i4Q4& ( t yfcrii4) TQ E"4 RAF,r rZ-
Ovceti6
1 EXPIRES(S 2-?` I
SPB7yy
14
Watip
3 /0 4Q1/$ 5U8F4S4if To P4 'M/
✓ l 4'
5
`7
\1;17 N4 ij
POP 4) To
XPIRES IG`
4
69F o V E I imd 6 FkA'nI41 6' . 0 crifa.,
11
.+98'yY
EXPIRES /L -v 1
•
FAD 1ffr s (-o'
4A
1- 2x io Lc -L Z
Kise
1,110
x'10
— cr'oios0 Y8; i.
U
3f 874N
U2jpan
_ 1/3 Span
114 ,spy
Purling t=1...4t
Zy " oc run of rafter
.
N•`—Top Chord to Bottom Chord
'—Top Chord to Post
"—Support Block to Post
—Shear Block to Poet
Rat Runs @
Girts 2X6 OF -02
a
24" oc
2X10 PT IlaIlk2Assl
birdwa,lK
RitIGE
Ili
•
Bolts if/ %p mats l 4
1
Bolts u/ trails IG
2 :8730:1
ts w/(� naps Ibd
L ts w/ (o nails !bd
(111 Eo r'E40
Live Load
Dead Load
Othr Load
30 psf
psf
0 psf
Total Load 3S psf
PLF 410
Truss Width 2 �T
Z
Roofing. & Siding
29 Guage Steel
PaF1416
OAK 304 Ftcr f '/6nosB
DOUBLE TRUSS
Top Chord ZX►o kr-112-
Bot
r{1t
Bot Chord 20o OF.L'EL
Webbing 24prL*z
Bolts 3/4 1+
4114,00
2-2X6 Blockin
6X 6 PT 1211.+1 _1±14___
.6 retension
•
2Xj GiriiB
TYPICAL CROSS SgCTION
" Concrete Sia
7
u
i kinn-, O AIMf'l
0
n
n
1
PROVIDE DIAGRAMS AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES, BEAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
INSPECTIONS
CITY COPY
THIS BUILDING SUBJECT
TO FIELD INSPECTION.CORIECTIONS
sky
R SPOKANED AOR CODD•� O DIVISION E
—rte O�