03-065.00 Spokane County South Greenacres Sewer ProjectMemorandum of Understanding Between the City of Spokane Valley and Spokane County Regarding Pavement Replacement Cost Sharing in the South Green Acres Sewer Project WHEREAS the City of Spokane Valley (the CITY) has incorporated and is planning to enter into an interlocal agreement with Spokane County (the COUNTY) to facilitate the continued design and construction of the COUNTY's Sewer Program within the CITY's corporate limits. WHEREAS the CITY desires that the roads impacted by the construction of sewers in the South Green Acre Sewer Project be newly paved, or widened, for an improved roadway surface. WHEREAS the CITY also desires that pavement replacement work be extended in some areas beyond the limits of sewer construction. WHEREAS the cost of such additional width, and additional length of road reconstruction is not funded by the COUNTY's Sewer Program, and said cost will need to be paid by the CITY. THEREFORE, the CITY and the COUNTY do hereby agree as follows: 1. The percentages shown below shall provide the basis for cost sharing on the crushed surfacing and pavement bid items included in the South Green Acres Sewer Project, based upon the road reconstruction limits reflected in the table attached hereto as Exhibit A. COUNTY SHARE CITY SHARE Crushed Surfacing 94.2% 5.8% Asphalt Concrete Paving 66.8% 33.2% 2. The CITY's cost and the COUNTY's cost shall be calculated using the contract prices for the South Green Acres Sewer Project. The amount of the CITY's total share based upon preliminary estimates is $15,366.63 as indicated on Exhibit A. The CITY and the COUNTY recognize that this estimate is for planning purposes, and that the actual amount will be based upon final quantities. 3. In the event that the CITY decides to make additions to the scope of the work indicated on Exhibit A, a corresponding adjustment shall be made to the CITY's share of the cost based upon the resulting increase in pay quantities and the associated contract bid prices. 4. During the construction of the South Green Acres Sewer Project, the COUNTY will provide monthly invoices to the CITY for the CITY'S share of the completed roadway e'1) -CPQ replacement. Upon receipt of the invoices, the CITY shall provide payment to the COUNTY within 30 calendar days. SPOKANE COUNTY: County Utilities Director CITY OF SPOKANE VALLEY: By: 0'', � ztQ— - Dave Mercier, City Manager Date: II Lu Date: xe/s/'-/�� South Green Acres Sewer Project Project #103A Paveback Analysis Bid Prices: 2" ACP = $4.50 Rock/cy= $24.50 Road Name: Location: Mission Avenue Flora Road to East End of Project Road Length 1611 ft Existing Pavement Width 22 ft Proposed Pavement Width 24 ft Additional Pavement Required 358 sy Road Length x (Prop_ Pavement Width - Exist. Pavement Width)/9 Additional Rock Required 60 cy (Road Length x (Prop. Pavement Width - Exist. Pavement Width) x 0.5')127 Cost for Additional Pavement $1,611.00 Additional Pavement Required x 2" ACP Bid Price Cost for Additional Rock $1,461.83 Additional Rock Required x Rock/cy Bid Price Total Additional Cost $3,072.83 Road Name: Location: Mission Avenue Flora Road to West End of Project Road Length: 770 ft Existing Pavement Width 0 ft \ Existing Gravel Road Width 22 ft Proposed Pavement Width 24 ft Additional Pavement Required 2053 sy Road Length x (Prop. Pavement Width - Exist_ Pavement Width)/9 Additional Rock Required 29 cy (Road Length x (Prop. Pavement Width - Exist. Gravel Road Width) x 0.5')/27 Cost for Additional Pavement $9,240.00 Additional Pavement Required x 2" ACP Bid Price Cost for Additional Rock $698.70 Additional Rock Required x Rock/cy Bid Price Total Additional Cost $9,938.70 �-► Subtotal Paveback Costs $13,011.54 Tax @ 8.1% $1,053.93 r Contingency @ 10% $1,301.15 Total Paveback Costs $15,366.63