2012, 11-27 Permit: SW-12002573 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002573
Permit Issued Date:
11/27/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: CLEMENT/ALT SHP-30-06
Permit Type: SEWER
Primary Contact: R & C TREE SERVICE
Applicant: R & C TREE SERVICE
Address: PO BOX 3457
POST FALLS, ID 83854
Phone: 509-994-2311
Email:
SITE INFORMATION:
Site Address: 15 S LONG RD
Parcel Number: 55191.2104
Subdivision: CORBIN ADDITION
Assessor's Description: (CITY OF SPOKANE VALLEY) SHP 30-06 LT 2
AUDITORS #5582121 BK 23 PGS 59 & 60
Inspection Area:
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 8400 Square Feet
Owner:
Address:
Phone:
Email:
ROBERGE, JOHN P & SHERI L
18919 E 11TH AVE
GREENACRES, WA 99016
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION:
General Contractor
RCTRESI042K2
R & C TREE SERVICE
PO BOX 3457
POST FALLS, ID 83854
509-994-2311
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 11/27/2012 12:03:11
Printed by: IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002573 11/27/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 11/27/2012 12:03:11 Printed by: IIS APPPOOL\SmartGovProdApp