Loading...
2009, 07-23 Permit App: 09002219 Garage Project Number: 09002219 Inv: 1 Application Date: 7/23/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW 18 X 22 GARAGE Contact: TUFF SHED Address: 6206 E TRENT#2A C-S-Z: SPOKANE VALLEY,WA 99212 Setbacks:Front Left: Right: Rear: Phone: (509)535-8833 Group Name: Site Information: Project Name: Plat Key: 001218 Name: HILL VIEW EST District: Sout Parcel Number: 45273.1401 Block: 12 Lot: 1 SiteAddress: 12708 E LENORA DR Owner:Name: BRIGHT,JOHNNIE Address: 12708 E LENORA DR Location::CSV SPOKANE VALLEY WA 99216-017 Zoning: R-2 SF Res Suburban District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: 1,070.00 Acres Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: ..� n .... a • A Review Building Plan Review Released By: Originally Released: 7/23/2009 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 7/22/2009 By: mbasinger Permits: w m wF.. ..a <<.,dam „r .:AW",W• Operator: jmm Printed By: JD Print Date: 7/23/2009 Project Number: 09002219 Inv: 1 Application Date: 7/23/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: TUFF SHED INC Firm: TUFF SHED INC Address: 17500 W VALLEY HWY STE 100 Phone: (509)535-8833 TUKWILA,WA 98188 This Application: Total Project: Description Grp Type Notes Su Ft Valuation Sq Ft Valuation GARAGE U-1 VB GARAGE 396 $7,524.00 396 $7,524.00 Totals: 396 $7,524.00 396 $7,524.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $153.25 ACCESSORY PLANS REVIEW 1 SELECT $38.31 WSBCC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $196.06 Notes: _ - 3 W , • n MWSAMMEMif NAMEMPRVABOGRa%. This permit is granted based on the structure not being used for storage of on-street vehicles. Should the use of the structure be used for that purpose,the driveway will need to be paved and approved by the City of Spokane Valley. Payment Summary: f40e. t :_- #a- _> • awrAwr Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $196.06 $196.06 $38.31 $157.75 $196.06 $196.06 $38.31 $157.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jinni. Printed By: JD Print Date: 7/23/2009 Permit Center clrr oe 11703 E Sprague Ave, Suite B-3PERMIT NUMBER: Spokgc-A aneSpokane Valley,WA 99206 _iJ BYPERMIT FEE: jValle] (509)688-0036 FAX: (509)688-0037, 1E VALLEY J www.spokanevalley.org JUL22 2 L009 Community Development JV Residential Construction ,ii-' . 1v0fNew'Construction Accessory Bldg Permit Application :Cr A Addition/Remodel Deck Other: SITE ADDRESS: ') i 0 g c6 LP�j'1QY?. Dc- ASSESSORS r ASSESSORS PARCEL NO: 4-5(2773 I L/D I LEGAL DESCRIPTION: Building Owner: Contractor: Name:-3-461-lite it ). 21't Ll i14— Name: i---,,L p S i-( (G c Address:1 7 . L�nont !D r- . Address: q/ k'),. `iCt szv'vt,ly 1 City:h. Pd k4 n C' k/a'I (.e,� State: (/c)A Zipy9,/b City: IDo V4J State: LOA- Zip:9Q./I)- Phone: ax: Phone: ( Fax- Sbg —rtaR- � So9-S3S-5s.3 segr -536 -S0/ Contractor Lic No:ru F r 51* Exp Zai:2Z 9 t 0 Contact Person City Business Lic.No: Name:AOrtniP.`�Lr, ntP_ BBr� ' i,-� i�g* fool l����l�-,_— Phone: C1 - ct , C -4-lcLf 6'inVic-3,9,51 Describe the scope of work in detail: Cost of Project: $ (( w6 o i)u t td L i‘, Gt s& r-73,_ __ Proposed Use: S-py-e, Pia,-)- q ycI giL€- 4 **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TOPEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: i l ' 5 " /5-cc ,-z I 8 MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: 37(0 0s- PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. - SIGNATURE: ? e s�Ai4- DATE: 7-�oZr/ -C Ivo 40(,1 Method of Payment: ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard#: Expires: VIN#: Eio,tA(r Authorized Signature: la\'- A't i'tg . REVISED 2/15/07d For City Use Only SiTi PLUS Project Number , �/ ilk ane Project Address • 4000 a 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents,as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required)will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07 P ?3. l�f0I Pro azq, o� / 10 1,1 f /e,no+r-� � - op / --� / g 0 $I II 1 I • 4i PLANNING DEPT. APPROVED BY DATE: