Loading...
1999, 04-16 Permit App: 99003076 Temp RelocationProject Number: 99003076 Inv: 1 f Application tie: 4/16/99 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work with, 4 = I. a permit Project Information: Permit Use: TEMPORARY RELOCATION OF STORAGE Contact: k UBERT, MIKE BUILDING (6 MONTHS MAX) Address: t) BOX 29 Setbacks: Front 100 Left: 65 Right: 50 Rear: NA C - S - Z E'ANGLE WA 99031 Phone: ;=►9) 448-2720 Site Information: twz iia'oi#'.t\`C .sid. \.\'K\ <..,szm \`G{:9l sszo{d ` ...m.vo}7:C10'i \Ci rk `huzlA4t`Ca.'<.it>..K.':::::$ ::: ' ::::: e4C0 \ >.�Y+coo.,iihYif.Cow.•:{fimmii>'titiKzoo Plat Key: 000767 Name: FAIRACRES District: H Parcel Number: 45092.0718 SiteAddress: 11208 E GRACE AVE SPOKANE, WA 99206 Location:: SPO Owner: Name: RUBERT, MIti t Address: PO BOX 29 SPANGLE WA ° .'0 031 Zoning: UR 3.5 Water District: 026 IRVIN Hold: ❑ Area: 0 Sq Ft Width: 150 Depth: 300 Right Of \t (ft): 40 Nbr of Bldgs: 2 Nbr of Dwellings: 1 Review Information.;*.' i ; " {Zi ma'wx\`sCL..L .tia,' 3da k,,,`;.:g:gk.{ e{ s;..p.3,' •.•CCk?4i`s3t;;;. Department Review BUILDING Site Plan Review Comments: BUILDING -.1 S 1 Comments: BUILDING AVA:30333;u'iC.t:3.5:....)' :i2.isC.C..'i .u3iyi}i..'iv.? i,i333 Relocation Permit Contractor: MOUNTAIN HOMESTEAD ENTER Firm: MOUNTAIN HOMES ; ‘D ENTER Address: PO BOX 29 Phone: (509) 448-2720 SPANGLE, WA 99031 Item Description Units Unit Desc Fee Amo, , 1 STATE SURCHARGE 1 Y OR BLANK $1 RELOCATION INSPECTION 1 NUMBER OF $5= ' ,. COUNTY SURCHARGE 1 Y OR BLANK $1 1 ) Permit Total Fees: $6= • • Project Number: 99003076 Inv: 1 r \, Application THIS IS NOT A PERMIT Penalties w i 11 be assessed for commencing work without a permit Date: 4/16/99 Page 2 of 2 Payment Summary: Operator: JAS Permit Type Relocation Permit Notes: Printed By: JAS Print Date: 4/16/99 Fee Amount Invoice Amount Amount Paid Amount Owing $66.49 $66.49 $66.49 $0.00 $66.49 $66.49 $0.00 $66.49 w Site Plan ?I relocated in order to determine whether a permit shall be granted and what conditions shall be placed on the permit. b. Such investigation of the building or structure to be relocated shall include in writine a listing of those items which are not in compliance, and which must be brought into compliance prior to final approval of the building or structure at its new location. with this Title and other pertinent laws and ordinance -. section 3.09.030(a) of this Chapter.) In addition to those items which are found to be in noncompliance with applicable codes and ordinances, such listing may include requirements for exterior painting, directed towards the end of providing a weatherproof exterior, and site grading, directed towards providing adequate drainage. C Such listing shall be permanently attached to the permit application as conditions of the permit. d. If upon receipt of the results of the investigation the applicant should decide not to proceed with the projea he shall be entitled to a refund equal to 80 percent of those fees paid to the Department of Buildings in excess of the initial. nonrefundable application investigation fee and the permit application shall be considered null and void_ .09.050 CONDITIONS OF RELOCATION. a. All footings and foundations on the site to which the building or structure is to be relocated shall be inspected, approved and installed prior to removal of the building or structure from its original site. b. All relocated structures shall be permanently affixed to the new foundation within 45 days of approval of the foundation. Prior to the release of the permit, the applicant may request, in writing, an extension of the 45 day time, subject to approval by the Building Official who may attach such conditions as he deems necessary to any such request. All relocated structures shall be brought into compliant: with the findings and other requirements of this Title within six months of the date of the permit issuance unless othen; ise approved by the Building O Official. c Failure to comply with the requirements of subsection (b) above shall resul~ in the relocated building or structure being classified as a temporary building, s.ibject to the conditions placed on temporary buildine& and additional fees shall be charged as per the "each additional month" charge for temporary buildings. beginning with the 46th day subsequent to approval of the foundation- Such fees shall be ce.-lected as per section 3.08.060(b) of this Title. d- All relocated buildings or structures, whether permanently affixed to ate new foundation or not. and all buildings or structures to be relocated. shall be m—tintained in a safe. secure condition. e. When a buildine or structure is temporarily relocated to the regularly n,cupied place of business or storage yard of a house mover or such other loca_ion a may t•e approved by the Building Official. all provisions of this Chapter shall apph ,xcep: that. 42 CHA?"TER 9 - RELOCATED .AND TEMPORARY STRUCTURES -TIA../' APPLICATION INFORMATION it is the JOB SITE address? ASSESSOR'S tax parcel number? d description as it appears on the property deed COMPLETE ALL APPLICABLE INFORMATION 3 OWNEREE failing Phone a state Zip Who should we contact regarding this project? Phone What work is being done under this permit? %�r►, r, ( 060 7 4- ! �? bl_, one inspector district rope size Hight of way vAcfthy n c ater district = t i ll � d C Building Building height # of stories Contractor /f Dimensions WA State Contractor license # "2 0u N 11767 Main floor area Unfinished basement area Mailing a ress J-' 0 �'&r4 n floor area anis asemen area rc itec ngmeer -etc. Garage area Size of decks, What is the heat source? What is the cost of your project? anufactured ome Sign Width: Length: :::::Jhe hat is the square footage of How high is the sign? sign face? Year: Make: Installer Contractor Wa State Contractor license # Wa State Contractor license # Mailing address Mailing address RelocationFire"'Safety Previous address Fire Sprinkler — "Paint Tent Q a booth _ Fire Aiarm _ Fireworks dispiay - -5 VALUE ct r Contractor ate Contractor license;)t c rfe: 7 kMailing A State Contractor license # address Mailing address ii s.� Fuel Storage Tanks Swimming Pool (Circle one) Above -ground Underground Size / gallons Private Contents of tank(s) Size /gallons Public/semi-private ontractor Contractor lWa State Contractor license # A State Contractor license # [Mailing Mailing address address COMPLETE ALL APPLICABLE INFORMATION 3 01 M Site Plan INCLUDE THE FOLLOWING: ❑ All roadways, driveways & easments ❑ Underground utilities ❑ Distances from center of roads, right of ways, ❑ North arrow private roads & property lines ❑ Septic tanks & wells ❑ All existing & proposed buildings N T