Loading...
2012, 05-09 Permit: SW-12001293 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001293 Permit Issued Date: 05/09/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: GREEN HAT PLUMBING Project Name: ROCKWELL PHASE 2 Applicant: GREEN HAT PLUMBING Permit Type: SEWER Address: P.O. BOX 468 CHEWELAH, WA 99109 Phone: 509-936-0473 Email: SITE INFORMATION: Site Address: 14115 E LONGFELLOW AVE Owner: HARDY, JUSTIN & ALEXIS Parcel Number: 45022.4122 Address: 14115 E LONGFELLOW AVE SPOKANE, WA 99216 Subdivision: VALLEY HOMES Phone: SUBDIVISION Assessor's Description: TRENTWD ORCH VLY HOMES L22 B1 Email: Inspection Area: Water District: Trentwood Fire District: Fire District 1 Irrigation District #3 Zoning: Land Area: 0.155 acres / 6751.31 sqft CONTRACTOR INFORMATION: General Contractor GREENHP981CN GREEN HAT PLUMBING/HEATING INC 2937 FARM TO MARKET RD CHEWELAH, WA 99109 509-937-2279 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 05/09/2012 09:30:41 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001293 05/09/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/09/2012 09:30:41 Printed by: IIS APPPOOL\ASP.NET v4.0