2012, 09-04 Permit: SW-12002130 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002130
Permit Issued Date:
09/04/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
ROCKWELL PH 2
SEWER
Primary Contact:
Applicant:
Address:
Phone:
Email:
BOB LONG EXCAVATING
BOB LONG EXCAVATING
PO BOX 305
VALLEYFORD, WA 99036
509-924-4782
SITE INFORMATION:
Site Address: 14119 E LONGFELLOW AVE
Parcel Number: 45022.4123
Subdivision: VALLEY HOMES
SUBDIVISION
Assessor's Description: TRENTWD ORCH VLY HOMES L23 B1
Inspection Area:
Zoning:
Owner:
Address:
Phone:
Email:
BOCOOK, HEIDI
14119 E LONGFELLOW AVE
SPOKANE VALLEY, WA 99216
Water District: Trentwood Fire District: Spokane Valley Fire
Irrigation District #3
Land Area: 7000 Square Feet
CONTRACTOR INFORMATION:
General Contractor
LONG*RA246R0
LONG, ROBERT A
PO BOX 305
VALLEYFORD, WA 99036
509-924-4782
DETAILS:
Class
Type
Quantity
Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 09/04/2012 15:20:29
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002130 09/04/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 09/04/2012 15:20:29 Printed by: IIS APPPOOL\ASP.NET v4.0