2012, 04-19 Permit: SW-12001153 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001153
Permit Issued Date:
04/19/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
ROCKWELL PH 2
SEWER
Primary Contact:
Applicant:
Address:
Phone:
Email:
GOBER'S
GOBER'S
11215 E TRENT AVE
SPOKANE, WA 99206
509-924-5372
SITE INFORMATION:
Site Address: 14123 E LONGFELLOW AVE
Parcel Number: 45022.4124
Subdivision: VALLEY HOMES
SUBDIVISION
Assessor's Description: TRENTWD ORCH VLY HOMES L24 B1
Inspection Area:
Zoning:
Owner:
Address:
Phone:
Email:
BRANDT, HENRY W
49 2ND AVE
MURRAYSVILLE, WV 26164
Water District: Trentwood Fire District: Fire District 1
Irrigation District #3
Land Area: 0.1607 acres / 7000 sqft
CONTRACTOR INFORMATION:
General Contractor
GOBERL*899L7
*GOBER'S LLC
11215 E TRENT AVE
SPOKANE, WA 99206
509-924-5372
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 04/19/2012 10:06:42
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001153 04/19/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/19/2012 10:06:42
Printed by: IIS APPPOOL\ASP.NET v4.0