Loading...
2007, 11-15 Permit: 07004473 ResidenceSpokane e� Dalley® BUILDING DIVISION 1 Site Information 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Project Information Site Address: 603 N LUCILLE LN Parcel Number: 45144.0522 Subdivision: Block: Lot: Zoning: R-3 SF Res District Owner: DIAMOND ROCK CONSTRUCTION Address: 2602 N SULLIVAN SPOKANE VALLEY, WA 99216 Building Inspector: EAST Water Dist: Project Number: 07004473 Inv: 1 Issue Date: 11/15/2007 Permit Use: SFR W/ATT GAR Applicant: DIAMOND ROCK CONSTRUCTION 2602 N SULLIVAN SPOKANE VALLEY, WA 99216 Phone: (509) 924-8964 Contact: DIAMOND ROCK CONSTRUCTION 2602 N SULLIVAN SPOKANE VALLEY, WA 99216 Phone: (509) 924-8964 Setbacks - Front: 27 Left: 24 Right: 12 Rear: 133 Group Name: Project Name: Permits Building Permit Building Height : 25 Contractor: DIAMOND ROCK CONSTRUCTION License #: DIAMORC0320Q 1&2 FAMILY R-3 VB 894 RESIDENTIAL PERMIT FEE $1,34655 2ND FLOOR .. R-3 VB 730 WSBC SURCHARGE $4.50 BASEMENT F R-3 VB 300 SF PLNS RVW <7999 SQ FT $538.62 BASEMENTU R-3 VB 515 COV DECK R-3 VB 138 Total Permit Fee: $1,889.67 DECK OPEN R-3 VB 180 GARAGE U-1 VB 410 Total Value: $162,477 24 FOR BUILDING INSPECTIONS CALL (509) 688-0054. Mechanical Permit Contractor: DIAMOND ROCK CONSTRUCTION License #: DIAMORC032OQ DUCT SYSTEMS 1 $10.00 GAS WATER HEATER 1 $10.00 GAS APPLIANCE<=100,000BT 1 $12 00 GAS PIPING 2 $2.00 VENTILATING FANS 3 $30.00 CLOTIIES DRYER 1 $10.00 HOOD -TYPE II 1 $10 00 FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. Plumbing Permit Total Permit Fee: $84 00 Contractor: DIAMOND ROCK CONSTRUCTION License #: DIAMORC032OQ TOILETS/BIDETS 2 $12.00 SINKS 4 $24.00 TUBS 2 $12.00 DISH WASHERS 1 $6.00 CLOTHES WASHER 1 $600 MISCELLANEOUS FIXTURES 2 $12.00 Total Permit Fee: $72.00 FOR PLUMBING INSPECTIONS CALL (509) 688-0054 Processed By: DAVIS, JENNA Printed By: TURBAK, MIKE Page 1 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Wiley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure. this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or Issuance of a Certificate of Occupancy - MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall. concrete, etc. must be inspected prior to cover. Check with the Building department for "special Inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes inferior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Fermis and inspections for electncal wrong. State Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Division And Industries 324-2640 477-3604 Permits and inspections to on-site septic systems. Spokane Regional Fre spnnkier and alarm systems and pnvaie access road Inspections. Spokane Valley Health Distract 324-1560 Fire Department 892-4122 Stale law RCW 19 122 requires Thal pnor to any excavation the 'CALL BEFORE YOU DIG- center crust be notified Call before you dig at least 2 working days in advance, 456-8000 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work Is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed Owner / Agent Date Staff Approval Date Spokane e� valley® BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 603 N LUCILLE LN SPOKANE VALLEY, WA 99216 Parcel Number: 45144.0522 Project Number: 07004473 Inv: 1 Issue Date: 11/15/2007 Permit Use: SFR W/ATT GAR Permits Payment Summary Total Fees AmountPaid AmountOwing $2,045.67 $2.045 67 $0.00 Tran Date Receipt ti Payment Amt 11/15/2007 12135 $2,045.67 Processed By: DAVIS, JENNA Printed By: 'I'URBAR, MIKE Page 2 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This Inspection includes review of the structure's setback from property lines Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily Indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing. bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use All permits require final inspection. NOTE' In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. - MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways. City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for eleclncal wnng, State Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities 0i' sron And Industries 324-2640 477-3604 Permits and inspections for on-srle septic systems, Spokane Regional Fire spnnkier and alarm systems and pnvate access road inspections, Spokane Valley Health District 324.1560 Fire Department 892-4122 Stale law ROW 19.122 requires That poor to any excavation the -CALL BEFORE YOU DIG' center must be notified Call before you dig at least 2 working days in advance, 456-8000 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date