Loading...
2012, 04-10 Permit: SW-12001077 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001077 Permit Issued Date: 04/10/2012 Expiration Date: Project Description: Permit Type: SEWER CONNECTION SEWER Primary Contact: POUL CONSTRUCTION Applicant: POUL CONSTRUCTION Address: Phone: Email: 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 509-979-5872 SITE INFORMATION: Site Address: 14421 E LONGFELLOW AVE Parcel Number: 45022.2322 Subdivision: TRENTWOOD ORCHARDS Assessor's Description: TRENTWDORCH THROOP&FITZ L22 B3 Inspection Area: Owner: Address: Phone: Email: WELLS FARGO BANK, NA 400 NATIONAL WAY SIMI VALLEY, CA 93065-6414 Water District: Trentwood Fire District: Fire District 1 Irrigation District #3 Zoning: Land Area: 0.1827 acres / 7958.75 sqft CONTRACTOR INFORMATION: General Contractor POULCC*932BQ POUL CONSTRUCTION 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 509-979-5872 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 04/10/2012 11:28:33 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001077 04/10/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/10/2012 11:28:33 Printed by: IIS APPPOOL\ASP.NET v4.0