2012, 04-26 Permit: SW-12001220 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001220
Permit Issued Date:
04/26/2012
Expiration Date:
Project Description: SEWER CONNECTION
Permit Type: SEWER
Primary Contact: COURCHAINE CONSTRUCTION
Applicant: COURCHAINE CONSTRUCTION
Address: 16402 E VALLEYWAY AVE
VERADLE, WA 99037
Phone: 509-924-5485
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
14810 E LONGFELLOW AVE
45021.2003
Subdivision: TRENTWOOD
ORCHARDS
Assessor's Description: TRENTWD ORCH PT OF B14 E165FT OF W446FT
OF S155FT
Inspection Area:
Owner:
Address:
Phone:
Email:
HARDER, DALE & DEBORAH
14810 E LONGFELLOW AVE
SPOKANE, WA 99216-1577
Water District: Trentwood Fire District: Fire District 1
Irrigation District #3
Zoning: Land Area: 0.5871 acres / 25575 sqft
CONTRACTOR INFORMATION:
General Contractor
COURCC*181 R7
COURCHAINE EXCAVATION
19818 E SPRAGUE
GREENACRES, WA 99016
509-928-0846
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 04/26/2012 11:30:49
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001220 04/26/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/26/2012 11:30:49
Printed by: IIS APPPOOLWSP.NET v4.0