Loading...
2012, 04-19 Permit: SW-12001150 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001150 Permit Issued Date: 04/19/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION SUMMERFIELD PH II SEWER Primary Contact: Applicant: Address: Phone: Email: NORM'S EXCAVATING INC NORM'S EXCAVATING INC PO BOX 574 VERADALE, WA 99037 509-928-0580 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 14913 E LONGFELLOW AVE 45021.6102 TRENTWOOD ORCHARDS BARTHOLOMEW SUBDIVISION L2 B2 Owner: Address: Phone: Email: HILL, RICHARD L & BETTE B 14913 E LONGFELLOW AVE SPOKANE VALLEY, WA 99216 Water District: Trentwood Fire District: Fire District 1 Irrigation District #3 Land Area: 0.331 acres / 14420 sqft CONTRACTOR INFORMATION: General Contractor NORMSEI972BM NORM'S EXCAVATING INC PO BOX 574 VERADALE, WA 99037 509-928-0580 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 $125.00 Total Fee: $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST WORKING O INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES,INCLUDINGREQUIRES THOSE THE RELATED TO TRENCH SAFETY. Date Printed: 04/19/2012 11:20:13 Printed by: IIS APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001150 04/19/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/19/2012 11:20:13 Printed by: IIS APPPOOL\ASP.NET v4.0