2010, 12-30 Permit App: 10004187 Pole BldgProject
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Site Address: 15715 E LONGFELLOW AVE
Parcel Number: 45012.1210
Zoning: R-3 Water District: TRENTW
Fire District: FD 01
Applicant: BUNKER BUILDIN
PO BOX 48287
SPOKANE, WA 9
(509) 468-8182
e-mail:
Contact: BUNKER BUILDIN
PO BOX 48287
SPOKANE, WA 9
(509) 468-8182
e-mail:
Contractor: BUNKER STEEL
1028 W ROSEWC
SPOKANE, WA
(509) 468-8182
Newproject
Previous pre -app meeting
Plan revisions El
Transmittal Date:
Thursday, December 30, 2010
Project Number: 10004187
I \rn't' x
e-mail:
Project NEW 30 X 48 POLE BLDG FOR SHOP
Description:
15L ,JONA
71NGFELLOW AVE
SPO VALLEY, WA 99216
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATION
CONSTRUCTION PLAN
SITE PLAN
�
a
TD
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Jodi Main
From:
Sent:
To:
Cc:
Subject
Please process.
Thanks!
KAP—EN K.ENDAU_
50J°.,-20.5026 dCrect
509.921.1002 fax
Karen Kendall
Thursday, December 30, 2010 4:27 PM
Heather Morris
Jodi Main; Permit Center
FW: 15715 E Longfellow (10-4187) Proposed 40x40 detached shop
From: Jim Kerr- Bunker Steel Buildings (mailto:iim@bunkerbuildings.coml
Sent: Thursday, December 30, 2010 4:25 PM
To: Karen Kendall
Subject: Re: 15715 E Longfellow (10-4187) Proposed 40x40 detached shop
yes please withdraw this application,
thank you
Jim
----- Original Message -----
From: Karen Kendall
To: Jim Kerr Bunker Steel Buildings
Sent: Thursday, December 30, 2010 3:26 PM
Subject: 15715 E Longfellow (10-4187) Proposed 40x40 detached shop
Jim,
I am following up with our conversation about the proposed detached shop located at 15715 E Longfellow Road.
During my review I noticed the proposed structure and all existing detached structures exceed 1,760 or the maximum
of ten (10) percent of the lot size (110'x160' = 17,600). In conclusion I suggested you may withdrawing the permit (10-
4187) and resubmit after revising the proposal.
Please confirm that you request to withdraw the application (10-4187). The City will do a same day reversal of the plan
review payment, which was paid today.
Thanks.
KAREN ICENt5A( L
-"r5�i_`ar.,� ;^v?V.,v� �'r, CCff ✓r u;n,itL1 DPV.�.ow�^.efa D�Ac?; :vn.�b�t
! of
t;ppr�?re ✓a�l,�...
-;'a t SV"C �''.ue AVeV"(e, mac!ate
V21 Levi,
ComrT unity Develo V%qV 3i i nt
Perm t Center
11703 East Sprague Avenue, Suite B-3
Spoka a Valley, WW�'LO� 2010
Tel: (09) 688-00
Fax:(09) 688-0037
permibc M§p4q AU$y ago iait 1
(Staff Use Only)
PERMIT NUMBER:
PERMIT
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
NEW CONSTRUCTION El ADDITION/ REMODEL XACCESSORY
DECK OTHER
SITE ADDRESS: S7 IS Lc�rgQ l Qw Pp 1/ct ��Rt�
BUILDING
�q..l�
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME:
v1�
NAME: SOS, ore,k,Ck
tir.-
ADDRESS:
Main Floor SQ FT:
1
A
CITY: STATE:
ZIP:
PHONE: - �% ��� FAX:
CELL:
CONTACT NAME:
FT: T/ / 1i
PHONE: FAX:
CELL:
i
C.�
CONTRACTOR NAME: uc-'i[�. k- �`-Q�tL QIA
Impervious Surface
Area:
MAILING ADDRESS: OZc4 1-+
'aoa4ao
CITY: STATE: W9
ZIP:
r' r0 Q
PHONE: '( (a- `'� FAX: 1 b 1
CELL:
CONTRACTOR LICENSE NO.: EXPIRES: �l CITY BUSINESS LICENSE NO.: �� 2-1 S
DESCRI E T P WORK IIV DETAIL N_ NDICATE SE
Fr C: �n _ . P� ��� ; ac o
&PRO OSED USE:
se �,s c���
EZ3E3
MARK N/A TF NOT APPLTCARLF
Height to Peak: �_
ensions, i ,
No. of_Stories:
Total Habitable ,�
v1�
O'x4z w� IO�tya
tir.-
Space: 1
Main Floor SQ FT:
1
A
Upper Floor SQ FT:. W
/A
Unfinished Basement SQ
FinishVjBAement SQ
11��++
tj /
FT: T/ / 1i
FT:
Garage;;Q FT ,- -'TQ
Deck/Covered Patio SQ
FT:
Impervious Surface
Area:
30% Slopes on
Property: 00
'aoa4ao
N /K±
P i A
No. of Bedrooms: N I
Construction Type:
Heat Source: A
Sewer or Septic: -'qwA-c
TOTAL COST OF PR03ECT:
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is o a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be rg�o be submitted and subsequently approved before this application can be processed.
,06olAW28, 2007 Page 1 of 2
mmunity Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
For City Use Only
CITY OFk PLUS Project Number n Project Address
pose
ValleyO 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
e/ 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
(57t S E. W �e.� F� cam..►
wi 19Q-1
Sok2 1210_.
Ho
Ex��►�g
346'x zy' a�ay.
Acit, L.,1r
CS'�+i
Q'rya' e4.cift
(O'g'-1o'
&ea "--17
Lc) r\SceI ipw Ave.
Ass
k X11'
(5'7 E. &vs5tt,16“....J
4-4So .
S
Atki
0
cck
t
WAMBEKE ENGINEERING 2913 East 61s' Court
Daniel Wambeke, P. E. Spokane, WA 99223
Telephone: 509-443-6186 • Fax: 509-448-6582 • dwambeke @msn.com
STRUCTURAL DESIGN DRAWINGS
FOR
30'X 40'X 14'6" POST FRAME BUILDING
WITH 10'X 40'X 9' LEAN-TO AND
18'X 10' SUSPENDED LOFT
FOR
MORELOCK PROJECT
SPOKANE VALLEY, WASHINGTON
JOB NO. BB1867
PREPARED FOR
BUNKER STEEL BUILDINGS, INC.
SPOKANE, WASHINGTON
December 24, 2010
Designer of Small Structures, Post Frame Buildings, Foundations,
Light Gauge Steel Framing and Grain Storage Systems
WAMBEKE ENGINEERING 2913 East 61si Court
Daniel Wambeke, P. E. Spokane, WA 99223
Telephone: 509-443-6186 • Fax: 509-448-6582 • dwambeke@msn.com
STRUCTURAL DESIGN DRAWINGS
FOR
30' X 40' X 14'x' POST FRAME BUILDING
WITH 10' X 40' X 9' LEAN-TO AND
18' X 10' SUSPENDED LOFT
FOR
MORELOCK PROJECT
SPOKANE VALLEY, WASHINGTON
JOB NO. BB1867
PREPARED FOR
BUNKER STEEL BUILDINGS, INC.
SPOKANE, WASHINGTON
December 24, 2010
)
Designer of Small Structures, Post Frame Buildings, Foundations,
Light Gauge Steel Framing and Grain Storage Systems
72
M J
MORELOCK
BB1867
30X40X14 6:12
10X40X9' 6:12
CITY OF SPOKANE VALLEY!
40# SNOW LOAD
85 MPH WINDS
EXPOSURE B
I 1
V-3"
I 10' LEAN TO 30' GABLE
i
40' OVER ALL
j
PAGE 1
o
�
.I
I
2.2X12 RAFTER
114'
t
i
0
I i
f
-
I
r 2-2X12 RAFTER
114,
I
0
_
1
I ,
I.
■ 2-2X12 RAFTER
114
<
I
o
1
I
I
14
ML
1-2X12 END RAFTER
I 1
V-3"
I 10' LEAN TO 30' GABLE
i
40' OVER ALL
j
PAGE 1
GRADE
CONCRETE
USE IN THIS
ORDER
LCEN"TRAL PREMIX
533-0208
2. SPOKANE ROCK PROD
244-5421
3. INTERSTATE
292-8600
4. TONERS
292-2360
'TREATED POST
T.P.22 .60 RFTFNTTON
23 POSTS
SEE BELOW
POST FOO'L'ING SCI IEDULE
c
0
N
RW
L
T c; WA
r,
18067
SIONAL
ORDERj-SO YARDS 4 SACK POST MIX CONCRETE
'IF OkDERING LESS THAN 4 YARDS
FROM ANYONE BUT CENTRAL
PREMIX CALL OFFICE FIRST'
JOB INFO.
NAME P.O. #
MORELOCK BB. 1867
LOCATION
�'d
DIAMETER
DEPTH
d
v
SECTION 3,4 B+C
6X8
30,10
3'
SECTION 2B
6X8
3l"0
3'
0•(0(p
'
SECTION 2 C
�
Q
3'
D
d
SECTION A
a
,
�
0. 3 j
1.4-o
ALL OTHERS
6X6
20"
3'
.24
2.88
Q
d,
�
1
d
i
'
a'517
'
23 POSTS
SEE BELOW
POST FOO'L'ING SCI IEDULE
c
0
N
RW
L
T c; WA
r,
18067
SIONAL
ORDERj-SO YARDS 4 SACK POST MIX CONCRETE
'IF OkDERING LESS THAN 4 YARDS
FROM ANYONE BUT CENTRAL
PREMIX CALL OFFICE FIRST'
JOB INFO.
NAME P.O. #
MORELOCK BB. 1867
LOCATION
POST SIZE
DIAMETER
DEPTH
YDS. PER
6 ,SY
TOTAL.
Z_ (c)
SECTION 3,4 B+C
6X8
30,10
3'
SECTION 2B
6X8
3l"0
3'
0•(0(p
0-&G
SECTION 2 C
6X8
L G " 0
3'
0,C
O . (- (
SECTION A
6X6
Z-4," 0
3'
0. 3 j
1.4-o
ALL OTHERS
6X6
20"
3'
.24
2.88
PAGE 2
" V'1
612 ! 4'-7" 4'-7..
14' EAV YPEAK PRE M N TRUSS
9' EAVE
112X12 END
RAFTER
12X12 OHD 12X12 OHD
[MIN. 12-16D
NAILS RAFTER
TO POST
OPEN '
MORELOCK
BB18B7
30X40X14 6:12
10X40X9 6:12
2X6 R,P N FLIP
ROOF AREA
2" MBI
OPEN
OPEN
OPEN
OPEN
ROOF AREA
2" MBI
2X12 RIPPED
0
2X8 �t otirrao�Y
0
SECTION B
2X10 P.T.
ROOF AREA
2" MBI
2X6 RIP N FLIP
7
2X10 P.T.
.( SECTION C 1
PAGE 4
I'll ---I
TRUSS
3 (4-:` O` X11-
2X8 SUPPORT
MOCKS
6X6 POST
1.2X12 END RAFTER
2X6 RIP & FLIP
6X6
POST
NAUNCH,PURLINS 8 RIDGE lj
2x12 RIPPED
I.
CUT TRUSS TAIL
112 OF POST TO
CONNECT RAFTER
2X 6
Roof Purlins
@ 24.. o.0
USEZZ 16D NAILS
<- TO ATTACH
2X6X16" UNDER
TRUSS BOTTOM
CORD
Top Purlins
Each Side
W/ 2x4 U Purlin
PRE -MANUFACTURED
TRUSS
RAT RUNS 70-601 O.C.
Fsic—TIONS 1 A TO 6
u
Iu
e
C
---1
TRUSS
4w(f M. /if/LT
1-2X8 SUPPORT
BLOCKS
6X6 POST
2X6 RIP- N FLIP
1-2X12 END
RAFTER
HAUNCH,PURLINS 8 RIDIGE]i
2x12 RIPPED
I
CUT TRUSS TAIL
112 OF POST TO
CONNECT RAFTER
6X6
POST
2x 6
Roof Purlins
@ 24 o.0
USE22-IOD NAILS
EACH TO ATTACH
2XSX1S" UNDER
TRUSS BOTTOM
CORD
Top Purlins
Each Side
W/ 2x4 'L' Purlin
PRE -MANUFACTURED
TRUSS
RAT RUNS 71_611 O.C.
[ SECTIONS 5 A TO B
D
J�HAUNCH,PURLINS 8 RIDGE
SPACE PURLINS
EAVE, 2', 4', 6, 8',10', RIPPED, 1.2', 14', 16', 18',
20', 22',24'.26!, (78'+/- L-PURLIN)
NON SHED SPACE PURLINS
SAVE, 25-,5U', 75",100".125".150-.175!',
(200" +/- L-PURLIN)
24 PURLINS
22 HANGERS
2X6 RIP & FLIP
i. _e__�
NOTCH POST
TO ACCEPT
RAFTERS
2-2X12 RAFTER
6X6
POST
2x12 RAPPED
W
L:
2x 6
Roof Purlins
@ 24 o.0
Top Purlins
Each Side
W/ 2x4 U Purlin
PRE -MANUFACTURED
TRUSS
r -
Lu
1 -BOLT TRUSS TO POST 8-6D NAILS
RAT RUNS 7'-6' O.C.
1 -BOLT SUPPORT BLOCK TO POST 8-16 NAILS ,-iia
24" 2X8
SUPPORT BLOCK
L 1' WAA'f`
1�� !WASjit
BUILDER NOTE:
SECTION 2 B FOR LOFT AREA
SECTIONS 3,4 A TO B
I L.
18067 �
S0LC�
c
jj HAUNCH, PURLINS &-RIDGEII
NON SHED SPACE PURLINS a@
SAVE, 25", 50", 75-,100%125-,150-,175-.
(200"+/- L-PURLIN)
**2x 6
Ripped/Flipped
2x6 girts
2x 6
Roof Purlins
@ 25" o.c
Top Purlins
Each Side
W/ 2x4 V Purlin
PRE -MANUFACTURED
TRUSS
� BOLTING:
TRUSS TO POST 1 BOLT B' -16D NAILS
SUPPORT BLOCK TO OST 2 BOLTS 8-161) NAILS
24' 2X8 SUPPORT BLOCK
RAT RUNS -71 AllO.0
BUILDER NOTE:
SECTION 2 C FOR LOFT AR
SECTIONS 3,4 C
CD
W
THE FOLLOWING MINIMUM ROOF DIAPHRAGM REQUIREMENTS ARE NEEDED,
■ ROOF STEED 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT
■ FIELD SCREWSi 1110 x 1 1/2' AT 9. O.C. (NEXT TO HIGH RIB)
if EAVE AND RIDGE PURLIN SCREWS+ N14 xl 1/2' AT BOTH SIDES OF
EACH MAJOR RIB
THE FOLLOVING MINIMUM ENDWALL DIAPHRAGM REQUIRMENTS ARE NEEDED,
■ ENDWALL STEED 29 GAUGE GRAND -RIB 111, 36' WIDTH OR EQUIVALENT
0 FIELD SCREVSi ca x 1 1/2' a 9' D.C. (NEXT TO HIGH RIB)
■ BASE GIRT, END TRUSS, AND DOOR HEADER SCREWS, 014 x 1 1/2'
Q BOTH SIDES OF EACH MAJOR RIB.
DIAPHRAGM SCREWS
DIAPHRAGM SCREWS @ ENDVALL AGRSSR
EAEA`LPRELRENDTUTOPCHORD,VRHEADERS GABLE
DIAPHRAGM SCREWS] TYPICAL SCREW PATTERN, EXCEPT AS
NOTED ABOVE
STEEL SHEETING SCREW PATTERNS
N.T.S
li
PAGE 6
For City Use,0n17
PLUS Project Number ' ' '
SCITY16 Project Address '
ane
p
alle °
y 11703 E Sprague Ave Suite B-3 ♦Spokane Valley WA 99206
49; 00 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is–,—,
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Proiect Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9107
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Site Address: 15715 E LONGFELLOW AVE
Parcel Number: 45012.1210
Zoning: R-3 Water District: TRENTWOOD
Fire District: FD 01
Applicant: BUNKER BUILDINGS
PO BOX 48287
SPOKANE, WA 99208
(509) 468-8182
e-mail:
Contact: BUNKER BUILDINGS
PO BOX 48287
SPOKANE, WA 99208
(509) 468-8182
e-mail:
Contractor: BUNKER STEEL BUILDINGS
1028 W ROSEWOOD
SPOKANE, WA
(509) 468-8182
Newproject E]
Previous pre -app meeting E]
Plan revisions ❑
Transmittal Date:
Thursday, December 30, 2010
Project Number: 10004187
Owner: MORELOCK, JON A
15715 E LONGFELLOW AVE
SPOKANE VALLEY, WA 99216
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
Project NEW 30 X 48 POLE BLDG FOR SHOP
Description:
Please send all plan review and project comments via e-mail to the
highlighted individuals.
r Com unity Develo�t)nt Y i (Staff Use Only)
I`` Perm Center
1170 East Sprague Avenue, Suite B-3 I PERMIT NUMBER:
ca e�N �erm'l ( 09) 688-00� d Z��C PERMIT FEE:
V Y''
Fax ( 09) 688-0037
% _ mit Center
w
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
NEW CONSTRUCTION ADDITION/ REMODEL ACCESSORY BUILDING
rj DECK OTHER
SITE ADDRESS: go,�� S(r, Va IIR� 1q 3�G
ASSESSORS PARCEL NO.: {Sol? - IZ" o LEGAL DESCRIPTION:
BUILDING OWNER NAME:�Cjr. MaF�-ISG
NAME:SOn j�omkAck
ADDRESS: �ML
CITY: G�Q STATE: ZIP:
PHONE: \ \� - a I N) FAX: CELL:
CONTACT NAME:
PHONE: FAX: CELL:
CONTRACTOR NAME: aI
MAILING ADDRESS:
CITY:o STATEt:�W i0k ZIP:
PHONE: i 0 �_ 8' 8�) FAX: (-� v' I1 CELL: 9 s *?+
CONTRACTOR LICENSE NO.: QVWiES6:9S5 � EXPIRES: �% CITY BUSINESS LICENSE NO.: 6' >-,q�o�
I
DESrCeR4E T2HE,4So OPtE3OF�WOSKJaI DEAL CNRJ�DICA4V
CE DISE & seOOaS aV
****YOU MUST COMPLETE THE FOLLOWING****
MARK 111 /A TF NAT APPI TrARI F
Height to Peak: �_
Peak:;)
ensions: No. of Stories: '
Total Habitable
N
0 x44 � w� IO,cya •tom-�
Space:
Main Floor SQ FT:
Upper Floor SQ FT: �/ Unfinished Base nt SQ
A
Finish d B ement SQ
FT: N�;
FT:
Garage Q FT• ,. To
Deck/Covered Patio SQ Impervious Surface
30% Slopes on
' 4�4 a0
FT: ti 1b Area: N i A
Property: o o
No. of Bedrooms: N l
Construction Type, Heat Source: R
Sewer or Septic: Sa�e-
TOTAL COST OF PROJECT: $
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. S) The City of
Spokane Valley permit is,,noa permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be rg4iLoo be submitted and subsequently approved before this application can be processed.
./
:WFolf28, 2007 Page 1 of 2
munity Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
Receipt Number: 25501
Projects
City of Spokane Valley
Building Dept
Receipt
Customer Number
Full
Proiect Nbr Inv Nbr Fee Amt Inv Amt Owin-g PAID Pmt
10004187 1 $544.06 $544.06 $544.06 $107.91 El
Total: $544.06 $544.06 $544.06 $107.91
Miscellaneous Items
Total PAID: $107.91
Tender
Type
Check Acct Balance CC Nbr
Exp Date
TENDERED
Checkl
10924
107.91
Payer: BUNKER BUILDINGS
Total TENDERED:
107.91
Over /(Short)
$0.00
Change
$0.00
Notes:
Tran Date / Time:
12/30/2010 2:48:59 PM
By:
HMORRIS
Logon User:
BldgCounter
Station:
CX SV00014A
Override By:
Printed: 12130/2010 2:49:00 PM
Page I of I
1\4 L�
Aore.A c.k
(5 ' IS (,,,,,, r5 e.,i1 o t,-)
S
LA r
Lo�se1 \pcu f�ve