Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2011, 07-18 Permit App: 11002125 Reroof
CITY OF do•OValley Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@)spokanevalley.orr (Staff Use Only) PERMIT NUMBER: PERMIT FEE: L' 7 REROOF CONSTRUCTION PERMIT APPLICATION ❑ COMMERCIAL SITE ADDRESS: 3517 S LORETTA DR © RESIDENTIAL ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: IVAN GRACHEV NAME: �\%74 N Coli ( VPs-LLQJ)G& (.r3CheN ADDRESS: (26\4 3, l ,d {-f_A--t.GLJDy- CITY: " in. a{'1.Q \ d...OLk t PHONE: � qq— ?-)L{ O FAX: CONTACT NAME: 1--.6x liter ,( IVA-A I PHONE: STATE: IA ZI`PP: g9)fl�, 2 CELL: C J l O a FAX: CELL: CONTRACTOR NAME: (,L jt/l,g/ MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE NO.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: REROOFING WITH A NEW LAYER OF 30 YR PABCO ROOFING ON EXISTING ONE LAYER OF ROOFING BY A HOMEOWNER. REROOFING WITH A NEW LAYER OF 30 YR PABCO ROOFING ON EXISTING ONE LAYER OF ROOFING BY A HOMEOWNER. ❑ Tear Off - ® Overlay TOTAL COST OF PROJECT: $ 2178.50 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature uPrr��� 'rac4o,l Date: 7-18-2011 Method of payment: 0 Cash 0 Check Bankcard #: ❑ Visa EXP: 0 Mastercard VIN#: Authorized Signature: Effective October 28, 2007 Page 1 of 1 P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Reroof Construction Permit App 10.28.07.doc