2012, 07-18 Permit App: APR-2012-0020 ApproachJu1.18.ZUIZ uy:u4 am
Jul. 18. 2012 8:17AM Spokane Valley Permit Center
*Wane
doi.Valley
Community Development Department
Permit Center
11105 past Sprague Avenue, Suite 13.3
Spoken* Valley, WA 99206
Tel: (509) 720-5240
Fax: (509) 688-0037
pennilcenter rgaguklneynllcY.ore
No. 8790 P. 1
(S Pair Uso Only)
PERMIT Nunrat:R:
PERMIT 1 Se
APPROACH PERMIT APPLICATION
PROJECT ADDRESS:
START DATE: 7 -
!HAILING ADDRESS:
6 0 � ,� - L o c t�t'C.l
CITY: pOk a VAP_ STALE: ( A-,
CONTACT PERSON NAME: .S
5601 _s Lope ko
ANTICIPATED COMPLETION DATE:
—20-1 i
ZIP: 1 92.06.
PKONg: a
CONTRACTOR NAME:
NIAILINC ADDRESS:
I?Ax: W -c -16!
c - • k nC.
Cr
Dc 7 /2 O
CITY: A .. Yl e_
STAIR:
PI1ONC: --Sg 6( FA:K:
LICet s� CITY BUSINESS LICENSE #:L t 33 81 O
PROJECT DESCRIPTION (Please Provide Site Sketch)
Q CommercfaU(ndustrial Driveway
Q Rural Road Section
Sidewalk Repair/Construction
CONTRACTOR
I/Residential Driveway
El Existing Curb & Gutter
p Culvert rnstallaDon
0 Other Conditions:
Bone/Insurnrrce certification must be milk with the Clr3'.
prSCLA1ME]
The permitted verifies, acknowledges and agrees by their signature that: I) if this permit Is for construction or on a dwelling. the
dwelling is/will bo scnrod by potable water. 2) Ownership of this CitY of Spokane Valley permit inure to the property owner. 3) The
signatory Is the property owner or has permission to represent the property owner In thio transaction. 4) All construction is to bo done
in 6111 compllnnce with the City of Spokane Valley Development code. Referenced codes are available rbr review at the City of
Spokane Valley Permit Center. 5) The City of Spoken Valley permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may bo required to be submitted and subsequently approved
before this application can be procas,ed.
•Slgraatnre
A%.467 -
Date; 7" /d /c
DE -001: V -I Pogo 1 oft
Received Time Jul. 18. 2012 8:47AM No. 8793
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
O Sidewalk
ft wide
ft from back of curb
O Streetside Swale
O Drainage Ditch
O Drywell (show location on sketch)
O Other (please describe below)
[Li
CURB'
EDGE OF 1
ASPHALT
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
CONCRETE
APPROACH
/CURB
RETURN
4'-4. THROAT WIDTH [g --FT -�-4'
WING (SEE TABLE WING
c); „,t
STREET NAME
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
THROAT WIDTH i l FT --�
(SEE TABLE)
STREET NAME
IF CORNER LOT,
DISTANCE FROM
CURB RETURN
fire FT (SEE TABLE)
15 RADIUS RADIUS
RETURN
1
/-
NF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
0 FT (SEE TABLE)
STREET WITH ASPHALT EDGE
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Distance from Curb/Radius Return
Residential Approaches
Commercial Approaches
Separation between Approaches (measured
from centerline to centerline of each
approach)
Throat Width (flat portion)
Wing Width (at curb line)
15' minimum
None specified
75' minimum
See Page 7-27
in City Street Standards
16' min., 30' max.
Minimum Distance from Side Property Line
(@ r/w)
Minimum Distance from Crosswalk
4 feet typical
30' min., 40' max.
5.0'
4 feet typical
5'
5.0'
5'
..°9\e'
s11\bane
Valley
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter@spoka neva) ley.orq
(Staff Use Only)
PERMIT NUMBER:4PQ • iZ ' 3o
PERMIT FEE:
APPROACH PERMIT APPLICATION
PROJECT ADDRESS: 56( -Di 5 - = () i a, D
START DATE: C, / z_ ANTICIPATED COMPLETION DATE:
BUILDING OWNER NAME:
MAILING ADDRESS: 3 D % ) - L c:Dr Lfl- r
CITY: -7? y STATE:
ZIp: J� J� 2
CONTACT PERSON NAME: J
PHONE: c)
CONTRACTOR NAME:
FAX:
CELL: �'�cj —66o)
MAILING ADDRESS:
CITY:
STATE: ZIP:
PHONE:
FAX: CELL:
CONTRACTOR LICENSE No.:
EXPIRES: CITY BUSINESS LICENSE NO.:
PROJECT DESCRIPTION (Please Provide Site Sketch)
Residential Driveway ' Commercial/Industrial Driveway
Existing Curb & Gutter
I=1 Culvert Installation
0 Other Conditions:
Rural Road Section
0 Sidewalk Repair/Construction
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature Date:
Updated 1-11-11 Page 1 of 1
http://www. spoka nevalley. org/fi Iestorage/ 124/938/210/948/ 1496/Approach_Permit_1-11-11.doc
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
❑ Sidewalk
ft wide
ft from back of curb
❑ Streetside Swale
❑ Drainage Ditch
❑ Drywell (show location on sketch)
O Other (please describe below)
W
z'
a
Som
DISTANCE FROM
NEAREST PROPERTY LINE
MAYBE LEFT OR RIGHT SIDE)
MBE
(SEE TABLE)
CONCRETE
APPROACH
CURB
1
Lill
z,
a,I
W
of
a.i
I--4'4--THROATWIDTH =IFT---4'
WING (SEE TABLE) WING
STREET NAM E
STREET WITH CURB
DISTANCE FROM
- NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
\ 1
NIF CORNER LOT,
DISTANCE FROM
CURB RETURN
FT (SEE TABLE)
CURB
RETURN
15' RADIUS
RADIUS
RETURN
EDGE OF
ASPHALT
1—THROAT WIDTH n FT ----�
(SEE TABLE)
STREET NAME
STREET WITH ASPHALT EDGE
NIF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
0 FT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line
(@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'
S//a.-. /z•- 30