2004, 12-29 Permit: 04009526 Heat Pump, ACSpokane
valley
BUILDING DIVISION
11707 E Sprague Avenue Su1te 106
Spokane Valley, WA 99206
Site Information
Project Information
Site Address: 8719 E MAIN AVE
Parcel Number: 45184 1 1 19
Subdivision:
Block: Lot:
Zoning: UNK Unknown
Owner: RANSOM, RANDY
Address: 8719 E MAIN AVE
SPOKANE. WA 99212
Building Inspector-
Water Dist:
Project Number: 04009526 Inv: 1 Issue Date: 12/29/2004
Permit Use: HEAT PUMP/A/C 0-3 TON
Applicant: AIR CONTROL. HEATING
7293 E NORA AVE
SPOKANE, WA. 99212 Phone: (509)455-7700
Contact: AIR CONTROL HEATING
7293 E NORA AVE
SPOKANE, WA. 99212 Phone: (509)455-7700
Setbacks -Front: Left: Right: Rear:
Group Name:
Project Name:
Permits
Mechanical Permit
Contractor: AIR CONTROL IIEATING & A/C
License #: AIRCOHA051J6
IIEAT PUNIP OR A/C 0-3 TONS 1
FOR MECIIANICAI. INSPECTIONS CALL (509) 688-0054.
$12.00 PROCESSING FEE
Total Permit Fee:
S35.00
547.00
Payment Summary
Total Fees AmountPaid AmountOwinp
$47 00 $47.00 $0 00
Tran Date
12/29/2004
Processed By:
Printed By: MIKETURI3AK Page I of 1
Receipt # Payment Amt
6212 $47.00
PERMIT
NOTICE
A Spokane Valley Development Permit belongs to the land owner. The permit applicant, by definition, is the property owner or an authorized agent of the
property owner. It is the responsibility of the permit owner that the use described on the front of this permit complies with applicable codes and that
required inspections are requested. Faiture to request inspections as listed tel'ow anti obtain the necessary approvals before progressing beyond the
point where inspections are required may necessitate removal of certain parts of the construction at the permit owner's expense At a minimum, the
following inspections ARE REQUIRED by City Code:
FOOTING - when forms and reinforcement are in place and prior 10 placement of concrete -all structures, including manufactured homes.
NOTE. This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley
Ordinance Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the
venfication or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may
require its relocation at the owner's/permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
SUB SLAB/RADON SYSTEM/ PLUMBING - after rough -in with appropnate test and before covering.
MECHANICAL - rough -in of piping (with test), before covering, metal chimneys before concealment, and final.
PLUMBING - ROUGH IN - when supply and drain piping have been installed, before concealment and with appropriate test.
FRAMING - after all framing, bracing and blocking is in place. rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
INSULATION - pnor to the installation of drywall. •
FINAL - when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permiL Items such as the installation of fire hydrants, fire department access, on-site
drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed
pnor to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy, completed
inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete. etc. must be
inspected prior to cover. Check with the Building department for -special Inspections' in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
• Building, plumbing (includes interior reversals for sewer) and
Mechanical, City of Spokane Valley Building Division
688-0054
• Permits and inspections for electrical wiring, State Department
of Labor and Industries 324-2640
• Permits and inspections for on-site septic systems. Spokane
Regional Health District 324-1550
• Road cuts for utilities or driveways, City of Spokane Valley
Public Works 869-5373 or State Department of Transportation
324-6000
• Permits and inspections for sewer connection, Spokane County
Utilities Division 477-3604
• Fire Sprinkler and alarrn systems and private access road
Inspecbon, Spokane Valley Fire District 928-1700
State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call before you dig at least 2
working days in advance, 456-8000.
FLOODPLAIN DEVELOPMENT. All Development within a designated floodplain located in the City of Spokane Valley junsdiction shall comply with
Article III of the Spokane Valley Uniform Development Code.
PERMIT FEES, EXPIRATION AND REFUNDS
All City of Spokane Valley permit fees shall be established by a City of Spokane Valley Resolution and may be found in Appendix B, Schedule C of the
Spokane Valley Uniform Development Code. Copies of these documents can be obtained on the Citys website (www.spokanevalley org) or within the
City of Spokane Valley's Permit Center.
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180
days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished If a permit is
expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment.
1 00 % refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work
has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or
cancelled prior to the plan review being completed.
REFERENCED CODES AND APPEALS
All referenced construction codes are available for review at the City of Spokane Valley Permit Center. Compliance with construction codes is mandated
in the City of Spokane Valley. Any questions, disagreements or disputes generated as a result of city staff decisions shall be directed to the City Building
Official If the issue remains unresolved, further appeal shall be in compliance with the City of Spokane Valley Uniform Development Code Section
1.20 39.B.