Loading...
2015, 06-02 Permit App: APR-2015-0058 Approach.0001/211ey Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-5240 Fax: (509) 688-0037 permitcenter a spokaneval ley.org (Staff Use Only) PERMIT NUMBER: PERMIT FEE: APPROACH PERMIT APPLICATION 1 PROJECT ADDRESS: X0913 £ /Y44.14/ /4-V START DATE:. ANTICIPATED COMPLETION DATE: BUILDING OWNER NAME: ,L-12-4fI,)1—,q-0� MAILING ADDRESS: CITY: STATE: ZIP: CONTACT PERSON NANIE: PHONE: FAX: CELL: CONTRACTOR NAME: `rRNLt. £xGLg51VC {—t orn.t bagsc, j MAILING ADDRESS: 2-1/3// AJ 44Iu'I 39S on: C_c Ls s SIA E: Wp' ZIP: PIONS: Soq-1:M3 - 986 S FAX: - - - - - - CELL: CONTRACTOR LICENSE:#: Sk$14,4 IJbQQky/ EXPIRES: CITY BUSINESS LICENSE #: Residential Driveway ❑ Existing Curb & Gutter ❑ Culvert Installation ❑ Other Conditions: PROJECT DESCRIPTION (Please Provide Site Sketch) O Commercial/Industrial Driveway ❑ Rural Road Section ❑ Sidewalk Repair/Construction Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. - - Signature Date: DE -001: V -I FiEULZIVED CSV PERMIT CENTER JUN 0 2 2015 Project # 4R -70C- 0051 Name 7, Submitta' # Page 1 of 2 APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION Provide required measurements (in sketch boxes). and include street name. Check all existing conditions that apply: ❑Sidewalk ft wide ft from back of curb ❑Streetside Swale ❑Drainage Ditch ❑Drywell (show location on sketch) DOther (please describe below) CURBWING (SEE DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) 3' V CONCRETE APPROACH '4—TH OATTABLE) ia FT WING STREET NAME CURB RETURN STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT FROM RETURN SEE TABLE) 15 RADIUS EDGE OF ASPHALT THROAT WIDTH nFT ---1 (SEE TABLE) STREET NAME STREET WITH ASPHALT EDGE RADIUS RETURN \IF CORNER LOT, DISTANCE FROM RADIUS RETURN =FT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage, one on arterials • Total width of approaches not to exceed 50% of frontage width DE -00I: V-1 Page 2of2 Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min , 30' max 30' min., 40' max. Wing Width (at curb line) 4 feet tvpical 4 feet typical Minimum Distance from Side Property Line (n, r/w) 5 0' 5 0' Minimum Distance from Crosswalk 5' 5' DE -00I: V-1 Page 2of2