2015, 06-02 Permit App: APR-2015-0058 Approach.0001/211ey
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-5240
Fax: (509) 688-0037
permitcenter a spokaneval ley.org
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
APPROACH PERMIT APPLICATION
1
PROJECT ADDRESS: X0913 £ /Y44.14/ /4-V
START DATE:. ANTICIPATED COMPLETION DATE:
BUILDING OWNER NAME: ,L-12-4fI,)1—,q-0�
MAILING ADDRESS:
CITY:
STATE: ZIP:
CONTACT PERSON NANIE:
PHONE:
FAX: CELL:
CONTRACTOR NAME: `rRNLt. £xGLg51VC {—t orn.t bagsc, j
MAILING ADDRESS:
2-1/3// AJ 44Iu'I 39S
on: C_c Ls s
SIA E:
Wp'
ZIP:
PIONS: Soq-1:M3 - 986 S
FAX: - - - - - - CELL:
CONTRACTOR LICENSE:#: Sk$14,4 IJbQQky/ EXPIRES:
CITY BUSINESS LICENSE #:
Residential Driveway
❑ Existing Curb & Gutter
❑ Culvert Installation
❑ Other Conditions:
PROJECT DESCRIPTION (Please Provide Site Sketch)
O Commercial/Industrial Driveway
❑ Rural Road Section
❑ Sidewalk Repair/Construction
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved
before this application can be processed. - -
Signature
Date:
DE -001: V -I
FiEULZIVED
CSV PERMIT CENTER
JUN 0 2 2015
Project # 4R -70C- 0051
Name 7,
Submitta' #
Page 1 of 2
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION
Provide required measurements (in sketch boxes). and include street name.
Check all existing conditions that apply:
❑Sidewalk
ft wide
ft from back of curb
❑Streetside Swale
❑Drainage Ditch
❑Drywell (show location on sketch)
DOther (please describe below)
CURBWING (SEE
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
3'
V
CONCRETE
APPROACH
'4—TH OATTABLE) ia FT WING
STREET NAME
CURB
RETURN
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
FROM
RETURN
SEE TABLE)
15 RADIUS
EDGE OF
ASPHALT
THROAT WIDTH nFT ---1
(SEE TABLE)
STREET NAME
STREET WITH ASPHALT EDGE
RADIUS
RETURN
\IF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
=FT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage, one on arterials
• Total width of approaches not to exceed 50% of frontage width
DE -00I: V-1
Page 2of2
Residential Approaches
Commercial
Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured from centerline to centerline of
each approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min , 30' max
30' min., 40' max.
Wing Width (at curb line)
4 feet tvpical
4 feet typical
Minimum Distance from Side Property Line (n, r/w)
5 0'
5 0'
Minimum Distance from Crosswalk
5'
5'
DE -00I: V-1
Page 2of2