Loading...
2014, 11-13 Permit: SW-14001660 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14001660 Permit Issued Date: 11/13/2014 Expiration Date: 11/13/2015 Project Description: SEWER CONNECTION Project Name: E SPRAGUE Primary Contact: J R M EXCLUSIVE HOME DESIGN Phone: 253-255-2248 Applicant: J R M EXCLUSIVE HOME DESIGN Address: 24311 N 395 HWY COLBERT, WA 99005 Phone: 253-255-2248 Email: SITE INFORMATION: Site Address: 10923 E MAIN AVE Owner: REINER, DANIELLE Parcel Number: 45163.0422 Address: 10923 E MAIN AVE SPOKANE, WA 99206-7217 Phone: Assessor's Description: OPPORTUNITY PT OF B131 BEG 480.97E7 S Email: &336.65FT W OF NE COR TH W PAR WITH N LN 105E7 TH S146.85FT M/L TO PT 15FT N OF SL TH E105FT TH N TO POB Inspection Area: : (509)477-3675 Water District: Modern Electric Water Fire District: Spokane Valley Fire Company Zoning: Land Area: 15419 Square Feet CONTRACTOR INFORMATION: JRMEXHD055KN, Exp. 12/04/2014 J R M EXCLUSIVE HOME DESIGN 24311 N 395 HWY COLBERT, WA 99005 253-255-2248 DETAILS: Class Type Quantity Unit Charge Value SEWER ALTERATION TO EXISTING 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 11/13/2014 12:28:40 Project Coordinator Julie Shatto SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14001660 Permit Issued Date: 11/13/2014 Expiration Date: 11/13/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19 122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed /13/2014 12:28 40 Project Coordinator: Julie Shatto