Loading...
2009, 03-03 Permit App: 09000523 ResidenceSpokane jValley- Community Development Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spoka_ ne lev.aim. _: 13Y 4 vAl-LEY PERMIT NUMBER: PERMIT FEE: Residential Constructiolf" JNew Construction MAR 0 3 � emodel Permit Application G14A ion/R SITE ADDRESS: ❑ Accessory Bldg ❑ Deck ASSESSORS PARCEL NO: 5-51 q3 ICIZu LEGAL DESCRIPTION: i SUU(6. UyWi- Building Owner: Name: Address`. h City: State: w-6- Zip: (O Phone: u� Fax: Contact Person Name: Phone: ZZ6 —9115 Describe.the SCODe.of work iii, detail: Proposed Use: Contractor: Name: Address: City: State: Zip: Phone: Fax: Contractor Lic No: Exp Date: City Business Lic. No: Cgst of Project: $®0 **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES- TOTAL HABIT LE SPAC 1S. , MAIN FLOOR TO SIDr{ FTG: D11"I FLOOR SQ. FTG: 14 UNFIN BASE, ENT SQ. FTG: y IM RVIOU SURFACE A) EA: FINISH12D B S ENT GARAGE SQ. FTG: DECK/CO ATIO SQ. FTG: 30% SLOPES O SQ. FTG:PROPERTY: # OF EDROO T/ C044STR TION E:� Rk HEATS RCE• SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE:l�!/�•n /� 11 '6J DATE:- - 7,7'-5q Method of Payment: ❑ Cash Check ❑ Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 2/115/07 RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN .Property lines and dimensions ".Direction arrow pointing North and orientation to streets *Proposed/existing buildings (footprint and dimensions) Utilities, septic tank/drain field locations and distances - Setbacks to property lines Distance between buildings Right of way/easement location & sizes Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations o Handrail / Guard height & spacing Site Address: 19305 E MAIN AVE Parcel Number: 55173.1424 Zoning: R-3 Fire District: FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Newproject 0 Previous pre -app meeting 0 Plan revisions 0 Transmittal Date: Wednesday, March 04, 2009 Project Number: 09000523 Water District: CONSOLIDATED ID #19 Applicant: WEED, JERRY R 19305 E MAIN AVE SPOKANE VALLEY, WA 99016-860 (509) 220-9315 e-mail: Contact: WEED, JERRY R 19305 E MAIN AVE SPOKANE VALLEY, WA 99016-860 (509) 220-9315 e-mail: Contractor: OWNER ( ) - 0 Project RESIDENTIAL ADDITION 24 X 42 Description: Owner: WEED, JERRY R 19305 E MAIN AVE SPOKANE VALLEY, WA 99016-860 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: Please send all plan review and project comments via e-mail to the highlighted individuals. Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION I CONSTRUCTION PLAN i SITE PLA Z I l• r TD Please send all plan review and project comments via e-mail to the highlighted individuals. For City Use Only PLUS Project Number - `-7,;).3 SPCITY OF Project Address /93u''— � �l 1) 1") oKane alleVy 11703 E Sprague Ave Suite B-3 ♦Spokane Valley WA 99206 49;000 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is I i(_)�� l The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us ifyou haven't heardfrom us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 FOUNDATION PLAN PLEASE COMPLETE THE FOL/LOW114G INFORMATION AND ADD ON THE DRAWING BELOW. BUILDING DIMENSIONS: �(!� + 1C �'it``-V4J 1� PENING AND HEADER SIZE: � I Z 7�GAM INDICATE THE LOCATION AND SIZE OF ALL WINDOWS AND DOORS ON THE PLAN. RIME L. F-1 I � � WIDTH I tb' ( I I I { I i Please note that white every effort is made to assure the accuracy of the information contained in this brochure is not warranted for accuracy. This document is not intended to address all aspects or regulatory requirements for a projed and should serve as a starting point for your investigation. For detailed information on a particular project, permit, or code requirement refer directly to applicable file and/or codelregulatory documents or contact the appropriate division. Lrry Ut SPOKANE VALLEY BUILDING DEPARTMENT 11707 E. Sprague Avenue #105, Spokane Valley, Washington 49206 - Tel 509-658-0035 - Fax 5D9-5BS-0037 Following is a typical cross-section for a residenlat garage. It may not represent the proposed project if you are using this detach as a porion of your plan subrnittet, please complete the requested infom a5on in the boxes provided on both sides of tiffs sheet This completed sheet, along with any additioral information needs to be submitted with your apifica5on and be on site at the fime of it spection. PROTECTION AND OPENINGS BETWEEN DWELLINGS AND PRIVATE GARAGES SHALL HAVE: 1) MATERIALS APPROVED FOR ONE HOUR FIRE RESISTIVE CONSTRUCTION ON THE GARAGE SIDE: • 518" TYPE 7C GYP BOARD (HABITABLE SPACE ABOVE) • yr GYP BOARD (RESIDENCE/AMC, FLOOR/CEILING) 2) OPENINGS BETWEEN GARAGE AND RESIDENCE SHALL BE EQUIPPED WITH SOLID WOOD DOOR, SOLID OR HONEYCOMB CORE STEEL DOORS NOT LESS THAN 1 318', OR 20 MINUTE FIRE RATED DOORS. ALTERNATE FOUNDATION FOR ACCESSORY BUILDINGS FROM • 400 SQ. FT. TO 3000 SQ. FT. SECTION A -A NOTE~ Diagonal wall bracing required on each corner and every 25 feet of waL. Walls within 3 feet of a property fine or within 6 feet of a dwelling must be 1 hour rated. (5B• type x gypsum sheathing on both sides of wad). Openings are not permitted in these walls. Garages over 3,000 sq. ft. require protec5on when loser than 20 feet to the property fine. Parapets may be required. ENGINEERED TRUSS OR RAFTER SIZE AND SPACING x @ O.C. ROOFING MATERIAL. ROOFING PAPER ROOF SHEATHING SOLID BLOCKING BETWEEN.TRUSSES WALL SHEATHING SIDING I 6' MIN. DOUBLE TOP PLATE WALL HEIGHT i 24" MIN. I @ O.C. PRESSURE TREATED SOLE PLATE 3-12" CONCRETE SLAB 6"MIN. :. • 5"x12" FOOTING ANCHOR BOLTS 12'x9' MIN. (7' INTO CONCRETE) 6' O. C. OR APPROVED ANCHOR INSTALLED PER MANUFACTURER. I Kr 193c,5 E. (naio r Id vi 19 (A !A I �r CJS% � ZXi 1 9 � w r CS t-4. "n 6!6 i� Y Vu i 4,Ah a1 EM M X 4) CA� a Wit ; 4Y (W.W �- F--- I X" —f ?,Yl (I )c 160110-L Y peoll 6fcj w,, O Z yo? ((Otto,(-. open e= kn4ra KW (o P.44djw wit e 1161, * 9" ,�rA *� . CIO G: 64w+ bd..M m 6 caWuwu „y � �10 �4 Iu .�M+M1n nb dvLv n��q �,rh� .r..--- Com'' f. / � 4 �o ell Fay Llw , vn PAY 4tf 4,- 4,,(n S 3.y" a7 f4lql 1<I'LA) ICU -e-f-q *xi..,< ") 1 0 e- F--- t X" ---4 7,Y,9 x 140"o -C 40 &4�3 t� Y 1 -toll 6fa kL�hf kq z G 1 � C�4 (0 « U440 FCAAdAJ1n U04it e i CA u t 1 i t 1 t i AcU-+iop I 1 C�u�nd�w 'q!) ne 41 ley Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Newproject F] Prezious pre -app meeting E] Plan resisions Trans mittal Date: Wednesday, March 04, 2009 Site Address: 19305 E MAIN AVE ✓ Project Number: 09000523 Parcel Number. 55173.1424 ✓ Zoning: R-3 �/ Water District: CONSOLIDATED ID #19 Fire District: FD 01 � v LG �ipior Sig' via.+" Gi r$at Applicant: WEED, JERRY R 19305 E MAIN AVE SPOKANE VALLEY, WA 99016-860 (509) 220-9315 e-mail: Contact: WEED, JERRY R 19305 E MAIN AVE SPOKANE VALLEY, WA 99016-860 (509) 220-9315 e-mail: Contractor. OWNER ( ) - 0 Project RESIDENTIAL ADDITION 24 X 42 Description: Owner. WEED, JERRY R 19305 E MAIN AVE SPOKANE VALLEY, WA 99016-860 e-mail: Occupant: e-mail: Arch / Engineer. e-mail: Please send all plan review and project comments via e-mail to the highlighted individuals. Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION CONSTRUCTION PLAN SITE PLAIN TD 1 Please send all plan review and project comments via e-mail to the highlighted individuals. Alk Permit Center PERMIT AMBER: 11703 E Sprague Ave, Suite B-3 Sparr"n6@ a Spokane Valley, WA 99206 PERMIT FEE: V`%IeY (509)688-0036 FAX: (509)688-0037 ) �^V� 3 NN,ww spokanevalley.orc-+wt •!'[) 13Y4d;00 ' � � Community Development � E 14ALLEY Residential Constructio>fl" MAR p 3 New Construction ❑ Accessory Bldg Permit Application ddition/Remodel El Deck SITE ADDRESS: ASSESSORS PARCEL NO: Wit' �) LEGAL DESCRIPTION tSChrtS\4.t_y Contact Person " Name: Phone: Z 7111 — 5' Describe.tbe scope,of work iijoetail: Proposed Use: MR Name: Address: City: State: Zip: Phone: Fax: Contractor Lic No: Exp Date: City Business Lic. No: Cast of P. roject: $ (�� i /., wArWrc.rr L.. N/A if nn1- �t►nlirahlPl�t �Y*�:*oY kik �t*9: 4c �c �c 9: �: *�F �': 9c 9:* •• •• •• •• •• - - . - ._. __ -- - 1 uC iV11V HEIGHT TO PEAK: 1Ll 111V IJ 1 v... ..vasa DI E_NtSIONS: ' # OF STORIES' TOTAL HABIT LE. SPAC ' MAIN FLOOR TO SQ. FLOOR SQ. FTG: UNFIN BASE, ENT SQ. FTG: IM ERVIOU SURFACE FTG: f `�_ ,� AEA: 17( FINISH D B S ENT GARAGE SQ. FTG: DECK/CO ATIO SQ. FTG: 30% SLOPES O SQ. FTG: PROPERTY: #05 EDROO / CO�NS,TR TION TAPE: HEATS RCE SE E OR SE TIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. c� l �t? - I SIGNATURE: DATE: � Y" „ Method of Payment. ❑ CashCheck F]Mastercard E]VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 2/15/07 {� CITY OF p sI ne ,,;oOValle ° Y For City Use, Only PLUS Project Number - 7 Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevatley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Prosect Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9107 �3 e--fTw N. f------4,Ah EMM LMM �--- I X" ---f ZX (I x Y EzoU l Lid k4f Z Al IG" ©.c. R.t�i (kw ill �r lick lV 0 n�iI O"hi 4I. 3S ° T"I ase 171a4�'t T APPROVED BY �� - (}sSc�U �►hr �43ta� E. Ila�n S+. 9p1(0 61.; Addz+ioo 118 �. APPROVED BY aot moi C. fnain �+. 1CQ 4 Addz+ioo 118 �. APPROVED BY aot moi C. fnain �+. 1CQ qof o f .50 N 15800 14 /3.78' 00 4 14 8sa 7� tv T r �z4'1 O� 37 2° 3z /40e 7 C4 -"-e 6 -� .� K •� 5 4s 80,40'pIV _ b ,2! � 0 ° �� , x.40' � � I 8a • ,. � ,2I. N Co 2 of fhe SouH7¢ carrier of sato' Scc>�on /7 strict comer /yrny on the cen7'er litre �r�Tersc9c>•ion Of' Spra9cre Avenue trod /�/od9es Poad; fh�ioce N �D 44 "/,/ 4/0.9 the canter• litre of //ody cs Po a d a ois/ar7ce of 3o Do feet fo the exterided i7orth /rne of Sprca9cte AvCrru� ; t/iertcc IV 67'-T-4" /�/ 4/orr9 fhe north //r7c of Avenue, said A -7c /eirry fhe south /erne of .8/ock 20, Carbr%7s Add tion to Gree rczcre•s" a oist4rce o{ 56/. 73 feef fo /Lie >`iuepornf of be9rrir..n9. Thencecontir�u.r�9 /{/ 89 S ¢ lz/ a/o"y the r�or fh /ir�� of Sprazycre A✓e . and >`he so cirf� /irie of sct.d Bock ZO cr <7'15co,7cc of /4/734 feel /o cz Po�.�t said,00irrt being the soufir-gest corner of Lof // of said B/oc ZO; therJce N0-44'd✓a/o.�wa cisan9itdce of 98/.00 {ect' /"o a pDtf'7,' ; thence N 77' /6'E a dis/ance of 664: /Z Ace/ 1'o apo.irf a. the c�ester/y line of Lot 4 of said B/oek 20,; thence /t/0'44 Al cr/on9 the a./es/ei%f. /irre of sai4 Lot 4 ci �istarrce of /67.6Z Acct >`o fhe center line of ✓�rca>`cd VIWIey L✓arcJ; fheirce 5 89 S4 E a/01-79 the center /erre We ✓trcartb' ✓alley /✓qty cl di5farrce of 4177 of h�od9es 426ctor; >`her,ce 50'44'-' a/orry fhe CCe7I er- /irie- oYC //oo9es "Food a �a tirr7ce of 796.00 feef /o a Poiret; Thence A/89 `S4 'G✓ a distance of 56/. 73 7 `Ct tb a Poir.f; 117er7ce S O-44 'E 4 o.s for ce of Soo. 00 feet fo the trek /ooir,t of ;=they use freer Me sfr eets shover, o.� thrs maP trot o/rPcrory dedi�leftq! Also ern 8 feef c�.de c'trsemer�f rs reser✓eor for uti/sties or. the rear of a// /ots� foc�efher[�..fi7 a like Cr>ti/! fy' ease.nI�7el77` o/anq fhe NorfhB�' o/'Lof 1'1,61,k I. fhe Wcsf 8 feefof Lof /5 and the �o3fBfcc� f Lof /6 B/k 2" fhe EC7s7' 61&? -o! Lof3 ,3� 2¢, rhe,toouth Z(:)&"V f- offhc McS f'B feel` oft Lo74 9 qu o/ fhe .S�ufLi --07t-c7 Poi 7 ke Eosf' f2e7`of Lo� /0 8/k,3 -07c�crs f 8 fief of �of.3, fhe.5o074b 2e fee 7' of fhe DVeSf 8 fee•7`of' Lo7`B, fhe-So ufh ZO -/� e�o-P fhe 1�nsf 8 7cec74of Lot 9 fhe h/es7-8 f'ee7` of Lof //, fhe E-asf 8 feef- fhe 2fas f Zo fCCf of /hesou*8-*cf-Lo+ /Z) #leZUS7420fbetof f�e Nor/G7 8fkef'of Lof' 13, l¢, fhe Eos7`arid trot /h2cns�`8y"eefof' Lot /7, fhe North 8 def of Lof /8, fhe SoufhB f�e1`of Lac /y, Mc5ou�h 8 fief of Lof Zo, fhe WcsI (3 /;i 'e7` 2/, /he Eiosf 8 7CC/- of Lot 24 Q, -rd fhe WestBfee'`' of Lof 25 31k 4- fhe sous hrye.s�z 8 C- f07' L.o f 6� fhe vle�rfhec7s7�8 f f of Lof �, fhe W¢s7�Bfeef of Lof-9, =he NC;, 720 f'eCfof'fhe Eusf 8 74 0,1 /_,o 11 13 arc( fhc Not d, -:;n fee f' of fhe Wes f C fee' of Lo t 14 S/K G • fh¢ H7s> 8 A -f of Lo t3 and the h/es f 8 t�-,cf o79 Lo �S B/K7an4/-,AAc of'Lofs3<'2.b'Qnd 4ie Ws74,574r 4of Lofs12eIG B/ka. A/so, ,ch/erline1 overhar7c> 20 on / easem.er"� over orrd ae/vss �h¢ soc.fh•rr%o/ Side o/ LofneL nor-lherl� �/des of LO/_5 2/(� 22 f7//< o77d c7cr•oss -111C.soe.•4Ghecas7L-rh," Corr/, -n- of 4-0f 13 ($ 1170 hor44C?Sf - er/y/No /of or /c4's shale sa/cr' � 4his�svbdiv�io r/U/-Til dom¢sf/c Wader' is mGd¢ 4vai /47h/C fa sard /of o -/off . //Y WI TN E:0 -5W HEr2E O � ,he 57/c/ ec,r ra-f7or7 has cvusec� fhQ t7arn¢S of /74s o7flcers or/d /fs of'f'/c /a// ib fr o/'f'iX�q/ �v. fLi/s 2Gf'r dc7t� of�__ /955. 6r��ht7c /hves1�-rier/fs� /hc . N 89'S� csmnln ,J ACKNOWLEDGEMENT STATE OF WASHINGTON) On this AL:day of 4✓Lt1959, b¢iar¢ rhe persona/1y I -d- - COUNTY OF SPOKANE J -SS ogo¢�rad Wa/air Carsfsns and Maryoraf P. Carrf¢ns, - husband and wi f¢ to nae known to be the idenhca/ pennons r,ho ax¢cuted tha inzl 5(/menf show', heron and acknowledgm' it b¢ ffia�r frcz and vo/anthry acf for the uses and purpos¢s hpr¢in m¢ntion¢d -ss• ZNW/TNESS WHEREOF, I have s¢tmy hand and affixed my officio/ sea/ Me day and year abov¢ Wntt¢n. 43 - My comm/slam ar'i'as Tnc 2, /962 =- Not ry P0b/ic /n and or'he Sta t¢o _ - 7i�7Xeli&i /� Washington rvsidmy at Spokane. OED/CAT/ON KNOW ALL MEN BY THESE PRESENTS, fhof Walter Carsfens orad MargarafPCaratanq husband and w7fe and Gu/hrie /nresrmnrs ,/ c , a co porat,on olyar, zu�r under and 'N" Arta¢ of Me / ws of the St-te of i-bshrragto-�, have 'lolled info /or, 6/ocE•s, and s•/ eel`s fhe /and shown Pan this n-zrp, to be .f'nar i as GC/TN.P/ES !/f,`LLEY Y/EW S -.4Z7,01 7-101V berg a rep/af of part of Block ZO, Corbin's Aaid flan fo Sreenacres s1>++afed l%a fhe SZ 3k/4 SerJren 17, T1SN, .245E arxf .Wore part..=u/ / dvcr.bed as fa/lows Beyriinlrg of fhe south L caner of sore' Sco>�on /7 sand come /ying on Ah. center Ane ''stens eflon of Sp Avenue nd Hodges ad; thence N'O 44'!✓�o/any fhe cen/erAn' o' Nodyes ad a ds"ance of 3a 00 feet to Ah' extended north Ane of Sp'eaycre Avenue; "hence N 89'x'4-{,/ along the nor/fi AnSpgue nue, sgrd /- bevy M.south Ane of Block ZO, Corb:ns Ado.tion t Grecnaues, a Z= Z' 56/.73 A:ef na /fie truepornt of bcgrnnrr7y, The- onhnurn9 rV s9 -54'W a/cry fhe nw•fh Ane of.ff c /•'✓e. and the Beck 20 o d >o.,ca a' 1417.34 ' feet A. a por�af, sa.d pornf be Me south -,..cat corner o/' Lor r/ of sand el -k z0; "hence 'vo44'/✓-/o"� fhe west /1n< o 1 Lor N-radLof- 6 of ­1H� ck 20 - drsrblace of 98L 0 0 feet to a poria'; thence N77' /G'E a drshance of GG4: /2 Acct/Acct/I- cct fa aporiit ora rhe 4lesfcr/y Ax of Lo" 4 ¢'sand Bleck 20; •hence rV0'44'W o/any the � rly Ane of sore Lot 4 a � l nce of /47.42 Acer "o Me renter Ane of ✓ <afcd IEr/ley way; ffrrnce 5 89'S4E -/.,_g the ¢enter Ane -1 r, -2W Va/ley !✓ay a est nce of 1329. 37 feet fa u perm' -n /h a cent r /rheof Hodges .toad; All- .50 .44'16 fhe cent Ane of Nadycs e ad a valance of 79Goo feet r'a - porn f; thence NB9'S4'F/a eat nee of 56173 feet to a po:'at; /hence .3 0'4416 a drs /once a{ soo.ao feet to rhe t e porr,t of rind "hey do dee cafe to pub/rc use ,breve' the sfrecr show.. en "A'- soca,. not i eady devica,rd. A/sa on 8 feet verde eosenenf s reserved A- utrlr•,es dl "fie neer of a1i /off 'fegefher wr,"h o h'kc ufi/1 fN cown`/ meo/onq fhe Nfh orC� f•Lo/'1 B/k /. Me hks�8 hectof Lot/5 and the EosfBfte.' Int/6a/k 2; theEeafBfbrtof Loft 3¢24 rhe,Guth 207%cfofthe keStBfeetoftot9andfheSauf/a za7fs•e7poftheEosf$ Per}ofLo//oB/k3• fhcEasteft<toflof.3 >`he.su/h7l�fectof �heWesfBfec•t�'LoY�9, fhcxufhza�/-Of the F�s'te feeoP'Lot 9r -/he AiI 2LB Pect of Lit //, fhe Eosf o f -7'4f 4 Fhe 2vs Zo fee% oP lhe.soullr s /ler t[n t + !Z fhe East zo fl�etof fire Korff, BfketoPLot/3a fhe Saufh BflZetof Lof/s, fhe Eostond norfheasfBfLrfofL Lo�/7afhcNorfhaf�etaflot /B,thcsoufh6f7retoflot /9afhe.5ou><hBfFxtoiL.fzo /heWeSt6ikc OP•(A/ 2/, fhe 6oaf 8 feet of Lot 24 and fhe Wcste fee:` of Lot- 25 6/k4 • fhe xu/h Wc-af B fief of Go f 6, fhe norfheosfB fL•Irt oPLot7, fhe W¢s71B£cet ofLofq, fhe North �2o feet'oPfhc Eosf•B/be ofL.1'C 1 fhe Nor f/7 c -n feet of fhe W¢s f B fact of to t /4 B/k 6 • th¢ crJsf 8 fdzf of Lata and the Wes f e flet 07"L. -'s %�i // B/k 7 and /fie Eos f'8 fiaef oP Lots 3�' 2.6 and fhe L✓cst8 f@ef of Lots 12 l6 B/K8. A/so o fzwxf 1117¢ ovefl7any eosetn¢n:''over and oc{-ass fh¢ south'.'/y side of ! o -fhco5 narfher/:( sides of Lots z/d 2z li/k¢ond ocro3s rfFie xc-N7e4sfer/u corner•oP Lots- fha rlorf4egsf- cr/ycorneroPLofLSLi/k 7.o//c/ocnfazdandEvi!/f: No /e•f or/ofs shall bz se/d /n Phis Subdiv/s/ory ul7frl dom¢5/fc Wafer' Is tr/Od¢ ovoilob/¢ 7/0 soli' /of or/o7 /N W/TN 235 WHEREOF fhe soidaarccfvfion has mused fhe nam¢S of/fs of'flcc13 ond/�S plot'/c/O/saw/7'a b_- _AO,Xe01 nn fh/•s o'�2WYL 55. /� _,..... &Jlhr7�-- /n vc SAI"CMs, /HC 217 - Al .4CKNOWLE049E/yENT ST19TE OF klg51/AVG710N)55 CO UNT Y - f SPO n Oth1s.?(,� -day o /955, before me pe sono//y Ppearcd � /ph D. Guthrie and h/ yne E Gufhne fo -Lr/a- to Me President -.1 ,he secreta y_ 7"asur<r o{ Gr three /n veal eats /nc, a rnrpara>ron that crecuted the w,M- and .6regorr9 lnslrula.e nt vend acknew/¢dyed omen oaari aYav Me sa,d lnsA--'nt was the fee and ✓o/ nt ry pet and deed of so.d ca per -t on ter the use¢ and pu �sos herein inenhoned orad on -o li st fe "!+a" They wart -eA--e r ¢'¢cure the 1n•7hunx'it and that fhe see/ affxed 1s the corporate sea/ of fhe o6o.-e n.irnhoned en r,'on. /N W/TNESS WHE.eEOF, /hare here unfa "t -Y hand and -'fired mc/ ./frena/ sea/ the --y o xl year fir-sf above writ/ n. My cominiss,on erprres - "� No/ary b/e in a 1.$r the"r o ehrnyton resrdrny or ipok-n .rbshrnyfen ENG/NEE�ES CERT/f/GATE /, Chester ✓. AdamJ a licensed Cr v,/ Enyrneer and Land Surveyor do hereby cert'AJ. "1»f fhe maop shown hereon was prepared by me subsequent ro un aef a/ surrey pen rhe ground h September 1965, that /h< Same conforms 1nu//rrspeefe to theprorisrons of th�naxes of Spokane County mar., in effect and 'hat a// lot Borne a -nd monu..,� ars ha.�d' been ser Cheater Y. Adana E e� r� Sure r ACKNOWLEOGEMENT STATE OF Nr'7SH/NG7bN)Ss COUNTY OF SPO.CraINE f 1/%j Subscribed vend swornQ�a; rc a "his �d y of /9SS ?4Y AnA// ., FINAL PLAT GUTHRIE`S VALLEY VIEW 5''" ADDITION pdmSEg.nee�y .Pegrlfered Rwfessrona/ Ei,ginews S ok ne, Washrn ton SPOKANE COUNTY, WASHINGTON z3.=/A/c; A REPL AT OF PA/2T OF BLOCK 20, CO�BI/V ADD/T/ON TO G,PEEA1,gc eES; ; P;n A PAST OF S- S W4 SEC. /7, T eS N, )e45 E. W. M. er NO 44'W98/ 00 N 98092 W ?S4 A177 "C'44-12 664-12 N 14638 E 64779 No44i✓ 16762 N /676/ W 2.15 S89'S4'E 132937 0 233 --132937 5 0'44'E 796.00 5 775.94 E /0/8 ,V89'54W 661.73 N 098 W 56/.73 O' 44 a ,70 ' 500.00 S ON..94 E 640 1V 89'64 N1 /4/7. s4 Al 248 W 141734 — - — - - - —' N 129'&.37 E /99374 - — - --1 S /798 Z3 W /993_78 �Oa ti /8 /9 o Z/ 22 23 I o o 14 .3 n� 1z tl Q 0 25 1 W• t BO' ' I I 1 23 124 25 /9 ZO SWcer Found man pipe /3 Scale /11/00' o Ppe-Co'ne's O F -t � Nen, M nuanenfs 0 1 Bo 446' y I /aaz9• ' o- f 9 � _e. .•'� all 1zo• e- -. � .i•--- - 9 ` 90' I lr' � dp e�S s � — - — - - - —' - — - --1 0 2 0 120' ti /8 /9 o Z/ 22 23 I o o 14 .3 n� 1z tl Q 0 25 1 W• t BO' ' I .7/' 9rJ' 00' - So M1 � y I .4°06 _e. .•'� I e- -. I .i•--- - 9a• -.Sao-AVENUE ` 90' I lr' � dp e�S ' 3 � S ;�I� � f I0 5 14 .3 n� 1z tl Q W• 1 23 124 25 R CD g -- � 8S• _5797" ��}' •IBo' �" 300' 1411- 41731417.34' 1-17. e.' —7;4---------- �• ---��. AVENUE -113' _ --- COUNTY TR�E4SURER COUNTY COMM/SS/QNERS /, Nkrta L Howard , '7reasurer of Spokane CbL-21y, A iulhh-7 "Qn do hereby certify that Th1s p/ " was approved ,�,,d��.ggccepted b fh County Commission¢ s o,e Spo.tnne tares which have been levied and become chafyeab/e ayarnst /he /and shown on County, 1✓-af7rnyton /his �eZ day of S9. "his map and describedrn the '0"¢90',9 of�cah tu7 of "tars d /e hove been fu//y pard ,Jatisfieu' an7 � schoryed_ --