Loading...
2012, 07-25 Permit: SW-12001832 SewerSPOKANE COUNTY BOLDING AND PLANNING PERMIT Application Number: SW -12001832 Permit Issued Date: 07/25/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION 09004357 SEWER Primary Contact: ARMSTRONG, PAUL A & CHRISTI L Applicant: ARMSTRONG, PAUL A & CHRISTI L Address: 19311 E MAIN AVE GREENACRES, WA 99016-8607 Phone: Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 19311 E MAIN AVE 55173.1425 CORBIN ADDITION GUTHRIES VLY VW 5TH L25 B4 Water District: Consolidated Irrigation District #19 Owner: Address: Phone: Email: ARMSTRONG, PAUL A & CHRISTI L 19311 E MAIN AVE GREENACRES, WA 99016-8607 Fire District: Spokane Valley Fire Land Area: 9600 Square Feet CONTRACTOR INFORMATION: Owner Acting As Builder OWNER OWNER NOT KNOWN AT TIME OF ENTRY UNKNOWN, UK 00000 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 $125.00 Total Fee: $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 07/25/2012 10:25:40 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BW!LDIMG AND PLANNING PERMIT Application Number: SW -12001832 Permit Issued Date: 07/25/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/25/2012 10:25:40 Printed by: IIS APPPOOL\ASP.NET v4.0