Loading...
2012, 05-23 Permit: SW-12001403 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001403 05/23/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: HUNDLEY, SHAWN Project Name: ORCHARD AVENUE Applicant: HUNDLEY, SHAWN Permit Type: SEWER Address: 7122 E LIBERTY AVE SPOKANE, WA 99212-1531 Phone: Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning 7122 E LIBERTY AVE 35014.0149 Owner: HUNDLEY, SHAWN Address: 7122 E LIBERTY AVE SPOKANE, WA 99212-1531 ORCHARD AVENUE Phone: ORCHARD AVE ADD E100FT OF N117.25FT 8102 Email: CONTRACTOR INFORMATION: Owner Acting As Builder OWNER OWNER NOT KNOWN AT TIME OF ENTRY UNKNOWN, UK 00000 DETAILS: Water District: Orchard Fire District: Fire District 1 Avenue Irrigation District #6 Land Area: 0.2686 acres / 11700 sqft Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing - Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. ___________________________________ FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. -------------——————————————————————————————— — — — — — — Date Printed: 05/23/2012 07:53:00 Printed by: IIS APPPOOLVWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001403 05/23/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. —----------------------————————————————————————————— SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. ---------------------------------------------------- THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. —-------------———————————————————————————————— — — — — — — Date Printed: 05/23/2012 07:53:00 Printed by: IIS APPPOOL\ASP.NET v4.0