Loading...
2009, 02-12 Permit App: 09000306 GarageProject Number: 09000306 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/12/2009 Page 1 of 2 Project Information: Permit Use: NEW ATTACHED 2 CAR GARAGE Contact: BALL, KATHY J Address: 11917 E MAIN AVE C - S - Z: SPOKANE VALLEY, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 926-8551 Group Name: Project Name: Site Information: Plat Key: Name: OPPORTUNITY OIST ADD District: Nort Parcel Number: 45164.0324 Block: SiteAddress: 11917 E MAIN AVE Location:: CSV Zoning: R-3 Water District: Area: 27,900 Sq Ft SF Res District Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: . Lot: Owner: Name: BALL, KATHY .1 Address: 11917 E MAIN AVE SPOKANE VALLEY, WA 99206 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: Landuse/Zoning/HE Conditions 2/11/2009 By: tmelbourn Released By: Originally Released: 2/12/2009 By: cjjanssen Permits: , Operator: jmm Printed By: jmm Print Date: 2/12/2009 Project Number: 09000306 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/12/2009 Page 2 of 2 Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GARAGE U-1 VB 624 $11,856.00 624 $11,856.00 Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Notes: Totals: 624 $11,856.00 624 $11,856.00 Units Unit Desc 1 SELECT 1 SELECT I SELECT Permit Total Fees: Fee Amount $209.25 $4.50 $83.70 $297.45 Payment Summary: . Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $297.45 $297.45 $0.00 $297.45 $297.45 $297.45 $0.00 $297.45 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 2/12/2009 Sp®ltan` Valley. Community Development Permit Center r{ 11703 E Sprague Ave, Suite BI RECEIVED BY Spokane Valley, WA 9921 6ITy OF E?':WNT: VALLEY (509)688-0036 FAX: (509)688-0037 www.spokanevallev.org FEB 1 1 2009 Mi )' t:CNTER Residential Construction Permit Application PERMIT NUMBER: 7kD 3(Y, PERMIT FEE: ion U Accessory Bldg Addition/Remodel ❑ Deck Other: SITE ADDRESS: Will i ll E. R41J faVE n 17E ASSESSORS PARCEL NO: q S t 61-1 •0 3 24 LEGAL DESCRIPTION: Seth- ATT141 CH GS Building owner.340._ _ Contractor_,",� • + 'c _ _ - -, - •. , _ '_" Name: KAT�IY Name SAME- 044Ni52 Address: Ise j s• a1 -AK- goifoAddress: IMPERVIOUS SURFACE AREA: /J/,¢ City: SPcKAn,E VAl-t-Cy State: 144 Zip: q'( al e City: State: Zip: Phone: 5—b't _ 9.16., k5 -1 Fax: Phone: Fax: L^ aN O( Contractor Lic No: Exp Date: ,COniact,PerSon 1.*: . -. -= ----==---------- --- ='-_ `=.,-.' -` HEAT SOURCE: r1/A City Business Lic. No: 12/1M 84 Name: Eacc:J -a. - Phone: 50q- 958- q f 03 Describe the scope of work in detail: Cost of Project: $ Deo 4rr1 UiEJ Ywc C:4,( 6The4 4,E Proposed Use: &/o cc **************The following MUS rT% e co tete: (write N/A if not applicable **********************) HEIGHT TO PEAK: 15' 9" DIMENSIONS: 244' x 1b' # OF STORIES: 1 TOTAL HABJTABLE SPACE: .r/,4 MAIN FLOOR TO SQ. FTG: NIA 2"" FLOOR SQ. FTG: hi /4 UNFIN BASEMENT SQ. FTG: N IA IMPERVIOUS SURFACE AREA: /J/,¢ FINISHED BASEMENT SQ. FTG: N /A GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: N /4 30% SLOPES ON PROPERTY::` NSA L^ aN O( # OF BEDROOMS: rJIa CONSTRUCTION TYPE: woe') PRAME HEAT SOURCE: r1/A SEWER OR SEPTIC? srwc-(2-° ,x The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling; the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can b1e processed. '� SIGNATURE:c. /f,,ei ni / Method of Payment: �i 0 Cash ❑ Check Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Mastercard Expires: DATE: _2_II_ p9 ❑ VISA VIN#: SOkaneao# For City Use -Only PLUS Project Number 9- 030(0 Project Address I 1 0'11, 4'_ V1(a.L-n ) , 11703 E Sprague.Ave Suite B-3 ♦ Spokane Valley WA.99206 509,688.0036 1 Fax: 509.688.0037♦-permitcenter@spokanevatley.org As part of our on-going commitment' to custonier service during the review application, we are providing you with a TARGET DATE for the initial technical any reason wecannot meet this date, we will contact you with a revised: target date. Your application review TARGET DATE is c)/a+ [69. process :ofyour project, application review.. If for The TARGET DATE is the date we estimate your project application will have' had ;its initial technical': review. It is not the date for approval orpermit issuance. Tips for a Smoother Project Application Review: ➢ Submit complete, accurateplans and documents. , Echo time may be required for re -submittals as project application reviewers work on' multiple applications, and it may be .several days before they can look at your new or revised information. Designate a specific contact persomto communicate with the City. {Vhi/e the person designated as the applicant's contact poison with the City can 'be. changed, one individual with the expertise for dealing with reviewer comments would be the hest choice for the entire review process: , i Call staff regarding the status of your project only after the target date shown at the top of the page_ .41thongh von should be contacted on or by the target date, please feel free to contact us if von haven't heard from its ,, by your target date. Staff may contact you before the target date if the initial review is complete. By folloiring this procedure. you will save lime and allow the reviewers to complete /he work more expeditiously. '..• : Steps in the Permit Process • ' • 1. Counter Complete. Your application has been _accepted as counter complete.. This •means altof the required .• documents, as indicated on your Pre -Application Checklist have been submitted • or have : been approved for "deferred' • submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.'. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and tree . from substantive flaws that would prevent technical •staff from completing the technical review' once it is started'. When' this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. . , •. 3. Technical Conipliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. ,You should be contacted by phone, fax, email, or mail by your TARGET. DATE once the initial technical compliance review is complete. - 4. Permit Issuance.' When the technical. compliance review of the applic'atiomis complete, including any subsequentre ' submittals, each 'reviewer will approve their section of the application and route it to'the.Permit Center. 'When all sections of the application are received, a Permit Specialist will process the application and contact the person'specified on•your application for permit pick-up. information regarding fees and•pre-construction meetings %(ifrequired) will be provided by . the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 1 r vl 14 0 N ti N 207.7 0 w V. m L m PLANNING DEPT. APPROVED BYfl1 a -Li U kbV1ILLK3 DATE: .D/i1 L�iS•.g3