2010, 07-23 Permit App: 10002236 AdditionProject Number: 10002236 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/23/2010 Page 1 of 2
Proiect Information:
Permit Use: ADD ATTACHED DECK TO SW CORNER OF Contact: JOHNSTON, SUSAN
HOUSE Address: 12513 E MAIN ST
C - S - Z: SPOKANE VALLEY, WA 99216 -
Setbacks: Front Left: Right: Rear: Phone: (509) 921-2280
Group Name:
Site Information: Project Name:
Plat Key: 001838 Name: OPPORTUNITY TR # 01-354 District: Nort
Parcel Number: 45153.2729 Block:
SiteAddress: 12513 E MAIN AVE
Location:: CSV
Zoning: R-3 SF Res District
Water District: 011 MODERN
Area: 24,245 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Lot:
Owner: Name: JOHNSTON, SUSAN
Address: 12513 E MAIN ST
SPOKANE VALLEY, WA 99216 -
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review Information: .
Review
Building Plan Review
Released By:
Originally Released: 7/23/2010 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
Originally Released: 7/23/2010 By: Ibarlow
Permits:
Operator: jmm Printed By: jmm
Print Date: 7/23/2010
Project Number: 10002236 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/23/2010 Page 2 of 2
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation So Ft Valuation
DECK OPEN R-3 VB PLAN 360 $5,400.00 360 $5,400.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 360 $5,400.00 360 $5,400.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$125.25
$4.50
$50.10
Permit Total Fees: $179.85
Notes: ,
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $179.85 $179.85 $89.30 $90.55
$179.85 $179.85
$89.30 $90.55
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 7/23/2010
Permit Center
Scrry ae 11703 E Sprague Ave, Suite B-3
pokane Spokane Valley, WA -9920'
Vai¶egA_(509)6S8 00�6 • AXE• (509)68S-0037
_ www sp6kanevailey.ot'f; R
Community Development csV PCRA(Vi1 1't'47E
Residential Co'nstructipi
Permit Applicattin #
PERMIT NUMBER: (C - �-�3W
PERMIT FEE:
New Construction
lAddition/Remodel
lOther:
Accessory Bldg
Deck
SITE ADDRESS:
/z
ASSESSORS PARCEL NO:
mina.#r % ar in Av. Sjoc 1/ct/4J
4/5/5-3 , 27017 LEGAL DESCRIPTION: 770 Lin, t Les l
Building Owner:
Contractor:
Name:
�:"Sa & /VI itS74ct
Name:
Address :
J�.S/1e. Ma tri
Address:
City: Sicy � til State: WA- Zip:99..2l0 / /
City: State: Zip:
Fax:
Phone: 9J, /I 22S>0
Phone: Fax:
GARAG SQ. FTG:
Lo/ to 33
Contractor Lic No: Exp Date:
Contact Person
# OF BEDROOMS:
3
City Business Lic. No:
HEAT 9 RCE:
FA r
SEWER OR SEPTIC?
Sea/ ev
Name: C ci
Phone: 9,21.- ZZ gO
Describe the scope of work in detail:
Cost of Project: $ 3 0 c> C
Add M- i e -kJ ale e,, T St W, Corner of %4 vr-e
Proposed Use:
R� e riea -14o-t
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO %PEAK:
DIM`E�NSIO�SS
``SQ.
#OF DRIES:
T023H,ABI,ABLESPACE:
MAIN FLOOR TO SQ.
FTG:/ 1 9 2-
2NU FLOOR FTG:
--o--'
UNFIN BASEMENT SQ. FTG:
r
IMPERVIOUS SURFACElI
AREA y
FINISHED BASEMENT
SQ. FTG: 1( 3 3
GARAG SQ. FTG:
Lo/ to 33
DE( K/COV. PATIO Se. FTG:
6 o
30% SLOPES ON �rs1
PROPERTY: --�1
# OF BEDROOMS:
3
CONSTRUCTION TYPE:
Frame
HEAT 9 RCE:
FA r
SEWER OR SEPTIC?
Sea/ ev
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Wiley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: .2.1
Method of Payment:
Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
0 Check
DATE: 7"01'7-�
❑ Mastercard 0 VISA
Expires: VIN#:
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
❑ Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
❑ Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing o Window and door location and sizes
o Header, beam or concrete lintel sizes ❑ Window well locations if applicable
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
❑ Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
❑ Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
o Room usage labels
❑ Smoke detector locations
o Attic and crawl space access locations
❑ Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location ..
o Truss or rafter size, spacing & connection
❑ Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
❑ Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
Spokane
4...Valley°
For City Use Only /
PLUS Project Number /0 da3%
Project Address q aS/ 3 c iy�UL�
11703 E Sprague 'Ave Suite B-3 *.Spokane -Valley WA 99206 ` t -
'509.688.0036 • Fax: 509.688.0037.♦ perniitcenter®spokanevatte'y.org
As part of. our on-going_ comtnitnient •to customer service during the review process of your project'
application, we are providing you with a TARGET DATE for the initial technicalapplication rcvicw:'if for:
any reason we cannot meet this date, we will contact you with a revised ttaarget,date:;
Your application review. TARGET DATE is, •
The TARGET DATE is the date -.we estimate.your-project application.:will;have.had its-initialtechnical
review. It is not the date for approval,or•permit issuance.
• Tilts fora Smoother Project Application Review,
• Submit complete, accurate plans and documents.
Eviru time nun- be requiredfinur.re-.rubnriitals as project application reviewers ivo'k bir;nndiiple appliccitions uird it
maybe several days before the r can look al, ion' nen' 01 revised in/hrmaNuit
• Designate -a specific contact person to communicate with the City. '. ' '"
While the person designated as the applicant's contact person with the Citi can:heehanged'one'indiridual with the
expertise.for dealing with 1111/7? t viewer comments would be the best choice for the entire reriemprvicer.r.'
• Call staff regarding the status of your project only after the target date shown at the top of the page. .
Although you should be contacted un or ht, the target dale, please,Jecl free lu contact icy,f i_voi hayed 7 /mord fi'aat tt3 ,
by rum' turgel cline. Stall Burn contact 1011•be fordam e•the target daif the initial revicir' is -complete. !31' fo//oitidg this .
procedure, you will sure tune (111(1 a!/air the reviewer.( to complete the wink iirore etpeditiousli.
Steps in the Permit Process '
1. Counter Complete. Your, application has been accepted as counter complete.., This means all of the required .
documents, as indicated on your Pre -Application Checklist have been submitted or: have been., approv ed for, deferred '
submittal. This does not prevent technical staff linin requesting additional inIorination as.a result, of their technical revieis.. ,
2. Quality Check. The nest step in the process is a quality check to make'sure,,that the application is.reviecvable and tree'
from 'substantive flaws that ssould.prcvcnt technical staff from completing the technical review once itis started._.When
this step is complete, your application, will be routed to the appropriate. staff ,and remain in .their review queile Until it
comes up for review. . , . • r. , ,
•
3. Technical Compliance. Once an application is administratively complete, it is routed to;technical stall for compliance
• review. Depending on. the type of project, technical staff may include multiple revievers..You should' be contacted by .'
phone, fax. entail, or mail by your I'ARCET DATE once the initiartechnical'contpliance review iscomplete. , •
•
•
4. Permit Issuance. When the technical compliance review ofthe•application is complete, including any. subsequent re- -
submittals. each reviewer will approve their section.of the application and route it to the Permit Center.. When all sections
of the application are received. a Permit Specialist will process the application and contact the,person 'specified on your '
application for permit pick-up..Inibrnmtion regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE —APPLICANT PINK — BUILDING FILE
' REV 9/07
r 1 •.
CSV PERMIT CENTER
_%✓l0.1 h - Ave.—