Loading...
2012, 06-08 Permit: SW-12001511 SewerSPOKANE COUNTY BUILDING AND PLANNING PERI►,IIIT - Permit Issued Date: Application Number: SW -12001511 06/08/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: PIERSOL CONSTRUCTION INC Project Name: GUTHRIE'S VALLEY VIEW 6TH ADDITION Applicant: PIERSOL CONSTRUCTION INC Permit Type: SEWER Address: 2233 S GARFIELD RD AIRWAY HEIGHTS, WA 99001 Phone: 509-535-2901 Email: SITE INFORMATION: Site Address: 13209 E MALLON AVE Owner: DENN, AARON M & CASSANDRA L C Parcel Number: 45151.1504 Address: 13209 E MALLON CT SPOKANE, WA 99216-1015 Subdivision: GUTHRIES VALLEY Phone: VIEW 6th ADDITION Assessor's Description: GUTHRIE'S VALLEY VIEW 6TH ADD L4 B1 Email: Inspection Area: Water District: Modern Fire District: Spokane Valley Fire Electric Water Company Zoning: Land Area: 0.5074 acres / 22104 sqft CONTRACTOR INFORMATION: General Contractor PERSC10550Q *PIERSOL CONSTRUCTION INC 2233 S GARFIELD RD AIRWAY HEIGHTS, WA 99001 509-535-2901 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing - Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 06/08/2012 12:11:53 Printed by: IIS APPPOOLASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001511 06/08/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/08/2012 12:11:53 Printed by: IIS APPPOOLWSP.NET v4.0