2012, 06-08 Permit: SW-12001511 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERI►,IIIT
-
Permit Issued Date:
Application Number: SW -12001511 06/08/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: PIERSOL CONSTRUCTION INC
Project Name: GUTHRIE'S VALLEY VIEW 6TH ADDITION Applicant: PIERSOL CONSTRUCTION INC
Permit Type: SEWER Address: 2233 S GARFIELD RD
AIRWAY HEIGHTS, WA 99001
Phone: 509-535-2901
Email:
SITE INFORMATION:
Site Address: 13209 E MALLON AVE Owner: DENN, AARON M & CASSANDRA L C
Parcel Number: 45151.1504 Address: 13209 E MALLON CT
SPOKANE, WA 99216-1015
Subdivision: GUTHRIES VALLEY Phone:
VIEW 6th ADDITION
Assessor's Description: GUTHRIE'S VALLEY VIEW 6TH ADD L4 B1 Email:
Inspection Area:
Water District: Modern Fire District: Spokane Valley Fire
Electric Water Company
Zoning: Land Area: 0.5074 acres / 22104 sqft
CONTRACTOR INFORMATION:
General Contractor
PERSC10550Q
*PIERSOL CONSTRUCTION INC
2233 S GARFIELD RD
AIRWAY HEIGHTS, WA 99001
509-535-2901
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing - Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 06/08/2012 12:11:53 Printed by: IIS APPPOOLASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001511 06/08/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/08/2012 12:11:53 Printed by: IIS APPPOOLWSP.NET v4.0