Loading...
1972, 08-11 Permit App: J4067 BarnCounty of Spokane, Washington BUILDING CODES DEPARTMENT, COURTHOUSE, SPOKANE, WASHINGTON 99201 APPLICATION FOR LAND USE OR STRUCTURE PERMIT icy ° GENERAL REQUIREMENTS PERMIT FEE PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any kind or alter any building or structure already erected, or to change a land use. Construction must conform with the Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection. WATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office. SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos, 45-133 and 47.235. SET -BACK' FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required. STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress and egress. COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer. MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State Highway, clearance must be obtained from the County Engineer and/or State Highway Department. ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit. RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land which are enforceable through civil action. County Officials can not bring action to enforce covenants or dedications. APPLICANT FILL IN BELOW THIS LINE 99,3/(0 Name of Owner .� i� �../. ddress e /gilds 71,64Lset, aim Phone N/.4 / -/07L Architect Phone Engineer Phone Contractor Address Phone Legal Descript'on of Propert (Give complete description from deed, tax receipt, etc.) /3.543 Z./.� DESCRIPTION OF WORK: New_/ . Addition Moving • Bldg. Zone _L— Fire Zone Size of ��L//ot aze Lt4 q¢' / Sewage System Stories / 00 Constsq Dimensions //�X�g Total Sq Ft 39.2 Valuation 4S00 (Frame, concrete, brick, etc.) /� �j Rooms Baths — Basement — Foundation Const t_M4JC 4 ,/3- L' Chimney -- Fireplace -- (Full, part, none)(Kind) (Number) Heat. System Type of Roofing O L Ext Finish T-/// Int Wall Finish Use of Bldg. —,C ,// J,1.0 -rt/ itl.t Garage or Carport Attached Private Detntched Remodel No. of Units Bedrooms PLOT PLAN Draw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys- tem and water supply lines. NORTH rn rn y State License No. D K - ®,amu-nf-f- Ind. Ins. Acct. No. REQUIRED Plumbing Permit m Heating Permit Sewage Permit Plans Received 1� Plans Checked P' Plans Returned Plans Picked Up Plans Mailed SOUTH AlAi.v AVE I hereby ce$y inforpatio ubmf9ed is correct and there are no other structures located on this property except as shown, Sr-o-� Owner or Agent Date A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES. THIS 1S NOT A PERMIT. DO NOT WRITE BELOW THIS LINE Your street address will be e /' 90 3 Sewage Permit Number Issued Building 'er Remarks • e zone 1 .u...e.<ISL'J it , / lReceiptR.59'I Issued - Form 523 Bldg. Code