Loading...
2011, 01-12 Permit App: 10004157 Pole BldgProject Number: 10004157 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: BLDG POLE BLDG - 30 x 40 Contact: STEEL STRUCTURES OF AMERICA Address: PO BOX 895 C - S - Z: POST FALLS ID 83877 Setbacks: Front Left: Right: Rear: Phone: (208) 777-8597 Group Name: Project Name: Site Information: Plat Key: 002762 Name: VERADALE HEIGHTS District: East Date: 1/12/2011 Page 1 of 2 Parcel Number: 45142.0911 Block: Lot: SiteAddress: 14203 E MALLON AVE Location:: CSV Zoning: R-4 SF Res Urban District Water District: 010 VERA Area: 13,580 Sq Ft Width: 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Owner: Name: BREWER, DENISE E Address: 14203 E MALLON AVE SPOKANE VALLEY, WA 99216 Hold: Depth: 0 Right Of Way (ft): 0 Released By: Originally Released: 1/7/2011 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 1/11/2011 By: tschmidt Permits: Operator: jmm Printed By: JD Print Date: 1/12/2011 Project Number: 10004157 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 1/12/2011 Contractor: STEEL STRUCTURES AMERICA Address: PO BOX 895 POST FALLS, ID 83854 Description Grp Type POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Notes: Payment Summary: Permit Type Building Permit Building Permit Firm: STEEL STRUCTURES AMERICA I Phone: (800) 833-9997 This Application: Notes Sq Ft Valuation PLAN 1,200 $22,800.00 REVIEW FEE Totals: 1,200 $22,800.00 Units Unit Desc 1 1 1 SELECT SELECT SELECT Permit Total Fees: Fee Amount Invoice Amount $458.56 $458.56 $458.56 $458.56 Total Project: Sq Ft Valuation 1,200 $22,800.00 1,200 $22,800.00 Fee Amount $363.25 $90.81 $4.50 Amount Paid $97.81 $97.81 $458.56 Amount Owing $360.75 $360.75 Page 2 of 2 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 1/12/2011 *lane 4o,VaI%yti Community Development Residential Construction Permit Application Lt —/ 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org YtK1V111 IN U1v113D1c: PERMIT FEE: New Construction Accessory Bldg Addition/Remodel Deck Other: SITE ADDRESS: I ` 20 3 1 /t Q / ldvt Col y (34 foram e (/Ql /r.l (()/1 ?9 /6 ASSESSORS PARCEL NO: SISIIZa 04 J / LEGAL DESCRIPTION: L04'9 bt k. ,Tiu► , AA.C1 -tri Building Owner: Name: Lie LI t 5e cu>r/ . 140 d1 S 14n to Address: lya0t /' ailevt City: J�Pn / ✓r P lin lei State: IA Zip:c4,Z,. ley I Phone: g9 l _a I /(/ Fax: Contact Person Name:�! qye_ il0.v151a1L) Phone: 5y.2 - 6 if Describe the scope of work in detail: Contractor: t., V DIMENSIONS: O x 40 x,~ 1 Name:`-l�ce t �J4- r Tri/t5 A wierred': MAIN FLOOR TO SQ. FTG: % 1.0c. 05 2N FLOOR SQ. FTG: /VA Address: PD -ex k g9l 5 IMPERVIOUS SURFACE / (X) FINISHED BASEMENT SQ. FTG: State: :-.17:04 toZ1pJ City: i(95T red diS DECK/COV. PATIO SQ. FTG: ? } 7 Phone$00 ' 833 " c19 Fax Faxx - _777' 493.-q 7 HEAT Cont arC SSA 'i' sv Exp Date: City Business Lic. No: td a Cost of Project: $ 25/ 065--.-3 <-/t),x`tflx,i`i sky) /Alio /s e %ut i61"41 Proposed Use:�-w-e / /-I L ' Sty J **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: 19 The DIMENSIONS: O x 40 x,~ # OF STORIES: J. TOTAL HABITABLS qCE: / 3 / t Ave.(W-0, MAIN FLOOR TO SQ. FTG: % 1.0c. 05 2N FLOOR SQ. FTG: /VA UNFIN BASEMENT SQ. FTG: it)/4AREA: IMPERVIOUS SURFACE / (X) FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG // 1, � �(� 70 DECK/COV. PATIO SQ. FTG: ? } 30% SLOPES ON PROPERTY: /(% # OF BEDROOMS: PE: COSR� ; I��J � S HEAT SE �R SEPTI �� permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 0 Check 0 Mastercard Expires: DATE: ) (;) - a-8- i O ❑ VISA VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. 0 SITE PLAN operty lines and dimensions rection arrow pointing North and orientation to streets roposed/existing buildings (footprint and dimensions) Utilities, septic tank/drain field locations and distances S tbacks to property lines Qistance between buildings Rjght of way/easement location & sizes riveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) Er Elevations (Front/Rear/Sides) with roof peak and wall height including basement: &Foupdation Plan (crawlspace, basement or slab on grade): Doting sizes and locations its`❑ Supporting wood cripple walls or beams erimeter concrete foundation wall sizes ii/k❑ Thickened concrete pads supporting beams or girder trusses fi A ❑ Crawlspace ventilation Et/Floor Plan of each level (finished or unfinished) with dimensions: "Floor Joist direction, size and spacing Header, beam or concrete lintel sizes ra'$race wall panel locations ►/Vater heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations "Roof Plan: "Engineered truss direction and spacing "Rafter and over frame direction, size and spacing 'Wall Section Detail including: Roof "Slope/ roofing material/ underlayment/ ice dam protection aSheathing size and type Ceiling 13/joist size and spacing Wall "eight/ top plate/ stud size and spacing/ sole plate rxterior sheathing size and type Floor iiJoist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing ize Radon o Passive system with 6mi1 vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Stairway tread rise & run and nosing ®'Window and door location and sizes )jrWindow well locations if applicable .sef Room usage labels Smoke detector locations 1'Attic and crawl space access locations ,hire Wall construction • Ridge, eave and valley lines Leam and girder size and location g'Truss or rafter size, spacing & connection in -Attic insulation/ air space baffle/ ventilation Mize of ceiling gypsum wall board izSiding/ exterior house wrap/ anchor bolts d(nsulation, vapor barrier, gypsum wall board dSheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations o Handrail / Guard height & spacing TO THE CITY OF SPOKANE VALLEY 12-27-2010 COMMUNITY DEVELOPMENT DEPARTMENT. I AM APPLYING FOR A VARIANCE PERMIT UNDER AN ADMINISTRATIVE EXCEPTION FOR THE PURPOSE OF INCLUDING A COVERED PATIO SECTION ON MY SOON TO BE BUILT HOBBY SHOP STORAGE BUILDING AT 14203 E. MALLON. YOU WILL FIND IN THE APPLICATION DETAILED DRAWINGS OF THE EXISTING BUILDING AND PLANS FOR THE NEW STRUCTURE. MY FIANCEE AND I HAVE JUST RECENTLY PURCHASED THIS HOME WITH THE SOLE INTENTION TO ADD THE NEW BUILDING AND COVERED PATIO AS TO AID US IN THE ABILITY TO STORE THINGS FOR MY ELDERLY MOTHER THAT WILL UNDOUBTABLY BE LIVING WITH US IN THE NOT TO DISTANT FUTURE . WE HAD PURCHASED THIS HOME WITH THE INTENTION OF MAKING THIS ADDITION TO THE PROPERTY AND TO FIND OUT THAT THIS MAY NOT BE ALLOWED WOULD BE DEVISTATING AS WE WOULD HAVE NO OTHER OPTION BUT TO TRY TO RE -SELL THE HOME AND MOVE TO A PLACE THAT WOULD ALLOW SUCH A STRUCTURE. AS YOU CAN SEE BY THE PROPOSED SITE PLANS ,THE ADDITIONAL AREA NEEDED IS FAR LESS THAN THE 25 PERCENT ALLOWED WITH THE ADMINISTRATIVE EXCEPTION. WE REALLY NEED TO HAVE THIS COVERED PATIO AREA SO THE EVENING SUNSETS CAN BE ENJOYED AND TO PROVIDE A GATHERING PLACE FOR OUR FAMILY TO ENJOY TIME TOGETHER. THANK YOU FOR YOUR CONSIDERATION ON THIS MATTER. Sincerely, , DAVE HANSHAW DENISE BREWER 41;.4.4, ,ui.(/1 14203 E. MALLON LOT 9,BLOCK 2,THIRD ADDITION TO VERADALE HEIGHTS. VOL.4, PAGE 47 SPOKANE COUNTY Spokane jUalley For City Use Only PLUS Project Number Project Address / 1-, ll , 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is /'1i' The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 10' 20' 30' 40' 50' 60' 70' 80' 90' STEEL STRUCTURES AMERICA, INC. 1-800-833-9997 Name 0,01.1)-4- Ala ngsha.+.c? '4- D €1415 QR. e, ate, Mailing Address City State Zip Job Address 1 Y 2.0 3 E. ma If H City S pe k s Vat;' 1 State w 01" - County S feekacr.ja Zip q CIAR2 Telephone Home Work et ¶ Appt. Time Date Sidewal! Gable Building Size x x 0 10' 20' 30' r 40' 50' 60' 70' 80' 90' SO' (Q0' 10` V • — f Cro6, 17 A a,613 , rya!IeH Customer Signature 5, LP, s1. DATE: NI Sales Signature