2012, 09-10 Permit: SW-12002160 Sewer4
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002160 09/10/2012
Expiration Date:
Project Description: SEWER CONNECTION
Primary Contact:
CATLOW PROPERTIES, LLC
Project Name: SUTTERS
Applicant:
CATLOW PROPERTIES, LLC
Permit Type: SEWER
Address:
PO BOX 1410
Subdivision:
ADAMS COURT
VERADALE, WA 99037-1410
Assessor's Description:
Phone:
509-922-2229
Inspection Area:
Email:
SITE INFORMATION:
Site Address:
1128 S JOYCE
Owner: CATLOW PROPERTIES, LLC
Parcel Number:
45233.1510
Address: PO BOX 1410
VERADALE, WA 99037-1410
Subdivision:
ADAMS COURT
Phone: 509-922-2229
Assessor's Description:
ADAMS COURT TR 1
Email:
Inspection Area:
Water District: Vera
Fire District: Spokane Valley Fire
Irrigation District #15
Zoning:
Land Area: 12524 Square Feet
CONTRACTOR INFORMATION:
General Contractor
GRBELE1044DA
G R BELL EXCAVATING INC
PO BOX 1180
MEAD, WA 99021
509-466-1818
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
CONDITIONS:
$25.94
$125.00
Total Fee: $150.94
Inside Public Transit Benefit Area
-----------------------------------------------------
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
----------------------------------------------------
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
—--------------————————————————————————--————-- — — — — — —
Date Printed: 09/10/2012 09:05:35 Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002160 09/10/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
_APPLY AFTER 3_0_ MINUTES ._________________________________________
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
—----------------------————--———————————————————————
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
----------------------------————————————————————————
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
—-------------——————--———————————————————————— — — — — — —
Date Printed: 09/10/2012 09:05:35 Printed by: IIS APPPOOL\ASP.NET v4.0