Loading...
2012, 04-03 Permit: SW-12001056 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12-001056 Permit Issued Date: 04/03/2012 Expiration Date: Project Description: Permit Type: SEWER CONNECTION SEWER Primary Contact: FOX DIRT WORK Applicant: FOX DIRT WORK Address: 2307 S BEST RD SPOKANE VALLEY, WA 99037 Phone: 509-362-1892 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: 14412 E MALLON AVE 45142.4002 RICHARD'S 2ND ADDITION RICHARDS 2ND ADDITION TO VERADALE LT 2 BLK 2 Owner: Address: Phone: Email: SPOKANE TEACHER CREDIT UNION 1620 N SIGNAL DR LIBERTY LAKE, WA 99019-9517 Water District: Vera Fire District: Fire District 1 Irrigation District #15 Zoning: Land Area: 0.2378 acres / 10357 sqft CONTRACTOR INFORMATION: General Contractor FOXDIDW976MQ FOX DIRT WORK 2307 S BEST RD SPOKANE VALLEY, WA 99037 509-362-1892 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Possible Wetland On Site CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 04/03/2012 10:15:33 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12-001056 ' 04/03/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/03/2012 10:15:33 Printed by: IIS APPPOOL\ASP.NET v4.0