2012, 07-25 Permit: SW-12001844 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001844 07/25/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: ALPINE EXCAVATING
Applicant: ALPINE EXCAVATING
Permit Type: SEWER Address: PO BOX 141993
SPOKANE,WA 99214
Phone: 509-892-5227
Email:
SITE INFORMATION:
Site Address: 7203 E LIBERTY AVE Owner: SMITH, NORMAN L&SHERRILL L
Parcel Number: 35014.0118 Address: 7203 E LIBERTY AVE
SPOKANE,WA 99212
Subdivision: ORCHARD AVENUE Phone:
Assessor's Description: ORCHARD AVE ADD W100FT B61 Email:
Inspection Area:
Water District:Orchard Fire District:Spokane Valley Fire
Avenue Irrigation District
#6
Zoning: Land Area: 15000 Square Feet
CONTRACTOR INFORMATION:
General Contractor
ALPINE*012JZ
ALPINE EXCAVATING
PO BOX 141993
SPOKANE,WA 99214
509-892-5227
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed:07/25/2012 14:25:44 Printed by:IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001844 07/25/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES. _
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:07/25/2012 14:25:44 Printed by:IIS APPPOOL\ASP.NET v4.0